DD_1423_Equipment_Tech_Manual_(A003).pdf
PDF 157 KB Posted
- Solicitation number
- FA8526-18-R-0033
About this file
Equipment Technical Manual (A003)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA852618R0033_______0002.pdf | ||
| FA852618R0033_______0001.pdf | ||
| DD_1423_FATP_(A001).pdf | ||
| FA852618R0033.pdf | ||
| EDL_Rev_2_.pdf | ||
| Packaging_Requirements.pdf | ||
| DD_1423_FATR_(A002).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
16. REMARKS
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE Draft
b. COPIES
Final
Reg Repro
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 8.0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
A
C17/PSE/17G113298-1 FD2060-18-30155
A003 Equipment Technical Manual (Sanitized) Hoisting Unit, Aircraft Components Manual/Powered
DI-TMSS-81675A/T AFLCMC/WLE (C-17 Engr)
DD
A D
1 TIME See Blk 16
See Blk 16
Blk 4:
Replace the last sentence in paragraph 1. with, "If needed, additional information can be obtained through the PCO."
Blk 7:
The Government will accept the Receiving Report through WAWF upon final delivery.
Blk 11/12:
The contractor shall submit the draft Technical Manual(s) in conjunction with the First Article Test Report (CDRL A002).
Blk 14;
The draft Technical Manual(s) shall be submitted in searchable Adobe PDF format and submitted by Email. If the combination of the Technical Manual files is greater that 5MB in size, the Government will accept delivery through AMRDEC SAFE (https://safe.amrdec.army.mil). The Government shall have 45 days to review and approve the draft Technical Manual(s). The Final draft of the Technical Manual(s) shall be submitted 30 after government approval (~ 276
DAC)
Julian Stevenson
AFLCMC/WLE; DSN 468-4168
N/A
27-Feb-18
AFLCMC/WLE (C17 Eng)
235 Byron Street, Suite 19A
Robins AFB, GA 31098
E-copy
Searchable Adobe PDF
Email to:
Julian.Stevenson@us.af.mil 1 1
Vandy.Alderman.1@us.af.mil 1 1
Digital Data 1
2 2 1
ROACH.MARCIA.
C.1229969770
Digitally signed by
ROACH.MARCIA.C.1229969770
Date: 2018.03.29 10:37:12 -04'00'
1 2
Reset
CONTRACT DATAREQUIREMENTSLIST
(1 Data Item)
A. CONTRACT LINE ITEM NO. B.EXHIBIT C.CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
A
C17/PSE/17G113298-1 FD2060-18-30155
2 2
File details come from the government source that posted it.