PurchaseDescriptionRevision1.pdf
PDF 19 KB Posted
- Attached to
- B-52 Drag Chute Maintenance Stand Federal contract opportunity
- Solicitation number
- FA8533-09-R-22041
About this file
Purchase Description Revision 1
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVISION 1
27 MARCH 2009
PD08WRGBGBEA24
PURCHASE DESCRIPTION B-52 DRAG CHUTE MAINTENANCE STAND
20 NOVEMBER 2008
1. PD08WRGBGBEA24 PURCHASE DESCRIPTION B-52 DRAG CHUTE MAINTENANCE
STAND:
Change all locations: From called out Preproduction To
3.1 First Article. One (1) First Article B-52 Drag Chute Stand shall be subjected to first article inspection…..
3.7 Safety standards. The B-52 Stands …..during the First Article Operational Inspection.
4.1 Classification of inspections. The inspection requirements specified herein are classified as follows:
a. First Article inspection (see 4.2)…..
4.2 First article inspection. The first article B-52 Drag Chute Stand…..
4.3 Operational inspection. A 30-day.….completion of the first article tests specified…..
4.6.3 Human factors demonstration. The first article B-52 Drag Chute Stand…..
4.6.5.1 High temperature storage and operation test. A first article B-52 Drag Chute Stand…..
4.6.5.2 Low temperature storage and operation test. A first article B-52 Drag Chute Stand…..
4.6.5.3.1 Rain test. A first article B-52 Drag Chute Stand…..
4.6.5.3.2 Ice accretion test. A first article B-52 Drag Chute Stand…..
4.6.5.4 Salt fog test. A first article B-52 Drag Chute Stand…..
4.6.5.5 Sand and dust test. A first article B-52 Drag Chute Stand…..
4.6.6.3 Equipment removal and reconfiguration test. A first article B-52 Drag Chute Stand
4.6.9.1 Dimension measurement tests. A first article maintenance stand…..
4.6.9.2 Weight measurement tests. The weight of a first article maintenance stand…..
4.6.9.3 Platform load tests. The first article maintenance stand …..
4.6.9.4 Platform requirements tests. A first article maintenance stand …..
4.6.10 Towing/maneuverability tests. A first article maintenance stand …..
4.6.10.1 Caster tests. A first article maintenance stand …..
4.6.10.2 Rolling force/resistance tests. A first article maintenance …..
4.6.11 Hoist tests. A first article maintenance stand …..
4.6.12 Stabilizer jack tests. A first article maintenance stand…..
6.2 Acquisition requirements. Acquisition documents …..
b. If first article inspection is required…..
2. PARAGRAPH 2.2.1 SPECIFICATIONS, STANDARDS, AND HANDBOOKS:
Revise the Department Of Defense Standards: From MIL-STD-810F(3) To MIL-STD-810G
3. PARAGRAPH 3.3.5 HUMAN FACTORS:
Revise the sentence: From including the use of arctic mittens and Mission-Oriented Protective Posture (MOPP) Level 4 Chemical Warfare Gear.
To including the use of arctic mittens and/or Mission-Oriented Protective Posture (MOPP) Level 4 Chemical Warfare Gear.
4. PARAGRAPH 3.5.2 AIR TRANSPORTABILITY:
Revise the last sentence: From The B-52 Stand shall be equipped with pressure relief devices or configured for air transport to prevent any part from becoming a projectile in the event of catastrophic loss of aircraft cabin pressure.
To The B-52 Stand shall be configured for air transport to prevent any part from becoming a projectile in the event of catastrophic loss of aircraft cabin pressure. The maintenance stand shall roll on and off the aircraft, negotiating the required maximum ramp angles without shoring.
5. PARAGRAPH 3.10 INSTRUCTIONAL MEDIA PACKAGE:
Revise the second sentence: From. Courses shall provide training on servicing, operational checks, theory of operation, adjustment procedures, troubleshooting, and associated diagrams.
To Courses shall provide instructions on servicing, operational checks, theory of operation, adjustment procedures, troubleshooting, and associated diagrams.
6. PARAGRAPH 4.3 OPERATIONAL INSPECTIONS:
Revise the paragraph: From A 30-day operational inspection will be performed following the successful completion of the first article tests specified section 4.6. The inspection will be performed at locations chosen by the Government and defined in the contract. The inspection will begin the day following the delivery of the B-52 Drag Chute Stand to the specified locations.
To A 5-day operational inspection will be performed following the successful completion of the first article tests specified in section 4.6. The inspection will be performed at Barksdale AFB. The inspection will begin the day following the delivery of the B-52 Drag Chute Stand to Barksdale AFB.
7. PARAGRAPH 4.6.3 HUMAN FACTORS DEMONSTRATION:
Revise the sentence: From inspection tasks by personnel wearing arctic mittens and MOPP Level 4 Chemical Warfare Gear to demonstrate compliance with the requirements of 3.3.5.
To inspection tasks by personnel wearing arctic mittens and/or MOPP Level 4 Chemical Warfare Gear to demonstrate compliance with the requirements of 3.3.5.
7. PARAGRAPH 4.6.5 ENVIRONMENTAL TESTS:
Change the following:
From 4.6.5.1 High temperature storage and operation test. Method 501.4 To Method 501.5 From 4.6.5.2 Low temperature storage and operation test. Method 502.4 To Method 502.5 From 4.6.5.3.1 Rain test Method 506.4 To Method 506.5 From 4.6.5.3.2 Ice accretion test. Method 521.2 To Method 521.3 From 4.6.5.4 Salt fog test. Method 509.4 To Method 509.5 From 4.6.5.5 Sand and dust test. Method 510.4 To Method 510.5
8. PARAGRAPH 4.6.6.1 SURFACE TRANSPORTABILITY ANALYSIS:
Revise the last sentence: From Method 514.5.
To Method 514.6.
9. PARAGRAPH 4.6.7 MAINTAINABILITY DEMONSTRATION:
Revise the last sentence: From personnel wearing arctic mittens and MOPP Level 4 Chemical Warfare Gear shall be demonstrated.
To personnel wearing arctic mittens and/or MOPP Level 4 Chemical Warfare Gear shall be demonstrated.
TODD BALDUCCI \ 642 CBSG/GBEA \ 2-1370 \ 27 MARCH 2009.
File details come from the government source that posted it. Updated .