EDL_5686EJ.pdf

PDF 163 KB Posted

Attached to
BEAR Water Distribution System Federal contract opportunity
Solicitation number
FA8533-08-R-23231
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

EDL_5686EJ

View the file

Other files for this federal contract opportunity

Other files attached to BEAR Water Distribution System, newest first.
File Type Posted
FA853308R23231_0002.pdf PDF
Questions and Answers_BEAR Water.doc DOC document
FA853308R23231_0001.pdf PDF
BEARWaterMRSPKits.xls XLS spreadsheet
PD07WRGBGBLC48_Rev1_02June2009.doc DOC document
CDRL_ELINsA001-A008.pdf PDF
Attachment4_ClientAuthorizationLetter_08-R-23231.doc DOC document
PackingPlan_SourceRun.pdf PDF
StatementOfWork.pdf PDF
EDL_6244EJ.pdf PDF
EDL_6245EJ.pdf PDF
FA8533-08-R-23231.pdf PDF
Attachment6_MultipleQtyRanges_08-R-23231.doc DOC document
EDL_6563EJ.pdf PDF
PurchaseDescription.pdf PDF
CDRL_ELINsC001-C003.pdf PDF
EDL_3856EJ.pdf PDF
Attachment1_FACTSSheet_08-R-23231.doc DOC document
Attachment5_TrackingRecord_08-R-23231.doc DOC document
CDRL_ELIN A009-A00C.pdf PDF
PackingPlan_IOFlightlineExt.pdf PDF
EDL_3858EJ.pdf PDF
EDL_6564EJ.pdf PDF
PackingPlan_ROWPUWaterProd.pdf PDF
TechnicalManualContractRequirements.pdf PDF
PackingPlan_550Initial.pdf PDF
PackingPlan_550FollowOn.pdf PDF
Attachment2_Past-PresentPerformanceQuestionnaire_08-R-23231.doc DOC document
PackagingRequirements.pdf PDF
EDL_7415EJ.pdf PDF
CDRL_ELIN B001.pdf PDF
EDL_6242EJ.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EDL Generated By PRPS Using Oracle Reports

5REVISION: ENGINEERING DATA LIST *HISTORY*

Roberson, Ronnie K01 MAY 2009

4610015655686EJ

GUHA

WATER PURIFICATION

406 SCMS

PD07WRGBGBLC48-9

BARE BASE

WARNER ROBINS AIR LOGISTICS CENTER98752

DATE: DATA TECH: ORGANIZATION/OFFICE SYMBOL: END ITEM: PAGE

1 OF/

CAGE: MANUFACTURER NAME: REFERENCE NUMBER: NOUN: NSN:

CAGE ENG DRAWING NUM /

ACCOMP DOC NUM

REV NR

SHEETS

FURN

CODE

DIST

CODE

NOUN REMARKS LINE

/SUB

98752

97403

97403

97403

97403

97403

PD07WRGBGBLC48

13227E9787

13227E9787 PL

13228E3297 +ADD DOC

13228E3296

13200E5958

A

C

S

S

S

S

S

S

A

A

A

A

C

C

WATER SUPPLY SYS

FLAKING BOX

PARTS LIST

FLAKING BOX

TAILGATE

CLEVIS

L

L

L

L

L

L

Roberson, Ronnie K

Roberson, Ronnie K

NAME:

NAME:

DATE:

DATE:

01 MAY 2009

01 MAY 2009

TOP DRAWING

+ ECO 94C0001

Roberson, Ronnie K01 MAY 2009

4610015655686EJ

GUHA

WATER PURIFICATION

406 SCMS

PD07WRGBGBLC48-9

BARE BASE

WARNER ROBINS AIR LOGISTICS CENTER98752

DATE: DATA TECH: ORGANIZATION/OFFICE SYMBOL: END ITEM: PAGE

2 OF/

CAGE: MANUFACTURER NAME: REFERENCE NUMBER: NOUN: NSN:

97403

97403

97403

97403

97403

97403

13200E5959

13225E9152

13214E8326

13208E9055 + ADD DOC

13228E3303

13228E1228

D

K

D

S

S

S

S

S

S

A

A

C

A

C

C

PIN

BREAKAWAY

WELDING PROCEDURES

LANYARD

PIN

COLLAR

L

L

L

L

L

L

Roberson, Ronnie K

Roberson, Ronnie K

Roberson, Ronnie K

Roberson, Ronnie K

NAME:

NAME:

NAME:

NAME:

DATE:

DATE:

DATE:

DATE:

01 MAY 2009

01 MAY 2009

01 MAY 2009

01 MAY 2009

CLASS 2, TYPE III

+ ECO 94C0001

-7

-1

Roberson, Ronnie K01 MAY 2009

4610015655686EJ

GUHA

WATER PURIFICATION

406 SCMS

PD07WRGBGBLC48-9

BARE BASE

WARNER ROBINS AIR LOGISTICS CENTER98752

DATE: DATA TECH: ORGANIZATION/OFFICE SYMBOL: END ITEM: PAGE

3 OF/

CAGE: MANUFACTURER NAME: REFERENCE NUMBER: NOUN: NSN:

97403

98749

98752

98752

98752

13228E1229

8335844 +ADD DOC

8642414

8642307

200412485

C

A c

C

S

S

S

S

S

C

A

C

C

A

PIN

DISTRIBUTION CENTER

POWER PANEL

POWER PANEL

ENGINEERING NOTES

L

L

L

L

L

STANDARD ENGINEERING TEXT

NAME: Roberson, Ronnie K DATE: 01 MAY 2009 FOR GENERAL ENGINEERING DOCUMENT NOTES, SEE DOCUMENT NUMBER 200415485.SPARES CONFIGURATION; PER B/P

Roberson, Ronnie K

Roberson, Ronnie K

Roberson, Ronnie K

Roberson, Ronnie K

Roberson, Ronnie K

NAME:

NAME:

NAME:

NAME:

NAME:

DATE:

DATE:

DATE:

DATE:

DATE:

01 MAY 2009

01 MAY 2009

01 MAY 2009

01 MAY 2009

01 MAY 2009

-2

+ ECO 2008C0001 & 92A0106

60KW

25KW

SEE NOTES 1,3,12

Roberson, Ronnie K01 MAY 2009

4610015655686EJ

GUHA

WATER PURIFICATION

406 SCMS

PD07WRGBGBLC48-9

BARE BASE

WARNER ROBINS AIR LOGISTICS CENTER98752

DATE: DATA TECH: ORGANIZATION/OFFICE SYMBOL: END ITEM: PAGE

4 OF/

CAGE: MANUFACTURER NAME: REFERENCE NUMBER: NOUN: NSN:

FURNISHED METHOD CODE LEGEND:

C - CLASSIFIED DOCUMENT.

S - FURNISHED WITH SOLICITATION.

M - STABLE BASE DRAWING REQUIRED;

FURNISHED WITH CONTRACT AWARD.

X - DATA SUPPLIED (NOT IN JEDMICS).

R - FURNISHED BY PCO UPON REQUEST.

P - PARTIAL DOCUMENT FURNISHED.

V - VENDOR DRAWING;

(NOT PROVIDED).

G - GOV'T DOCUMENT.

O - OTHERS, CONTRACTOR

MUST ACQUIRE.

A - DATA NOT

AVAILABLE.

NOTICE TO ACCOMPANY THE DISSEMINATION OF

EXPORT- CONTROLLED TECHNICAL DATA

If you print or display an abstract df any unclassified report marked EXPORT CONTROL, the following notice applies.

1. Export of information conta~ned herein, which includes, in some circumstances, release io foreign nationals within the United States, without first obtaining approval or license &om the Department of State for items controlled by the International Traffic in I

Arms Regulations (ITAR), or the Department of Commerce for items conkolled by the I

Export Administration Regulat~ons (EAR), may constitute a violation of law.

2. Under 22 U.S.C. 2778 the penalty for unlawful export of rtems or information I controlled under the ITAR is up to 2 years imprisonment, or a fine of $100,000, or both.

Under 50 U.S.C., Appendix 2410, tl~e penalty for unlawful export of items or informa-tion controlled under the EAR is a fine of up to $1,000,000, or five times the value of the exports, wl~~cl~ever is greater; or for an individual, imprisonment of up to 10 years, ;

or a fine of up to $250,000, or both. I

3. In accordance with your certification that establishes you as a "qualified U.S.

contractor," unauthorized dissemination of this information is prohibited and may result I

:,:I in disqualification as a qualified U.S. contractor, and may be considered in determining your eligibility for future conbcts with the Department of Defense.

4. The U.S. Government assumes no liability for direct patent infringement, or con-tributory patent inliingernent or misuse of technical data. ..

5. The U.S. Government does not warrant the adequacy, accuracy, currency, or completeness of the technical data.

6. The U.S. Govern~nent assumes no liability for loss, damaEe;or injury resulting from manufacture or use for any purpose of any product, article, system, or material in-volving reliance upon any or all technical d a ~ furnished in response to the request for technical data.

7. If the technical data fumjslled by the Government will be used for commercial lnanufac tu~g or other profit potential, a hcense for such use may be necessary. Any payments made in support of the request for data do not include or involve any license rights.

8. A copy of this notice shall be provided with any partial or complete reproduction of these data that are provided to qualified U.S. contractors.

10 U.S.C. 140c @OD Directive 5230.25 (Encl5)

File details come from the government source that posted it. Updated .