Questions and Answers
FA85-12-R-35653
23 May 2013
1. Question: On page 4 of the TMCR it states that files must be authored in SGML. Since the manual is considered COTS, can the TO be authored in XML?
Answer: XML is not acceptable for COTS or Mil-Spec Manuals. In accordance with TMCR, Part B- TM Delivery Requirements, Page 9:
· The Contractor shall provide COTS manuals for the engine, transmission and chassis in mixed paper and digital (Non password protected Indexed Portable Document Format "IPDF").
· The Mil-Spec Manuals for the mounted equipment shall be Mixed Paper and digital (Standard Generalized Mark-up Language" SGML").
2. Question: The CLINS are organized such that the government can order trucks with or without the hydrant servicing module. In order to arrive at the best cost can an estimate of the number of trucks that might be ordered with this option be provided?
Answer: The Best Estimated Quantities (BEQs), as stated in the Schedule, are the Government’s estimate.
3. Question: We have only identified one potential source for this patent pending technology; please advise us of all the sources of the technology that the Government has identified.
Answer: It is the offeror’s responsibility to locate the resources needed or develop the capability in order to comply with the requirements of the Performance Specification and Statement of Work.
4. Question: Please quantify the energy and fuel efficiency values required in order to satisfy the improvement indicated in your previous answer to question number 32.
Answer: The Government has stated its requirements for an engine automated control system in order to maximize energy efficiency and minimize fuel consumption. However, the solicitation does not identify a specific energy and fuel efficiency value.
5. Question: Request a one (1) month extension.
Answer: The solicitation was issued 03 April 2013 with a closing date of 3 May 2013. We’ve already extended numerous times. Therefore, your request for an extension is denied. Proposals are due 24 May 2013, 12:00 p.m. EST