FA852618R0033.pdf

PDF 373 KB Posted

Attached to
C-17 Hoist, Fishpole-A/C Line Replaceable Units, NSN: 1730-01-436-9399
Solicitation number
FA8526-18-R-0033
Issued by

About this file

Solicitation

View the file

Other files

File Type Posted
FA852618R0033_______0002.pdf PDF
FA852618R0033_______0001.pdf PDF
DD_1423_FATP_(A001).pdf PDF
DD_1423_Equipment_Tech_Manual_(A003).pdf PDF
EDL_Rev_2_.pdf PDF
Packaging_Requirements.pdf PDF
DD_1423_FATR_(A002).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STANDARD FORM 1447 (2/2012)

Prescribed by GSA FAR (48 CFR) 53.215-1(d)

4. SOLICITATION NUMBER

FA8526-18-R-0033

X

X

6.SOLICITATION ISSUE DATE

8 FEB 2019

8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: 100 % FOR

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOSB PROGRAM

HUBZONE SMALL

BUSINESS EDWOSB

SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS NAICS CODE: 336413

8(A) SIZE STANDARD: 1250

DATE SIGNED

28. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER

SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH

ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

URGENT

THIS IS A TOTAL SMALL BUSINESS SET-ASIDE.

Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.

EARLY DELIVERY IS ACCEPTABLE AND PREFERRED

SEE LINE ITEM SCHEDULE

22.

AMOUNT

16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253

FULL AND OPEN COMPETITION (c) ( ) (c) ( )

DATE SIGNED

27. SIGNATURE OF OFFEROR/CONTRACTOR

20.

UNIT

21.

UNIT PRICE

19.

QUANTITY

13. CONTRACTOR OFFEROR CODE FACILITY CODE

11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR DAYS UNLESS OFFEROR

INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLK 9 ABOVE, THE CONTRACTOR AGREES TO HOLD ITS

OFFERED PRICES FIRM FOR THE ITEMS SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO

THE TERMS AND CONDITIONS STATED HEREIN. *120

RATING

DO: A1

3. AWARD/EFFECTIVE DATE

FA8526

2. CONTRACT NO.

X

CHECK IF REMITTANCE IS DIFFERENT

AND PUT SUCH ADDRESS IN OFFER

17.

ITEM NO.

12. ADMINISTERED BY CODE

Total

SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14 EFT:T

SCD:B

NAME AND TITLE OF SIGNER (TYPE OR PRINT) NAME OF CONTRACTING OFFICER

24. AWARD AMOUNT (FOR GOVT USE ONLY)

23. ACCOUNTING AND APPROPRIATION DATA

SEE SCHEDULE

5. SOLICITATION TYPE

SEALED BIDS NEGOTIATED

(IFB) (RFP)

15. PROMPT PAY DISCOUNT

25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH OR OTHERWISE

IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT

THE TERMS AND CONDITIONS SPECIFIED HEREIN.

10. ITEMS TO BE PURCHASED (BRIEF DESCRIPTION)

SUPPLIES SERVICES Other Aircraft Part and Auxiliary Equipment Manufacturing

9.

Offers will be received at the issuing office until the date and time specified below. Late offers are subject to late proposal provisions incorporated herein. All offers are subject to provisions, representations, certifications, and specifications as are attached or incorporated by reference.

8‐MAR‐2019 11:59PM

18.

SCHEDULE OF SUPPLIES/SERVICES

14. PAYMENT WILL BE MADE BY CODE

(SEE ESP CLAUSE 252.232‐7003.)

X

7. ISSUED BY CODE

GLOBEMASTER (C‐17), AFLCMC/WLMK

235 BYRON ST STE 19A

BLDG 300 CML PHN 478 327 7137

ROBINS AFB GA 31098‐1670

BUYER: Victor J. Henderson Victor.Henderson@us.af.mil Phone: (478) 327‐ 5543 No Collect Calls

X

1. THIS CONTRACT IS A RATED ORDER UNDER DPAS

(15 CFR 350)SOLICITATION/CONTRACT

BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.

J

SF 1447 (rev 2/2012) BACK

NO RESPONSE FOR THE REASONS CHECKED

TYPE OR PRINT NAME AND TITLE OF SIGNER

SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)

WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF

ITEMS INVOLVED

WE DO

OTHER (Specify)

CANNOT COMPLY WITH SPECIFICATIONS

CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT

FOLD

FOLD

FOLD FOLD

SOLICITATION NO. FA852618R0033

DUE: 8 MAR 2019 11:59 PM

FROM: AFFIX

STAMP

HERE

TO:

ATTN: Victor J Henderson

GLOBEMASTER (C‐17), AFLCMC/WLMK

235 BYRON ST STE 19A

BLDG 300 CML PHN 478 327 7137

ROBINS AFB GA 31098‐1670

FA8526‐18‐R‐0033

PART I ‐ THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

ELECTRONIC RESPONSES ARE AUTHORIZED (MAR 2003)

(IAW FAR 13.003(f))

In accordance with FAR 13.003(f); 14.202‐8 or 15.203(c), electronic commerce method to receive proposals, modifications, and revisions is permitted and preferred. Buyer and Contracting Officer's email addresses for submissions are listed on the front page of this document.

NOTE TO OFFEROR:

IF YOU MEET ANY OF THE CONDITIONS FOR WAIVER OF THE FIRST ARTICLE LISTED IN

SECTION L ‐ INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS, SUBMIT AN OFFER FOR BID B (LINE ITEMS 0001AF, 0001AG, AND 1001‐3001) ONLY IN ACCORDANCE WITH THE INSTRUCTIONS IN

CLAUSE L‐409.

IF YOU DO NOT MEET ANY OF THE CONDITIONS FOR WAIVER OF THE FIRST ARTICLE, SUBMIT AN OFFER FOR BID

A (LINE ITEMS 0001AA ‐ 0001AE, AND 1001‐3001) ONLY.

Hoist, Fishpole ‐ A/C Line Replaceable Units

Item No.

NSN: 1730‐01‐436‐9399 BA

Hoist, Fishpole ‐ A/C Line Replaceable Units P/N: 17G113298‐1 Buy American Act/Balance of Payments Program

First Article

Bid A ‐ First Article Required Item No.

0001AA

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

CLIN ACRN ACRN Total

0001AA AA

FIRST ARTICLE

NSN: 1730‐01‐436‐9399BA P/N: 17G113298‐1

IUID Required: Yes Associated Document(s) Line Item(s)

FD20601830155 0002

First Article

Bid A ‐ First Article Required

Limitations of Liability: Other Than High Value Item

Preliminary Inspection:

Final Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001‐2008 2008

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A EB2090 ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

None Type / Ship To PACRN Mark For A EB2090 PAA R. Nation Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required Delivery

A EB2090 1 EA *256 Calendar Days

Proposed Delivery

A EB2090 1 EA

*FIRST ARTICLE NOTE: NOTIFY 10 CALENDAR DAYS PRIOR TO SHIPMENT

First Article Test Plan

Bid A ‐ First Article Required Item No.

0001AB

Firm Fixed Price Quantity U/I Amount 1 LO Not Separately Priced

CLIN ACRN ACRN Total

0001AB AA

TEST PLAN IN ACCORDANCE WITH ATTACHED DD FORM 1423

DI‐NDTI‐81307 A/T Data Item Number: A001 Associated Document(s) Line Item(s)

FD20601830155 0003

Limitations of Liability: Other Than High Value Item

First Article Test Plan

Bid A ‐ First Article Required

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Standard Inspection Type / Ship To PACRN Mark For + IAW1423 AFLCMC/WLE, C 17 PSE Engineering Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required Delivery

+ IAW1423 1 LO *21 Calendar Days

Proposed Delivery

+ IAW1423 1 LO

SEE ATTACHED DD1423‐1 (A001) FOR DETAILED INFORMATION ON SUBMISSION OF FIRST ARTICLE TEST PLAN

(FATP)

45 DAYS ALLOWED FOR GOVERNMENT APPROVAL/DISAPPROVAL OF FATP

THE FATP SHALL:

1) List/briefly describe the equipment proposed/planned for testing.

2) Describe the means by which calibrations traceable to the NIST will be assured.

3) Describe the means by which the contractor will accomplish/document the dimensional conformance, weighing and proof load tests required IAW the item TDP.

4) Provide sample format(s) proposed for use in FATR documentation of conformance (dimensional, material and process compliance, proof test results) to the TDP.

5) Provide evidence of a plan to photo document compliance to all permanent item marking requirements (stenciling, silk‐screening, ID & proof load plates, etc. as applicable).

*See CDRL A001

SUBMIT E‐COPY OF FIRST ARTICLE TEST PLAN VIA EMAIL TO THE FOLLOWING:

Julian.Stevenson@us.af.mil Vandy.Alderman.1@us.af.mil George.Fuchs.ctr@us.af.mil Amanda.Hardy.5@us.af.mil Victor.Henderson.2@us.af.mil

First Article Test Report

Bid A ‐ First Article Required Item No.

0001AC

Firm Fixed Price Quantity U/I Amount

First Article Test Report

Bid A ‐ First Article Required 1 LO Not Separately Priced

CLIN ACRN ACRN Total

0001AC AA

TEST REPORT IN ACCORDANCE WITH ATTACHED DD FORM 1423

DI‐NDTI‐80809/T Data Item Number: A002 Associated Document(s) Line Item(s)

FD20601830155 0004

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Standard Inspection Type / Ship To PACRN Mark For + IAW1423 AFLCMC/WLE, C 17 PSE Engineering Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required Delivery

+ IAW1423 1 LO *201 Calendar Days

Proposed Delivery

+ IAW1423 1 LO

SEE ATTACHED DD1423‐1 (A002) FOR DETAILED INFORMATION ON SUBMISSION OF FIRST ARTICLE TEST REPORT

(FATR).

FIRST ARTICLE TEST REPORT MUST BE CERTIFIED BY GOVERNMENT QAR AND C‐17 SPO SUPPORT EQUIPMENT

ENGINEERING (REF MIL‐HDBK‐831, PARAGRAPH 4.1.4.2).

CONTRACTOR MUST NOTIFIY ACO & AFLCMC/WLE (C‐17 ENGINEERING) OF TEST TIME AND LOCATION 20 DAYS

PRIOR TO START OF TESTING.

45 DAYS ALLOWED FOR GOVERNMENT APPROVAL/DISAPPROVAL.

The Test Report (FATR) shall report the inspection and test results IAW the approved FATP and the FATR CDRL. The contractor shall manufacture the detail parts, acquire the requisite hardware, assemble and test one complete First Article IAW the item TDP. The Government QAR, C‐17 COG Engineer, contracting official, program manager and/or Boeing technical representative shall have the opportunity to observe/witness FA testing in the facility used for production article testing.

*See CDRL A002

SUBMIT E‐COPY OF FIRST ARTICLE TEST REPORT VIA EMAIL TO THE FOLLOWING:

Julian.Stevenson@us.af.mil Vandy.Alderman.1@us.af.mil George.Fuchs.ctr@us.af.mil Amanda.Hardy.5@us.af.mil Victor.Henderson.2@us.af.mil

Equipment Technical Manual

Bid A ‐ First Article Required Item No.

0001AD

Firm Fixed Price Quantity U/I Amount 1 LO Not Separately Priced

CLIN ACRN ACRN Total

0001AD AA

EQUIPMENT TECHNICAL MANUAL IAW ATTACHED DD FORM 1423

DI‐TMSS‐81675A/T Data Item Number: A003

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required Delivery

+ IAW1423 1 LO *201 Calendar Days

Proposed Delivery

+ IAW1423 1 LO

SEE ATTACHED DD1423‐1 (A003) FOR DETAILED INFORMATION ON SUBMISSION OF EQUIPMENT TECHNICAL

MANUAL.

THE CONTRACTOR SHALL SUBMIT THE DRAFT TECHNICAL MANUAL(S) IN CONJUNCTION WITH THE FIRST ARTICLE

TEST REPORT (CDRL A002).

THE FINAL DRAFT OF THE TECHNICAL MANUAL(S) SHALL BE SUBMITTED 30 DAYS AFTER GOVERNMENT APPROVAL

SUBMIT E‐COPY OF FIRST ARTICLE TEST REPORT VIA EMAIL TO THE FOLLOWING:

Julian.Stevenson@us.af.mil Vandy.Alderman.1@us.af.mil George.Fuchs.ctr@us.af.mil Amanda.Hardy.5@us.af.mil Victor.Henderson.2@us.af.mil

Production Article

Bid A ‐ First Article Required Item No.

0001AE

Firm Fixed Price Quantity U/I Unit Price Amount

15 EA

Production Article

Bid A ‐ First Article Required CLIN ACRN ACRN Total

0001AE AA

NSN: 1730‐01‐436‐9399 BA

Hoist, Fishpole ‐ A/C Line Replaceable Units P/N: 17G113298‐1 Associated Document(s) Line Item(s)

FD20601830155 0001

Limitations of Liability: Other Than High Value Item

Preliminary Inspection:

Final Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: The highest revision of ISO 9001, AS9100, NATO AQAP 2070 and/or equivalent third party quality management standard certification is preferred. Contractor QA shall meethighest standard under which they qualify.

Buy American Act/Balance of Payments Program IUID Required: Yes

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A EB2090 ORIGIN

Type / Ship To PACRN Mark For A EB2090 PAA R. Nation Type / Ship To Quantity (U/I) *ARO GOV'T

APPROVAL OF FIRST

ARTICLE TEST REPORT

_ Req No / Pri

Required Delivery

A EB2090 15 EA *120 Calendar Days

Proposed Delivery

A EB2090 15 EA

Production Article

Bid B ‐ First Article NOT Required Item No.

0001AF

Firm Fixed Price Quantity U/I Unit Price Amount

16 EA

CLIN ACRN ACRN Total

0001AF AA

NSN: 1730‐01‐436‐9399 BA

Hoist, Fishpole ‐ A/C Line Replaceable Units P/N: 17G113298‐1 Associated Document(s) Line Item(s)

FD20601830155 0001

Limitations of Liability: Other Than High Value Item

Production Article

Bid B ‐ First Article NOT Required

Preliminary Inspection:

Final Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: The highest revision of ISO 9001, AS9100, NATO AQAP 2070 and/or equivalent third party quality management standard certification is preferred. Contractor QA shall meethighest standard under which they qualify.

Buy American Act/Balance of Payments Program IUID Required: Yes

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A EB2090 ORIGIN

Type / Ship To PACRN Mark For A EB2090 PAA R. Nation Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required Delivery

A EB2090 16 EA *120 Calendar Days

Proposed Delivery

A EB2090 16 EA

Equipment Technical Manual

Bid B ‐ First Article NOT Required Item No.

0001AG

Firm Fixed Price Quantity U/I Amount 1 LO Not Separately Priced

CLIN ACRN ACRN Total

0001AG AA

EQUIPMENT TECHNICAL MANUAL IAW ATTACHED DD FORM 1423

DI‐TMSS‐81675A/T Data Item Number: A003

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required Delivery

+ IAW1423 1 LO *201 Calendar Days

Proposed Delivery

Equipment Technical Manual

Bid B ‐ First Article NOT Required

+ IAW1423 1 LO

SEE ATTACHED DD1423‐1 (A003) FOR DETAILED INFORMATION ON SUBMISSION OF EQUIPMENT TECHNICAL

MANUAL.

THE CONTRACTOR SHALL SUBMIT THE DRAFT TECHNICAL MANUAL(S) IN CONJUNCTION WITH THE FIRST ARTICLE

TEST REPORT (CDRL A002).

THE FINAL DRAFT OF THE TECHNICAL MANUAL(S) SHALL BE SUBMITTED 30 DAYS AFTER GOVERNMENT APPROVAL

SUBMIT E‐COPY OF FIRST ARTICLE TEST REPORT VIA EMAIL TO THE FOLLOWING:

Julian.Stevenson@us.af.mil Vandy.Alderman.1@us.af.mil George.Fuchs.ctr@us.af.mil Amanda.Hardy.5@us.af.mil Victor.Henderson.2@us.af.mil

Option I may be exercised at any time, from time‐to‐time, within 365 days after Government approval of First Article Test Report. The total quantity ordered under this option shall not exceed the maximum quantity of 2 each.

Multiple option periods may be exercised simultaneously. An option is determined to have been exercised when transmitted electronically by fax or email.

OPTION I

Item No.

Firm Fixed Price From Quantity U/I To Quantity U/I Unit Price

1 EA 2 EA

CLIN ACRN ACRN Total

1001 NA

NSN: 1730‐01‐436‐9399 BA

Hoist, Fishpole ‐ A/C Line Replaceable Units P/N: 17G113298‐1 Associated Document(s) Line Item(s)

FD2060XX1XTBD 1TBD

Limitations of Liability: Other Than High Value Item

Preliminary Inspection:

Final Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: The highest revision of ISO 9001, AS9100, NATO AQAP 2070 and/or equivalent third party quality management standard certification is preferred. Contractor QA shall meethighest standard under which they qualify.

Buy American Act/Balance of Payments Program IUID Required: Yes

OPTION I

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBD ORIGIN

Type / Ship To PACRN Mark For

A TBD TBD

Type / Ship To Quantity (U/I) *ARO EXERCISE OF

OPTION

_ Req No / Pri

Required Delivery

A TBD 1 EA

*120 Calendar Days

Proposed Delivery

A TBD 1 EA

Option II may be exercised at any time, from time‐to‐time, within 730 days after Government approval of First Article Test Report. The total quantity ordered under this option shall not exceed the maximum quantity of 2 each.

Multiple option periods may be exercised simultaneously. An option is determined to have been exercised when transmitted electronically by fax or email.

OPTION II

Item No.

Firm Fixed Price From Quantity U/I To Quantity U/I Unit Price

1 EA 2 EA

CLIN ACRN ACRN Total

2001 NA

NSN: 1730‐01‐436‐9399 BA

Hoist, Fishpole ‐ A/C Line Replaceable Units P/N: 17G113298‐1 Associated Document(s) Line Item(s)

FD2060XX1XTBD 1TBD

Limitations of Liability: Other Than High Value Item

Preliminary Inspection:

Final Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: The highest revision of ISO 9001, AS9100, NATO AQAP 2070 and/or equivalent third party quality management standard certification is preferred. Contractor QA shall meethighest standard under which they qualify.

Buy American Act/Balance of Payments Program IUID Required: Yes

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBD ORIGIN

Type / Ship To PACRN Mark For

OPTION II

A TBD TBD

Type / Ship To Quantity (U/I) *ARO EXERCISE OF

OPTION

_ Req No / Pri

Required Delivery

A TBD 1 EA

*120 Calendar Days

Proposed Delivery

A TBD 1 EA

Option III may be exercised at any time, from time‐to‐time, within 1095 days after Government approval of First Article Test Report. The total quantity ordered under this option shall not exceed the maximum quantity of 2 each.

Multiple option periods may be exercised simultaneously. An option is determined to have been exercised when transmitted electronically by fax or email.

OPTION III

Item No.

Firm Fixed Price From Quantity U/I To Quantity U/I Unit Price

1 EA 2 EA

CLIN ACRN ACRN Total

3001 NA

NSN: 1730‐01‐436‐9399 BA

Hoist, Fishpole ‐ A/C Line Replaceable Units P/N: 17G113298‐1 Associated Document(s) Line Item(s)

FD2060XX1XTBD 1XTBD

Limitations of Liability: Other Than High Value Item

Preliminary Inspection:

Final Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: The highest revision of ISO 9001, AS9100, NATO AQAP 2070 and/or equivalent third party quality management standard certification is preferred. Contractor QA shall meethighest standard under which they qualify.

Buy American Act/Balance of Payments Program IUID Required: Yes

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBD ORIGIN

Type / Ship To PACRN Mark For

A TBD TBD

Type / Ship To Quantity (U/I) *ARO EXERCISE OF

OPTION

_ Req No / Pri

Required Delivery

OPTION III

A TBD 1 EA

*120 Calendar Days

Proposed Delivery

A TBD 1 EA

SHIP TO / PLACE OF PERFORMANCE

TYPE/CODE: + IAW1423

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

TYPE/CODE: A EB2090

ATLANTA REDISTRIBUTION CENTER BDC‐A

BLDG DR 20 CP 404 363 0257

5690 SOUTHFIELD CT STE 200

FOREST PARK GA 30297‐2524

USA

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

TYPE/CODE: A TBD

TO BE DETERMINED

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

PART I ‐ THE SCHEDULE

SECTION E

INSPECTION AND ACCEPTANCE

E‐37

FIRST ARTICLE TEST, CERTIFICATION AND DISPOSITION REQUIREMENTS (FEB 1998)

(IAW FAR 9.308‐2)

Test criteria are as follows:

Lot/Item Government Test/Inspection Requirements

Lot/Item Contractor Test/Inspection Requirements 0001 (See Below)

Contractor Testing Requirements

*Dimensional Conformance

*Material and Process Verification *Proof Load Test *Workmanship

Disposition of the First Article shall be as follows:

Lot/Item Approved 0001 Forwarded to: EB2090

Lot/Item Disapproved 0001 Returned to the contractor

E‐1D

52.246‐2 INSPECTION OF SUPPLIES‐‐FIXED‐PRICE (AUG 1996)

(IAW FAR 46.302)

E-15

52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)

(IAW FAR 46.311, DFARS 246.202-4(1))

(a) The Contractor shall comply with the higher‐level quality standard(s) listed below. [If more than one standard is listed, the offeror shall indicate its selection by checking the appropriate block.]*

Title Number Date Tailoring

*See Individual Line Item Schedule

E-22

52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)

(IAW FAR 46.316)

E-42

INSPECTION AND ACCEPTANCE (SEP 1999)

(IAW FAR 46.401(b), FAR 46.503)

Preliminary inspection and acceptance will be at:

[CONTRACTOR FILL‐IN]

Item No(s): See schedule for items that specify preliminary inspection.

Inspection Code and Address:

Government Contract Quality Assurance Inspection and Acceptance will be at (Final):

[CONTRACTOR FILL‐IN]

Item No(s): See schedule for items with the following code(s) listed below :

Inspection Code and Address:

Government Contract Quality Assurance Inspection and Acceptance will be at destination(s) specified herein (Final).

Item No(s): 0001AB, 0001AC, 0001AD, 0001AG

PART I ‐ THE SCHEDULE

SECTION F

DELIVERIES OR PERFORMANCE

F-1

52.211-8 TIME OF DELIVERY (JUN 1997)

(IAW FAR 11.404(a)(2)) DELIVERY FOR EACH ITEM IS ANNOTATED IN THE SCHEDULE (PART I SECTION B) UNDER EACH LINE ITEM.

F-24

52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)

(IAW FAR 11.703(b)) F-26

52.242-15 STOP-WORK ORDER (AUG 1989)

(IAW FAR 42.1305(b)(1)) F-29

52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)

(IAW FAR 42.1305(c)) F-30

52.247-29 F.O.B. ORIGIN (FEB 2006)

(IAW FAR 47.303-1(c)) F-78

52.247-65 F.O.B. ORIGIN, PREPAID FREIGHT--SMALL PACKAGE SHIPMENTS (JAN 1991)

(IAW FAR 47.303-17(f)) F-35

F.O.B. ORIGIN (OCT 1993)

(IAW FAR 47.305(b))

Any supply item applicable to this document shall be delivered F.O.B. at:

F.O.B. Address

[CONTRACTOR FILL‐IN]

PART I ‐ THE SCHEDULE

SECTION G

CONTRACT ADMINISTRATION DATA

G-210

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)

(IAW DFARS 232.7004(b), PGI 232.7004(b)(1), DFARS 212.301(f)(liii)) (f)WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

(Contracting Officer: Insert applicable document type(s).

Note: If a “Combo” document type is identified but not supportable by the Contractor’s business systems, an “Invoice” (stand‐alone) and “Receiving Report” (stand‐alone) document type may be used instead.)

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

(Contracting Officer: Insert inspection and acceptance locations or “Not applicable.”)

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC

Issue By DoDAAC

Admin DoDAAC

Inspect By DoDAAC

Ship To Code

Ship From Code

Mark For Code

Service Approver (DoDAAC)

Service Acceptor (DoDAAC)

Accept at Other DoDAAC

LPO DoDAAC

DCAA Auditor DoDAAC

Other DoDAAC(s)

(*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back‐up documentation, as defined in DFARS Appendix F, (e.g.

timesheets) in support of each payment request.

(5)WAWF email notifications. The Contractor shall enter the e‐mail address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

(Contracting Officer: Insert applicable email addresses or “Not applicable.”)

(g)WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

(Contracting Officer: Insert applicable information or “Not applicable.”)

(2) For technical WAWF help, contact the WAWF helpdesk at 866‐618‐5988.

G-1

ACCOUNTING AND APPROPRIATION DATA (AUG 1998)

Accounting and Appropriation Chargeable ACRN Funds Citation Amount Chargeable

AA 57 73010 . 11 7 LC WT 13C017 4G944B 80401 41130F 503000 F03000 $0.00

PSR: E70923 FSR: 039501 DSR: 285200 CIN: F4FDAM8122B104

NA ACRN WILL BE ESTABLISHED AT TIME OPTION IS EXERCISED $0.00

REFERENCE:

AA CIN: F4FDAM8122B104 DSR: 285200

ACRN TOTAL $ 0.00

TRANSPORTATION APPROPRIATIONCHARGEABLE

The Transportation Allotment Identification (TAI) relates directly to the above ACRN(s). For example the TAI “TAA” is for the same line item(s) as ACRN “AA”.

FMS TRANSPORTATION ALLOTMENT SHALL BEUSED ONLYWHEN SHIPMENT ONGOVERNMENT BILL OF

LADING IS AUTHORIZED

Insert 3 if movement via surface mode or 2 if movement via airlift in place of any “#” shown. Insert last digit of current fiscal year in place of any asterisk “*” shown when material is shipped.

TAI ATAC FMSALLOTMENT/NOTE

TAA FKVL

F.O.BORIGIN, FIRST DESTINATION TRANSPORTATION

First Destination Transportation (FDT) covers shipment of newly acquired items from the contractor to their first point of usage, storage, or embarkation for items going outside the Continental United States (OCONUS). Shipment of repaired items and all shipments beyond the first point of usage or storage are second destination transportation. FDT costs for items shipped F.O.B. destination are included in the item’s price.

FDT F.O.B. origin costs are not paid on the contract that procures the item, but information referenced in the contract is used in their payment. This information comes from the activity and should be on the purchase request.

The Accounting Classification Reference Number (ACRN) that funds the acquisition of the Contract Item Number (CLIN)/SubCLIN must be used to pay for its transportation on the CLINs/SubCLINs listed below. TheMiscellaneous Obligation Reimbursement Document (MORD) Number associated with the long line of accounting (LOA) shall be entered into Power Track to fund the transportation charges needed to transport the item.

CLIN/SubCLIN Long Line of Accounting (LOA) MORD ACRN

0001AA, 0001AE, and

0001AF CSN: PSE0IW FSR: 039501 PSR: 069010 DSR: 082418

TAC: FKVL

F4FDAM8018NP02

(Applicable when the first destination transportation for the deliverable item(s) will be transported F.O.B.

PART II ‐ CONTRACT CLAUSES

SECTION I

CONTRACT CLAUSES

IB-300

5352.201-9101 OMBUDSMAN (JUN 2016)

(IAW AFFARS 5301.9103)

(c) If resolution cannot be made by the contracting officer, the interested party may contact the ombudsman, Timothy R.

Inman at 478 222 ‐4097 , FAX 000 000 ‐0000 , email timothy.inman@us.af.mil . Concerns, issues, disagreements, and recommendations that cannot be resolved at the Center/MAJCOM/DRU/SMC ombudsman level, may be brought by the interested party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330‐1060, phone number (571) 256‐2395, facsimile number (571) 256‐2431.

I-11

52.202-1 DEFINITIONS (NOV 2013)

(IAW FAR 2.201)

I-19

52.203-3 GRATUITIES (APR 1984)

(IAW FAR 3.202)

I-20

52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

(IAW FAR 3.404)

I-21

52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)

(IAW FAR 3.503-2)

I-22

52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014)

(IAW FAR 3.502-3)

I-23

52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR

IMPROPER ACTIVITY (MAY 2014)

(IAW FAR 3.104-9(a))

I-25

52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

(IAW FAR 3.104-9(b)) I-25C

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS

(OCT 2010)

(IAW FAR 3.808(b))

I-25T

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY

AGREEMENTS OR STATEMENTS (JAN 2017)

(IAW FAR 3.909-3 (b))

IA-21D

252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS

(SEP 2011)

(IAW DFARS 203.171-4(a), DFARS 212.301(f)(ii))

IA-22

252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER

DEFENSE-CONTRACT-RELATED FELONIES (DEC 2008)

(IAW DFARS 203.570-3)

IA-24D

252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS

(SEP 2013)

(IAW DFARS 203.970)

I-39

52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON RECYCLED PAPER (MAY 2011)

(IAW FAR 4.303)

I-43

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT

AWARDS (OCT 2018)

(IAW FAR 4.1403(a))

I-46

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)

(IAW FAR 4.1105(b)) I-48E

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (JUL 2016)

(IAW FAR 4.1804(c), FAR 12.301(d)) I-48F

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS

(DEC 2014)

(IAW FAR 4.1202(b))

I-48G

52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS

(JUN 2016)

(IAW FAR 4.1903)

I-49

52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES

DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED

ENTITIES (JUL 2018)

(IAW FAR 4.2004)

IA-33

252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)

(IAW DFARS 204.404-70(b))

IA-39

252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT

REPORTING (OCT 2016)

(IAW DFARS 204.7304(c))

IA-39H

252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION

SUPPORT (MAY 2016)

(IAW DFARS 204.7403(c), DFARS 212.301(f)(ix))

I-72

52.209-3 FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)

(IAW FAR 9.308-1(a)(1), FAR 9.308-1(b)(1))

(a) The Contractor shall test ** unit(s) of Lot/Item * as specified in this contract. At least *** calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.

*Lot/Item ***Calendar Days Before Test **Quantity

0001 20 1

(b) The Contractor shall submit the first article test report within ___**___ calendar days from the date of this contract to

___***___ marked "FIRST ARTICLE TEST REPORT: Contract No. Lot/Item No. ___*___” Within ___****___ calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.

*Lot/Item ****Approval Days ELIN No.

0001 45 A002

FA Test Report Item ***Type/Location **Calendar Days

0001AC +IAW1423 201

See Line Item Schedule

(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.

(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for

(1) progress payments, or

(2) termination settlements if the contract is terminated for the convenience of the Government.

(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.

(The above Clause/Provision has been modified.)

I-73

52.209-3 FIRST ARTICLE APPROVAL--CONTRACTOR TESTING -- ALTERNATE I (JAN 1997)

(IAW FAR 9.308-1(a)(2), FAR 9.308-1(b)(2)) As prescribed in 9.308‐1(a)(2) and (b)(2), add the following paragraph (i) to the basic clause:

(i) The Contractor shall produce both the first article and the production quantity at the same facility.

(The above Clause/Provision has been modified.)

I-78

52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT

(OCT 2015)

(IAW FAR 9.409)

I-080G

52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS

(NOV 2015)

(IAW FAR 9.108-5(b))

IA-92

252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE

GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM

(OCT 2015)

(IAW DFARS 209.409)

I-83

52.211-5 MATERIAL REQUIREMENTS (AUG 2000)

(IAW FAR 11.304)

I-102

52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008)

(IAW FAR 11.604(b)) This is a rated order certified for national defense , emergency preparedness, and energy program use, and the Contractor shall follow all the requirements of the Defense Priorities and Allocations System regulation (15 CFR 700).

IA-103

252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)

(IAW DFARS 211.274-6(a)(1), DFARS 212.301(f)(xii))

(a) Definitions. As used in this clause—

“DoD recognized unique identification equivalent” means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at http://www.acq.osd.mil/dpap/pdi/uid/iuid/equivalents.html .

“Unique item identifier type” means a designator to indicate which method of uniquely identifying a part has been used. The current list of accepted unique item identifier types is maintained at http://www.acq.osd.mil/dpap/pdi/uid/uii_types.html .

(c) Unique item identifier.

(1) The Contractor shall provide a unique item identifier for the following:

(i) Delivered items for which the Government’s unit acquisition cost is $5,000 or more, except for the following line items:

Contract Line, Subline, or

Exhibit Line Item Number

Item Description

See Schedule as Applicable

(ii) Items for which the Government’s unit acquisition cost is less than $5,000 that are identified in the Schedule or the following table:

Contract Line, Subline, or

Exhibit Line Item Number

Item Description

*Items less than $5000, which require UID, will be specifically identified in the schedule.

See Schedule as Applicable

(iii) Subassemblies, components, and parts embedded within delivered items, items with warranty requirements, DoD serially managed reparables and DoD serially managed nonreparables as specified in Attachment Number _____( or See Schedule as Applicable).

(iv) Any item of special tooling or special test equipment as defined in FAR 2.101 that have been designated for preservation and storage for a Major Defense Acquisition Program as specified in Attachment Number _____( or See Schedule as Applicable).

(v) Any item not included in paragraphs (c)(1)(i), (ii), (iii), or (iv) of this clause for which the contractor creates and marks a unique item identifier for traceability.

(f) The Contractor shall submit the information required by paragraphs (d) and (e) of this clause as follows:

(1) End items shall be reported using the receiving report capability in Wide Area WorkFlow (WAWF) in accordance with the clause at 252.232‐7003. If WAWF is not required by this contract, and the contractor is not using WAWF, follow the procedures at http://dodprocurementtoolbox.com/site/uidregistry/ .

(2) Embedded items shall be reported by one of the following methods—

(i) Use of the embedded items capability in WAWF;

(ii) Direct data submission to the IUID Registry following the procedures and formats at http://dodprocurementtoolbox.com/site/uidregistry/; or

(iii) Via WAWF as a deliverable attachment for exhibit line item number ______, Unique Item Identifier Report for Embedded Items, Contract Data Requirements List, DD Form 1423.

IA-118M

252.211-7008 USE OF GOVERNMENT-ASSIGNED SERIAL NUMBERS (SEP 2010)

(IAW DFARS 211.274-6(c), DFARS 212.301(f)(xv)) I-128

52.215-2 AUDIT AND RECORDS--NEGOTIATION (OCT 2010)

(IAW FAR 15.209(b)(1)) I-129G

52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)

(IAW FAR 15.209(h), AFFARS 53.15.209(h)) I-137C

52.215-14 INTEGRITY OF UNIT PRICES (OCT 2010)

(IAW FAR 15.408(f)(1)) I-193

52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM

(MAR 1989)

(IAW FAR 17.208(e))

The Contracting Officer may exercise the option by written notice to the Contractor within See Item Schedule .

I-212D

52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEVIATION 2019-O0003)

(DEC 2018)

(IAW FAR 19.508(c))

I-214

52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2018)

(IAW FAR 19.708(a)) I-221D

52.219-14 LIMITATIONS ON SUBCONTRACTING (DEVIATION 2019-O0003) (DEC 2018)

(IAW FAR 19.508(e), FAR 19.811-3(e)) I-225N

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013)

(IAW FAR 19.309(c))

(g) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

The Contractor represents that it [ ] is, [ ] is not a small business concern under NAICS Code _____________ assigned to contract number ______________________________.

[Contractor to sign and date and insert authorized signer's name and title].

I-262L

52.222-19 CHILD LABOR--COOPERATION WITH AUTHORITIES AND REMEDIES (JAN 2018)

(IAW FAR 22.1505(b))

I-263

52.222-20 CONTRACTS FOR MATERIALS, ARTICLES, AND EQUIPMENT EXCEEDING $15,000

(MAY 2014)

(IAW FAR 22.610)

I-263E

52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)

(IAW FAR 22.810(a)(1)) I-264

52.222-26 EQUAL OPPORTUNITY (SEP 2016)

(IAW FAR 22.810(e)) I-274

52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2015)

(IAW FAR 22.1310(a)(1), DFARS 222.1310(a)(1)) I-276

52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUL 2014)

(IAW FAR 22.1408(a)) I-278

52.222-37 EMPLOYMENT REPORTS ON VETERANS (FEB 2016)

(IAW FAR 22.1310(b)) I-280

52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR

RELATIONS ACT (DEC 2010)

(IAW FAR 22.1605)

I-289C

52.222-50 COMBATING TRAFFICKING IN PERSONS (JAN 2019)

(IAW FAR 22.1705(a)(1)) I-295

52.223-6 DRUG-FREE WORKPLACE (MAY 2001)

(IAW FAR 23.505)

I-297K

52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE

DRIVING (AUG 2011)

(IAW FAR 23.1105)

IA-284

252.223-7008 PROHIBITION OF HEXAVALENT CHROMIUM (JUN 2013)

(IAW DFARS 223.7306, DFARS 212.301(f)(xxi)) I-301

52.224-3 PRIVACY TRAINING (JAN 2017)

(IAW FAR 24.302(a)) I-312

52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)

(IAW FAR 25.1103(a))

IA-287

252.225-7001 BUY AMERICAN AND BALANCE OF PAYMENTS PROGRAM--BASIC (DEC 2017)

(IAW DFARS 225.1101(2)(i) and (2)(ii))

IA-288

252.225-7002 QUALIFYING COUNTRY SOURCES AS SUBCONTRACTORS (DEC 2017)

(IAW DFARS 225.1101(3))

IA-293

252.225-7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (DEC 2017)

(IAW DFARS 225.7002-3(a))

IA-294M

252.225-7013 DUTY-FREE ENTRY (MAY 2016)

(IAW DFARS 225.1101(4))

IA-312TN

252.225-7048 EXPORT-CONTROLLED ITEMS (JUN 2013)

(IAW DFARS 225.7901-4)

I-315

52.227-1 AUTHORIZATION AND CONSENT (DEC 2007)

(IAW FAR 27.201-2(a)(1))

I-317

52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT

INFRINGEMENT (DEC 2007)

(IAW FAR 27.201-2(b))

I-352

52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)

(IAW FAR 29.401-3(a)) I-383

52.232-1 PAYMENTS (APR 1984)

(IAW FAR 32.111(a)(1)) I-391

52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)

(IAW FAR 32.111(b)(1)) I-394

52.232-11 EXTRAS (APR 1984)

(IAW FAR 32.111(c)(2)) I-403

52.232-17 INTEREST (MAY 2014)

(IAW FAR 32.611(a), FAR 32.611(b)) I-409

52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)

(IAW FAR 32.806(a)(1)) I-412

52.232-25 PROMPT PAYMENT (JAN 2017)

(IAW FAR 32.908(c))

(a) Invoice payments—

(5) Computing penalty amount. The Government will compute the interest penalty in accordance with the Office of Management and Budget prompt payment regulations at 5 CFR part 1315.

(i) For the sole purpose of computing an interest penalty that might be due the Contractor, Government acceptance is deemed to occur constructively on the 7th day (unless otherwise specified in this contract) after the Contractor delivers the supplies or performs the services in accordance with the terms and conditions of the contract, unless there is a disagreement over quantity, quality, or Contractor compliance with a contract provision. If actual acceptance occurs within the constructive acceptance period, the Government will base the determination of an interest penalty on the actual date of acceptance. The constructive acceptance requirement does not, however, compel Government officials to accept supplies or services, perform contract administration functions, or make payment prior to fulfilling their responsibilities.

I-416F

52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--SYSTEM FOR AWARD

MANAGEMENT (OCT 2018)

(IAW FAR 32.1110(a)(1))

I-416N

52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)

(IAW FAR 32.706-3)

I-416P

52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS

SUBCONTRACTORS (DEC 2013)

(IAW FAR 32.009-2)

IA-414D

252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS

(DEC 2018)

(IAW DFARS 232.7004(a))

(a) Definitions. As used in this clause—

(1) “Contract financing payment” and “invoice payment” have the meanings given in section 32.001 of the Federal Acquisition Regulation.

(2) “Electronic form” means any automated system that transmits information electronically from the initiating system to all affected systems. Facsimile, e‐mail, and scanned documents are not acceptable electronic forms for submission of payment requests. However, scanned documents are acceptable when they are part of a submission of a payment request made using Wide Area WorkFlow (WAWF) or another electronic form authorized by the Contracting Officer.

(3) “Payment request” means any request for contract financing payment or invoice payment submitted by the Contractor under this contract.

(b) Except as provided in paragraph (c) of this clause, the Contractor shall submit payment requests and receiving reports using WAWF, in one of the following electronic formats that WAWF accepts: Electronic Data Interchange, Secure File Transfer Protocol, or World Wide Web input. Information regarding WAWF is available on the Internet at https://wawf.eb.mil/ .

(c) The Contractor may submit a payment request and receiving report using other than WAWF only when—

(1) The Contracting Officer authorizes use of another electronic form. With such an authorization, the Contractor and the Contracting Officer shall agree to a plan, which shall include a timeline, specifying when the Contractor will transfer to WAWF;

(2) DoD is unable to receive a payment request or provide acceptance in electronic form;

(3) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor. In such cases, the Contractor shall include a copy of the Contracting Officer’s determination with each request for payment; or

(4) DoD makes a payment for commercial transportation services provided under a Government rate tender or a contract for transportation services using a DoD‐approved electronic third party payment system or other exempted vendor payment/invoicing system (e.g., PowerTrack, Transportation Financial Management System, and Cargo and Billing System).

(d) The Contractor shall submit any non‐electronic payment requests using the method or methods specified in Section G of the contract.

(e) In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.

IA-427

252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006)

(IAW DFARS 232.7102)

I-417

52.233-1 DISPUTES (MAY 2014)

(IAW FAR 33.215)

I-419

52.233-3 PROTEST AFTER AWARD (AUG 1996)

(IAW FAR 33.106(b)) I-421

52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)

(IAW FAR 33.215(b)) I-541

52.242-13 BANKRUPTCY (JUL 1995)

(IAW FAR 42.903)

I-546

52.243-1 CHANGES--FIXED-PRICE (AUG 1987)

(IAW FAR 43.205(a)(1))

IA-648

252.243-7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991)

(IAW DFARS 243.205-70)

IA-649

252.243-7002 REQUESTS FOR EQUITABLE ADJUSTMENT (DEC 2012)

(IAW DFARS 243.205-71)

I-574

52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (JAN 2019)

(IAW FAR 44.403)

IA-655

252.244-7000 SUBCONTRACTS FOR COMMERCIAL ITEMS (JUN 2013)

(IAW DFARS 244.403)

I-627

52.246-23 LIMITATION OF LIABILITY (FEB 1997)

(IAW FAR 46.805(a)(1))

I-636

52.247-1 COMMERCIAL BILL OF LADING NOTATIONS (FEB 2006)

(IAW FAR 47.104-4(a), FAR 47.104-4(b))

IA-745

252.247-7023 TRANSPORTATION OF SUPPLIES BY SEA--BASIC (APR 2014)

(IAW DFARS 247.574(b)) I-671

52.248-1 VALUE ENGINEERING (OCT 2010)

(IAW FAR 48.201(b), FAR 48.201(f)) I-684

52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE)

(APR 2012)

(IAW FAR 49.502(b)(1)(i))

I-699

52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) (APR 1984)

(IAW FAR 49.504(a)(1)) I-731

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

(IAW FAR 52.107(b)) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text.

Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

Regulations URLs: (Click on the appropriate regulation.)

http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/far1toc.htm http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/dfars/dfarTOC.htm http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/af_afmc/affars/affar1toc.htm

NOTE: After selecting the appropriate regulation above, at the "Table of Contents" page, conduct a search for the desired regulation reference using your browser's FIND function. When located, click on the regulation reference (hyperlink).

I-733

52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)

(IAW FAR 52.107(f))

(a) The use in this contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.

(b) The use in this contract of any Defense Federal Acquisition Regulation Supplement (48 CFR Chapter 2).clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

I-750

52.253-1 COMPUTER GENERATED FORMS (JAN 1991)

(IAW FAR 53.111)

PART III ‐ LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J

LIST OF ATTACHMENTS

Form Number Description/File Name Date Number of Pages Engineering Data List EDL Rev 2

05FEB2018 2

DD FORM 1423‐1 CDRL A001

First Article Test Plan and Procedures

27FEB2018 3

DD FORM 1423‐1 CDRL A002

First Article Test Report

27FEB2018 3

DD FORM 1423‐1 CDRL A003

Equipment Technical Manual (Sanitized)

27FEB2018 2

AFMC FORM 158 Packaging Requirements 23APR2018 2

PART IV ‐ REPRESENTATIONS AND INSTRUCTIONS

SECTION K

REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS

OF OFFERORS OR RESPONDENTS

K-208C

252.203-7005 REPRESENTATION RELATING TO COMPENSATION OF FORMER DOD OFFICIALS

(NOV 2011)

(IAW DFARS 203.171-4(b), DFARS 212.301(f)(iv))

K-10E

52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2018)

(IAW FAR 4.1202(a)) (a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 336413 .

(2) The small business size standard is 1250 .

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)(1) If the provision at 52.204‐7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

((2) If the provision at 52.204–7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:

[ ] (i) Paragraph (d) applies.

[ ] (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203‐2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm‐fixed‐price contract or fixed‐price contract with economic price adjustment is contemplated, unless—

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.