Questions_and_Answers_3_May_2013.docx

DOCX document 17 KB Posted

Attached to
A/S32 R-11 Refueler Federal contract opportunity
Solicitation number
FA8533-12-R-35653
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to A/S32 R-11 Refueler, newest first.
File Type Posted
Questions_and_Answers_23_May_2013.docx DOCX document
Question_and_Answer_13_May_2013.docx DOCX document
Questions_and_Answers_08_May_2013.docx DOCX document
R11ChangePage208May2013.pdf PDF
FA853312R35653_0003.pdf PDF
R11ChangePage130Apr2013.pdf PDF
FA853312R35653_0002.pdf PDF
B001TMCR.pdf PDF
Questions_and_Answers_25_April_2013.docx DOCX document
FA8533-12-R-35653-0001.pdf PDF
EDL.pdf PDF
GeneralEngineeringNotes.pdf PDF
RequestforDeviation.pdf PDF
ConferenceMinutes.pdf PDF
TechnicalReportStudyServicesServiceBulletin.pdf PDF
R11TMCRB001.pdf PDF
ContractorsProgressStatusManagementReport.pdf PDF
SystemSafetyHazardAnalysisReport.pdf PDF
FA853312R35653_FINAL.pdf PDF
Attachment1QuantityRanges.doc DOC document
TechnicalReportStudyServicesTechnicalReviewData.pdf PDF
SPI.pdf PDF
EngineeringChangeProposal.pdf PDF
ProductBaselineIndex.pdf PDF
ConferenceAgenda.pdf PDF
TestInspectionReport.pdf PDF
SystemSafetyProgramPlan.pdf PDF
Form158.pdf PDF
NoticeofRevision.pdf PDF
TestProcedure.pdf PDF
R11SOW27Mar2013.pdf PDF
TechnicalReportStudyServices.pdf PDF
InstructionalMediaPackage.pdf PDF
MILPRF32080E.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers

FA8533-12-R-30317

3 May 2013

The following questions are relative to Performance Specification Paragraph 3.8.2 Pumping system: (e.)

1. Question: If we control the HSM to 700 gpm with a maximum hydrant inlet pressure of 130 psig when filling the cargo tank. When a higher pit or inlet pressure is provided to a HSM is the high flow rate acceptable?

Answer: No. See Amendment 0002 to the RFP, change page 1 dated 29 Apr 2013 for requirement clarification.

2. Question: The truck engine shall be operating and in the High Flow mode, High Pressure setting. The HSM shall not utilize the EACS for regulating the flow and pressure control system. In this mode the EACS is active - can it work as a secondary means? The primary will be the pit valve and also control valves in the system.

Answer: No.