PerformanceQuestionnaire.doc

DOC document 48 KB Posted

Attached to
B-52 Drag Chute Maintenance Stand Federal contract opportunity
Solicitation number
FA8533-09-R-22041
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

Performance Questionaire

View the file

Other files for this federal contract opportunity

Other files attached to B-52 Drag Chute Maintenance Stand, newest first.
File Type Posted
C-17 MH1791 —
9626025D.doc DOC document
9579776G.doc DOC document
9579777A.doc DOC document
FA853310R220410002.pdf PDF
FA853310R220410001.pdf PDF
FACTSSheet.doc DOC document
RequestforDeviationD00F.pdf PDF
FA853310R22041.pdf PDF
QuantityRanges.doc DOC document
TransmittalLtr.doc DOC document
SOW.doc DOC document
WeldingProceduresD00A.pdf PDF
EDLMasterbidSet.pdf PDF
PurchaseDescription.pdf PDF
ConferenceMinutesD003.pdf PDF
CorrosionPreventionandControlPlanD009.pdf PDF
ClientAuthorizationLtr.doc DOC document
LMISummariesB003.pdf PDF
SupplementalDataforProvisioningB001.pdf PDF
EngineeringChangeProposalNoticeofRevisionD007D008.pdf PDF
WarrantyPerformanceReportD001.pdf PDF
ProductDrawingModelsD00C.pdf PDF
InstructuaMediaPackageD002.pdf PDF
TMCRC001.pdf PDF
DesignDataCalculationsD006.pdf PDF
PurchaseDescriptionRevision1.pdf PDF
LMIDataProductsB002.pdf PDF
TestPlanTestReportA001A002.pdf PDF
ProductlineIndexD004.pdf PDF
ContractorsProgressStatusmaqnagementRptD005.pdf PDF
ManagementPlanIntergratedmasterScheduleD00DD00E.pdf PDF
ConferenceAgendaD00B.pdf PDF
RFI B-52 Drag Chute.doc DOC document
PurchaseDescription.doc DOC document
RFI Ltr.pdf PDF
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOURCE SELECTION INFORMATION - SEE FAR 2.101 and 3.104

REQUEST FOR PROPOSAL FA8533-10-R-22041

ATTACHMENT 5

PRESENT/PAST PERFORMANCE QUESTIONNAIRE

PLEASE PROVIDE THE FOLLOWING INFORMATION ABOUT YOURSELF:

Name/Signature and Role Relative to Contract (e.g. Buyer, Program Manager):________________________________________________________

Agency or Business: ______________________________________________________________________________________________________ ________________________________________________________________________________________________________________________

Address: _______________________________________________________________________________________________________________ _______________________________________________________________________________________________________________________

Telephone No. _______________________________ FAX No. ____________________________________

Return your completed questionnaire via fax to (478) 222-1854 or electronically mail to Elizabeth.Midkif@robins.af.mil. Please Call (478) 222-1896 before transmitting by fax to ensure confidentiality.

NOTICE: WHEN COMPLETED, THIS QUESTIONNAIRE WILL BE CONSIDERED SOURCE SELECTION SENSITIVE INFORMATION AND WILL NOT BE RELEASED TO THE OFFEROR.

Part I. SPECIFIC PROGRAM INFORMATION:

Contractor/Business: _____________________________________________

CAGE Code: __________

Program Title and Brief Description: _____________________________________________________________________________________

Contractor’s Role in the Program:

_____Prime _____Subcontractor _____Vendor/Supplier

Contract Number: ________________________________ Number of Years? Basic:________ Option: _________

Contract Type(s), i.e. Firm-Fixed-Price, Time & Materials, Cost, etc:

SOURCE SELECTION INFORMATION - SEE FAR 2.101 and 3.104

PART II. GENERAL PROGRAM INFORMATION:

Period of Performance (assuming all options exercised) of Contract or Effort: Beginning Date _________ through ____________

Current Dollar Value (assuming all options exercised): ________________________________________________________________

PART III. PERFORMANCE ASSESSMENTS: NOTE: If respondent does not provide information to support any marginal, very good, or exceptional ratings that it may assign, the Government will interpret the rating as being a satisfactory one. Should your response be other than “satisfactory,” please provide supporting documentation in “Additional Remarks” on page 3 of 4. Please check the appropriate rating for each of the following questions:

Not Applicable
Unsatis-factory
Marginal
Satisfactory
Very Good
Excep-tional

1. Extent to which Company’s products and/or services met the requirements of your contract or project:

2. Company’s proficiency with preparing technical data such as service bulletins, operations and maintenance manuals, or instructional videos:

3. Company’s history with timely deliveries of products/services and invoices:

4. Customer’s satisfaction with the company’s response to warranty claims, corrective actions, product recalls, and/or other “after the sale” actions:

5. Company’s knowledge and proficiency with industry specifications and standards, e.g. SAE, ASME, NEC, etc.

6. Quality of completed product:

SOURCE SELECTION INFORMATION - SEE FAR 2.101 and 3.104

7. Have there been any disputes/claims relative to the contract, or action of any kind to terminate performance? If yes, explain.

8. Describe the contractor’s strong and/or weak characteristics:

9. If given a choice, would your company award to this contractor again? If not, please explain. ________________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________________

10. Additional Remarks.

SOURCE SELECTION INFORMATION - SEE FAR 2.101 and 3.104

RFP FA8533-10-R-22041

PRESENT/PAST PERFORMANCE QUESTIONNAIRE

ASSESSMENT RATING SYSTEM

E EXCEPTIONAL: Performance meets contractual requirements and exceeds many requirements. The contractual performance being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

V VERY GOOD: Performance meets contractual requirements and exceeds some requirements. The contractual performance being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

S SATISFACTORY: Performance meets contractual requirements. The contractual performance being assessed contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

M MARGINAL: Performance does not meet some contractual requirements. The contractual performance being assessed reflects a serious problem for which the contractor has not yet identified corrective actions or the contractor’s proposed actions appear only marginally effective or were not fully implemented.

U UNSATISFACTORY: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

N/A NOT APPLICABLE: Did not apply to this acquisition; or, questionnaire respondent has no knowledge of, and/or did not observe, the contractor’s performance in this area.

NOTICE TO QUESTIONNAIRE RESPONDENTS: Please do not transmit this page when faxing your input to the name/address listed on page 1.

File details come from the government source that posted it. Updated .