About this file

This is a solicitation for Contractor Logistics Support (CLS) for the MC-130 Air Refueling System (MCARS) installed on Air Force Special Operations Command MC-130H aircraft. The Robins Air Force Base Contracting Section requires CLS including depot-level repair and full depot sustainment support for MCARS components, operation of the Contractor-Inventory Control Point, and storage and maintenance of removed MCARS components. The contract will be a sole source award to Flight Refueling LTD DBA Cobham Mission Systems Wimbourne Limited for a one year base period and a one year option period, with a period of performance from December 2020 through December 2022. The contract type includes Firm Fixed Price, Cost Plus Fixed Fee, and Cost Reimbursable No Fee. This is not a small business set-aside and authority to acquire on a sole source basis is requested under 10 U.S.C. 2304(c)(1).

View the file

Other files for this federal contract opportunity

Other files attached to Contractor Logistics Support (CLS) for MC-130 Aerial Refueling System (MCARS), newest first.
File Type Posted
FA850920R0020_______0004.pdf PDF
MCARS_PWS_Final_20201019.pdf PDF
FA850920R0020_______0002.pdf PDF
FA850920R0020_______0003.pdf PDF
MCARS PWS_FinalUpdated.pdf PDF
FA850920R0020_______0001.pdf PDF
Transportation_DDFORM1653.pdf PDF
CDRLS.pdf PDF
MCARSPWS_Final.pdf PDF
Packaging_AFMCFORM158.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1447 (REV. 8/2016)

PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.214(d)

23. ACCOUNTING AND APPROPRIATION DATA

SEE SCHEDULE

24. TOTAL AWARD AMOUNT (For Government Use Only)

TELEPHONE NUMBER

UNIQUE ENTITY

IDENTIFIER

CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

NO COLLECT CALLS

4. SOLICITATION NUMBER

FA8509-20-R-0020

6.SOLICITATION ISSUE DATE

8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOSB PROGRAM

HUBZONE SMALL

BUSINESS EDWOSB

SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS NAICS: 336413

8(A) SIZE STANDARD: 1,250

DATE SIGNED

28. UNITED STATES OF AMERICA (Signature of Contracting Officer)

26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER

SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH

ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

ROUTINE

Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.

SEE LINE ITEM SCHEDULE

22.

AMOUNT

16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253

FULL AND OPEN COMPETITION (c) (1 ) (c) ( )

DATE SIGNED

27. SIGNATURE OF OFFEROR/CONTRACTOR

20.

UNIT

21.

UNIT PRICE

19.

QUANTITY

13. CONTRACTOR OFFEROR CODE FACILITY CODE

11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR

DAYS UNLESS OFFEROR INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLOCK 9

ABOVE, THE CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS

SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS AND

CONDITIONS STATED HEREIN. *120

RATING

DO: A1

3. AWARD/EFFECTIVE DATE

FA8509

2. CONTRACT NUMBER

X

17.

ITEM NUMBER

12. ADMINISTERED BY CODE

Total

SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14 EFT:T

SCD:B

NAME AND TITLE OF SIGNER (Type or Print) NAME OF CONTRACTING OFFICER

5. SOLICITATION TYPE

SEALED BIDS NEGOTIATED

(IFB) (RFP)

15. PROMPT PAYMENT DISCOUNT

25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH

OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT

THE TERMS AND CONDITIONS SPECIFIED HEREIN.

10. ITEMS TO BE PURCHASED (Brief Description)

SUPPLIES SERVICES Other Aircraft Part and Auxiliary Equipment Manufacturing7

9. (Agency Use)

Offers will be received at the issuing office until the date and time specified below. Late offers are subject to late proposal provisions incorporated herein. All offers are subject to provisions, representations, certifications, and specifications as are attached or incorporated by reference.

16-SEP-2020 4:30PM

X

18.

SCHEDULE OF SUPPLIES/SERVICES

14. PAYMENT WILL BE MADE BY CODE

(SEE ESP CLAUSE 252.232-7003.)

X

7. ISSUED BY CODE

SOF/PR - FIXED WING & ENG SUPPORT, AFLCMC/WIUKA

235 BYRON ST STE 19A

BLDG 300 CML PHN 478 926 2208

ROBINS AFB GA 31098-1670

BUYER: Erica C. Barnes/WIUKA erica.barnes.1@us.af.mil Phone: (478) 926- 4942

X

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)SOLICITATION/CONTRACT

BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.

JSU

STANDARD FORM 1447 (REV. 8/2016) BACK

NO RESPONSE FOR REASONS CHECKED

TYPE OR PRINT NAME AND TITLE OF SIGNER

SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)

WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF

ITEMS INVOLVED

WE DO

OTHER (Specify)

UNABLE TO IDENTIFY THE ITEM(S)

CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT

DO NOT REGULARILY MANUFACTURE OR SELL THE TYPE

OF ITEMS INVOLVED

DATE AND LOCAL TIME 16 SEP 2020 4:30 PM

SOLICITATION NUMBER FA850920R0020

FROM: AFFIX

STAMP

HERE

TO:

ATTN: Erica C Barnes/WIUKA

SOF/PR - FIXED WING & ENG SUPPORT, AFLCMC/WIUKA

235 BYRON ST STE 19A

BLDG 300 CML PHN 478 926 2208

ROBINS AFB GA 31098-1670

FA8509-20-R-0020

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

Note: All U.S. export/import requirements are the responsibility of the Prime Contractor; the U.S.

sub-contractor must also comply with export/import requirements.

Depot Level Support/Integration Mgmt Tasks

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO XXX XXX

Depot Level Support/Integration Mgmt Tasks IAW PWS dated 02 June 2020 Paragraphs 4.1.1, 4.1.2, 4.1.5, 4.1.6, 4.1.7, 4.1.8, 4.1.9, 4.1.10, 4.1.11, 4.1.12, 4.1.13, 4.1.14, 4.4.1, 4.4.2, 4.4.3, 4.4.4, 4.4.5, 4.4.6, 4.5, 4.5.1, 4.7, 4.10.1, 4.11, 4.12, 4.12.1, 4.13, 4.14, 4.15, 4.15.1, 4.15.2, 4.15.3, 4.17, 5.1, 5.2, 5.2.1, 5.2.2, 5.2.3, 5.2.4, 5.2.5, 5.2.6, 5.2.7, 5.2.8, 5.3, 5.4, 5.5, 5.5.1, 5.5.2, 5.5.3, 5.5.3.1, 5.5.3.2, 5.5.3.3, 5.6, 5.6.1, 5.6.2, 5.6.3, 5.7, 5.7.1, 5.8, 5.8.1, 5.9, 5.9.1, 5.9.2, 5.9.3 Associated Document(s) Line Item(s)

FD20602031098 0001

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Cost Voucher Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Place of Perf Quantity (U/I) Beginning

Specified Date Ending Specified Date

Req No / Pri

Required Period of Performance

1 LO 31 DEC 2020 30 DEC 2021

Proposed Period of Performance

1 LO

Consumables

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO XXX XXX

Consumables IAW PWS dated 02 June 2020 Paragraphs 3.0, 4.1.8, 4.4.4 Associated Document(s) Line Item(s)

FD20602031098 0002

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Cost Voucher Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Place of Perf Quantity (U/I) Beginning

Specified Date Ending Specified Date

Req No / Pri

Required Period of Performance

1 LO 31 DEC 2020 30 DEC 2021

Proposed Period of Performance

1 LO

Contractor Inventory Control Point (C-ICP)

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

Contractor Inventory Control Point (C-ICP) IAW PWS dated 02 June 2020 Paragraphs 3.6.1, 3.6.4, 4.1.3, 4.1.4, 4.4, 4.6, 4.16.1, 4.16.2, 4.16.3 Associated Document(s) Line Item(s)

FD20602031098 0003

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Cost Voucher Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Contractor Inventory Control Point (C-ICP)

Place of Perf Quantity (U/I) Beginning

Specified Date Ending Specified Date

Req No / Pri

Required Period of Performance

1 LO 31 DEC 2020 30 DEC 2021 Non-MilStrip

Proposed Period of Performance

1 LO

Performance of C-ICP will be at Boeing, Fort Walton Beach, Fl 32548 (CAGE 022T1)

Travel

Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Travel as approved in advance by the contracting officer.

Travel and per diem in support of CLIN 0001.

IAW PWS dated 02 June 2020 Paragraphs 4.19.

Associated Document(s) Line Item(s)

FD20602031098 0004

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Cost Voucher Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Place of Perf Quantity (U/I) Beginning

Specified Date Ending Specified Date

Req No / Pri

Required Period of Performance

1 LO 31 DEC 2020 30 DEC 2021

Proposed Period of

Over and Above

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated

Over and Above IAW PWS dated 02 June 2020 Paragraph 4.11.

Associated Document(s) Line Item(s)

FD20602031098 0005

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Cost Voucher Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Place of Perf Quantity (U/I) Beginning

Specified Date Ending Specified Date

Req No / Pri

Required Period of Performance

1 LO 31 DEC 2020 30 DEC 2021

Proposed Period of Performance

1 LO

Transportation

Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Transportation Cost IAW PWS dated 02 June 2020 Paragraphs 4.4.7, 4.4.8.

Associated Document(s) Line Item(s)

FD20602031098 0006

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Cost Voucher Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Transportation

Place of Perf Quantity (U/I) Beginning

Specified Date Ending Specified Date

Req No / Pri

Required Period of Performance

1 LO 31 DEC 2020 30 DEC 2021

Proposed Period of Performance

1 LO

Data

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

LO xxx

DATA

DATA in accordance with DD FORM 1423-1 attached hereto.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Cost Voucher Exhibit: A Quality Assurance: IAW DD FORM 1423-1 Type / Ship To Quantity (U/I) *ARO IAW DD

FORM 1423-1

attached hereto

_ Req No / Pri

Required Delivery

+ IAW1423 1 LO Non-MilStrip

Proposed Delivery

+ IAW1423 1 LO

ELIN A001

Item No.

0007AA

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

ELIN A001

Engineering Change Proposal (ECP)DI-SESS-80639E Associated Document(s) Line Item(s)

FD20602031098 0007

ELIN A001

Exhibit: A

ELIN A002

Item No.

0007AB

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO To be Negotiated To be Negotiated

ELIN A002

Status ReportDI-MGMT-80368A Associated Document(s) Line Item(s)

FD20602031098 0008

Exhibit: A

ELIN A003

Item No.

0007AC

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

ELIN A003

Contract Funds Status ReportDI-MGMT-81468/T Associated Document(s) Line Item(s)

FD20602031098 0009

Exhibit: A

ELIN A004

Item No.

0007AD

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

ELIN A004

Conference AgendaDI-ADMN-81249B Associated Document(s) Line Item(s)

FD20602031098 0010

Exhibit: A

ELIN A005

Item No.

0007AE

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

ELIN A005

Conference MinutesDI-ADMN-81250B Associated Document(s) Line Item(s)

ELIN A005

FD20602031098 0011

Exhibit: A

Item No.

0007AF

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

DATA

ELIN A0006

Report of Receipts, Inventory, Adjustments, and Shipments of Government PropertyDI-MGMT-80442 Associated Document(s) Line Item(s)

FD20602031098 0012

Exhibit: A

ANNUAL OPTION PERIOD I (THE 12 MONTH PERIOD IMMEDIATELY FOLLOWING BASIC CONTRACT

PERIOD OF PERFORMANCE).

OPTION I MAY BE EXERCISED AT ANY TIME WITHIN 365 DAYS OF BASIC AWARD PERIOD OF

PERFORMANCE. THE OPTION IS CONSIDERED EXERCISED UPON ELECTRONIC DISTRIBUTION OF THE

MODIFICATION.

Depot Level Support/Integration Mgmt Tasks

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO XXX XXX

Depot Level Support/Integration Mgmt Tasks IAW PWS dated 02 June 2020 Paragraphs 4.1.2, 4.4.2, 4.4.5, 4.4.6, 4.5.1

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Cost Voucher Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Depot Level Support/Integration Mgmt Tasks

Place of Perf Quantity (U/I) Beginning

Specified Date Ending Specified Date

Req No / Pri

Required Period of Performance

1 LO 31 DEC 2021 30 DEC 2022

Proposed Period of Performance

1 LO

Consumables

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO XXX XXX

Consumables IAW PWS dated 02 June 2020 Paragraphs 3.0, 4.1.8, 4.4.4

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Cost Voucher Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Place of Perf Quantity (U/I) Beginning

Specified Date Ending Specified Date

Req No / Pri

Required Period of Performance

1 LO 31 DEC 2021 30 DEC 2022

Proposed Period of

Contractor Inventory Control Point (C-ICP)

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

Contractor Inventory Control Point (C-ICP) IAW PWS dated 02 June 2020 Paragraphs 4.1.3, 4.1.4, 4.4, 4.6, 4.16.1, 4.16.2, 4.16.3

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Cost Voucher Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Place of Perf Quantity (U/I) Beginning

Specified Date Ending Specified Date

Req No / Pri

Required Period of Performance

1 LO 31 DEC 2021 30 DEC 2022 Non-MilStrip

Proposed Period of Performance

1 LO

Performance of C-ICP will be at Boeing, Fort Walton Beach, Fl 32548 (CAGE 022T1)

Travel

Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Travel as approved in advance by the contracting officer.

Travel and per diem in support of CLIN 1001.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Cost Voucher Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Travel

Place of Perf Quantity (U/I) Beginning

Specified Date Ending Specified Date

Req No / Pri

Required Period of Performance

1 LO 31 DEC 2021 30 DEC 2022

Proposed Period of Performance

1 LO

Over and Above

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated

Over and Above IAW PWS dated 02 June 2020 Paragraph 4.11.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Cost Voucher Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Place of Perf Quantity (U/I) Beginning

Specified Date Ending Specified Date

Req No / Pri

Required Period of Performance

1 LO 31 DEC 2021 30 DEC 2022

Proposed Period of

Transportation

Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Transportation Cost IAW PWS dated 02 June 20 Paragraphs 4.4.7, 4.4.8.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Cost Voucher Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Place of Perf Quantity (U/I) Beginning

Specified Date Ending Specified Date

Req No / Pri

Required Period of Performance

1 LO 31 DEC 2021 30 DEC 2022

Proposed Period of Performance

1 LO

Data

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

LO xxx

DATA

DATA in accordance with DD FORM 1423-1 attached hereto.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Cost Voucher Exhibit: A Quality Assurance: IAW DD FORM 1423-1 Type / Ship To Quantity (U/I) *ARO IAW DD FORM

1423-1 attached hereto _ Req No / Pri

Data

Required Delivery

+ IAW1423 1 LO Non-MilStrip

Proposed Delivery

+ IAW1423 1 LO

ELIN A001

Item No.

1007AA

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

ELIN A001

Engineering Change Proposal (ECP)DI-SESS-80639E Exhibit: A

ELIN A002

Item No.

1007AB

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO To be Negotiated To be Negotiated

ELIN A002

Status ReportDI-MGMT-80368A Exhibit: A

ELIN A003

Item No.

1007AC

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

ELIN A003

Contract Funds Status ReportDI-MGMT-81468/T Exhibit: A

ELIN A004

Item No.

1007AD

Firm Fixed Price Quantity U/I Unit Price Amount

ELIN A004

1 LO

ELIN A004

Conference AgendaDI-ADMN-81249B Exhibit: A

ELIN A005

Item No.

1007AE

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

ELIN A005

Conference MinutesDI-ADMN-81250B Exhibit: A

Item No.

1007AF

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

DATA

ELIN A0006

Report of Receipts, Inventory, Adjustments, and Shipments of Government PropertyDI-MGMT-80442 Exhibit: A

SHIP TO / PLACE OF PERFORMANCE

TYPE/CODE: + IAW1423

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

PART I - THE SCHEDULE

SECTION E

INSPECTION AND ACCEPTANCE

52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)

(IAW FAR 46.311, DFARS 246.202-4(1))

(a) The Contractor shall comply with the higher-level quality standard(s) listed below. [If more than one standard is listed, the offeror shall indicate its selection by checking the appropriate block.]*

Title Number Date Tailoring *See Individual Line Item Schedule

52.246-15 CERTIFICATE OF CONFORMANCE (APR 1984)

(IAW FAR 46.315, FAR 46.504)

52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)

(IAW FAR 46.316)

INSPECTION AND ACCEPTANCE (SEP 1999)

(IAW FAR 46.401(b), FAR 46.503)

Government Contract Quality Assurance Inspection and Acceptance will be at (Final):

[CONTRACTOR FILL-IN]

Item No(s): See schedule for items with the following code(s) listed below :

Inspection Code and Address:

Government Contract Quality Assurance Inspection and Acceptance will be at destination(s) specified herein (Final).

Item No(s): 0004, 0007, 1004, 1007

PART I - THE SCHEDULE

SECTION F

DELIVERIES OR PERFORMANCE

52.211-8 TIME OF DELIVERY (JUN 1997)

(IAW FAR 11.404(a)(2))

(a) The Government requires delivery to be made according to the following schedule:

DELIVERY FOR EACH ITEM IS ANNOTATED IN THE SCHEDULE (PART I SECTION B) UNDER EACH LINE ITEM.

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

ANNOTATE YOUR PROPOSED DELIVERY, IF ANY, UNDER THE GOVERNMENT’S DELIVERY SET FORTH UNDER EACH ITEM IN THE

SCHEDULE.

(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term "working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.

(The above Clause/Provision has been modified.)

52.211-8 TIME OF DELIVERY -- ALTERNATE I (APR 1984)

(IAW FAR 11.404(a)(2))

If the delivery schedule is expressed in terms of specific calendar dates or specific periods and is based on an assumed date of award, the contracting officer may substitute the following paragraph (b) for paragraph (b) of the basic clause. The time may be expressed by substituting "on or before"; "during the months ..."; or "not sooner than ... or later than ..." as headings for the third column of paragraph (a) the basic clause.

(b) The delivery dates or specific periods above are based on the assumption that the Government will make award by 30 December 2020. Each delivery date in the delivery schedule above will be extended by the number of calendar days after the above date that the contract is in fact awarded. Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed or otherwise furnished to the successful offeror results in a binding contract. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails.

(The above Clause/Provision has been modified.)

52.242-15 STOP-WORK ORDER (AUG 1989)

(IAW FAR 42.1305(b)(1))

52.242-15 STOP-WORK ORDER -- ALTERNATE I (APR 1984)

(IAW FAR 42.1305(b)(2))

PART I - THE SCHEDULE

SECTION G

CONTRACT ADMINISTRATION DATA

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)

(IAW DFARS 232.7004(b), PGI 232.7004(b)(1), DFARS 212.301(f)(liii))

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

(Contracting Officer: Insert applicable document type(s).

Note: If a “Combo” document type is identified but not supportable by the Contractor’s business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

(Contracting Officer: Insert inspection and acceptance locations or “Not applicable.”)

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC Issue By DoDAAC Admin DoDAAC Inspect By DoDAAC Ship To Code Ship From Code Mark For Code Service Approver (DoDAAC) Service Acceptor (DoDAAC) Accept at Other DoDAAC LPO DoDAAC DCAA Auditor DoDAAC Other DoDAAC(s) (*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g.

timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the e-mail address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

(Contracting Officer: Insert applicable email addresses or “Not applicable.”)

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

(Contracting Officer: Insert applicable information or “Not applicable.”)

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

PAYMENT INSTRUCTIONS:

In accordance with DFARS PGI 204.7108 Payment Instructions and OUSD(AT&L)/DPAP Memo dated 08 Mar 18 the following link shall be inserted when payment instructions are required.

https://www.acq.osd.mil/dpap/dars/pgi/pgi_htm/PGI204_71.htm#payment_instructions

ACCOUNTING AND APPROPRIATION DATA (AUG 1998)

Accounting and Appropriation Chargeable ACRN Funds Citation Amount Chargeable

AA LINE OF ACCOUNTING TO BE CITED AT CONTRACT AWARD $0.00

ACRN TOTAL $ 0.00

PART II - CONTRACT CLAUSES

SECTION I

CONTRACT CLAUSES

252.201-7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991)

(IAW DFARS 201.602-70)

5352.201-9101 OMBUDSMAN (OCT 2019)

(IAW AFFARS 5301.9103)

(c) If resolution cannot be made by the contracting officer, the interested party may contact the ombudsman, Timothy R.

Inman at 478 222 -4097 , FAX 000 000 -0000 , email timothy.inman@us.af.mil . Concerns, issues, disagreements, and recommendations that cannot be resolved at the Center/MAJCOM/DRU/SMC ombudsman level, may be brought by the interested party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (571) 256-2395, facsimile number (571) 256-2431.

52.202-1 DEFINITIONS (JUN 2020)

(IAW FAR 2.201)

52.203-3 GRATUITIES (APR 1984)

(IAW FAR 3.202)

52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

(IAW FAR 3.404)

52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)

(IAW FAR 3.503-2)

52.203-7 ANTI-KICKBACK PROCEDURES (JUN 2020)

(IAW FAR 3.502-3)

52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR

IMPROPER ACTIVITY (MAY 2014)

(IAW FAR 3.104-9(a))

52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

(IAW FAR 3.104-9(b))

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS

(JUN 2020)

(IAW FAR 3.808(b))

52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (JUN 2020)

(IAW FAR 3.1004(a))

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY

AGREEMENTS OR STATEMENTS (JAN 2017)

(IAW FAR 3.909-3 (b))

252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS

(SEP 2011)

(IAW DFARS 203.171-4(a), DFARS 212.301(f)(ii))

252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER

DEFENSE-CONTRACT-RELATED FELONIES (DEC 2008)

(IAW DFARS 203.570-3)

252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS

(SEP 2013)

(IAW DFARS 203.970)

252.203-7003 AGENCY OFFICE OF THE INSPECTOR GENERAL (DEC 2012)

(IAW DFARS 203.1004(a), DFARS 212.301(f)(iii))

252.203-7004 DISPLAY OF HOTLINE POSTERS (MAY 2019)

(IAW DFARS 203.1004(b)(2)(ii))

52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON RECYCLED PAPER (MAY 2011)

(IAW FAR 4.303)

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT

AWARDS (JUN 2020)

(IAW FAR 4.1403(a))

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)

(IAW FAR 4.1105(b))

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (JUL 2016)

(IAW FAR 4.1804(c), FAR 12.301(d))

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS

(DEC 2014)

(IAW FAR 4.1202(b))

52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS

(JUN 2016)

(IAW FAR 4.1903)

52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES

DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED

ENTITIES (JUL 2018)

(IAW FAR 4.2004)

52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND

VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (AUG 2019)

(IAW 4.2105(b))

252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)

(IAW DFARS 204.404-70(b))

252.204-7006 BILLING INSTRUCTIONS (OCT 2005)

(IAW DFARS 204.7109(b))

252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT

REPORTING (DEC 2019)

(IAW DFARS 204.7304(c))

252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION

SUPPORT (MAY 2016)

(IAW DFARS 204.7403(b), DFARS 212.301(f)(i)(F))

252.204-7018 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE

TELECOMMUNICATIONS EQUIPMENT OR SERVICES (DEC 2019)

(IAW DFARS 204.2105(c))

252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS

(DEC 1991)

(IAW DFARS 205.470, DFARS 212.301(f)(x))

52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT

(JUN 2020)

(IAW FAR 9.409)

52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING

RESPONSIBILITY MATTERS (OCT 2018)

(IAW FAR 9.104-7(c))

52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS

(NOV 2015)

(IAW FAR 9.108-5(b))

252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE

GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM

(MAY 2019)

(IAW DFARS 209.409)

52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008)

(IAW FAR 11.604(b)) This is a rated order certified for national defense , emergency preparedness, and energy program use, and the Contractor shall follow all the requirements of the Defense Priorities and Allocations System regulation (15 CFR 700).

252.211-7007 REPORTING OF GOVERNMENT-FURNISHED PROPERTY (AUG 2012)

(IAW DFARS 211.274-6(b), DFARS 212.301(f)(iv))

52.215-2 AUDIT AND RECORDS--NEGOTIATION (JUN 2020)

(IAW FAR 15.209(b)(1))

52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)

(IAW FAR 15.209(h), AFFARS 53.15.209(h))

52.215-10 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA

(AUG 2011)

(IAW FAR 15.408(b))

52.215-12 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA (DEVIATION 2018-O0015)

(MAY 2018) (MAY 2018)

(IAW DARS Tracking Number: 2018-O0015)

52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS (OCT 2010)

(IAW FAR 15.408(g))

52.215-18 REVERSION OR ADJUSTMENT OF PLANS FOR POSTRETIREMENT BENEFITS

(PRB) OTHER THAN PENSIONS (JUL 2005)

(IAW FAR 15.408(j))

52.215-19 NOTIFICATION OF OWNERSHIP CHANGES (OCT 1997)

(IAW FAR 15.408(k))

52.215-23 LIMITATIONS ON PASS-THROUGH CHARGES (JUN 2020)

(IAW FAR 15.408(n)(2))

252.215-7002 COST ESTIMATING SYSTEM REQUIREMENTS (DEC 2012)

(IAW DFARS 215.408(1))

252.215-7014 EXCEPTION FROM CERTIFIED COST OR PRICING DATA REQUIREMENTS FOR

FOREIGN MILITARY SALES INDIRECT OFFSETS (JUL 2018)

(IAW DFARS 215.408 (8))

52.216-7 ALLOWABLE COST AND PAYMENT (AUG 2018)

(IAW FAR 16.307(a))

(a) Invoicing.

(3) The designated payment office will make interim payments for contract financing on the _30th day

52.216-8 FIXED FEE (JUN 2011)

(IAW FAR 16.307(b))

52.216-11 COST CONTRACT--NO FEE (APR 1984)

(IAW FAR 16.307(e)(1))

52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

(IAW FAR 17.208(g))

(a) The Government may extend the term of this contract by written notice to the Contractor within See Schedule ; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 30 days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 24 months.

(The above Clause/Provision has been modified.)

52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2018)

(IAW FAR 19.708(a))

52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (DEVIATION 2018-O0018)

(AUG 2018)

(IAW DARS TRCKING # 2018-O0018)

52.219-16 LIQUIDATED DAMAGES--SUBCONTRACTING PLAN (JAN 1999)

(IAW FAR 19.708(b)(2))

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (MAY 2020)

(IAW FAR 19.309(c))

(h) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

(1) The Contractor represents that it [ ] is, [ ] is not a small business concern under NAICS Code ________ assigned to contract number _______________.

(2) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not, a small disadvantaged business concern as defined in 13 CFR 124.1002.

(3) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a women-owned small business concern.

(4) Women-owned small business (WOSB) concern eligible under the WOSB Program.

[Complete only if the Contractor represented itself as a women-owned small business concern in paragraph (h)(3) of this clause.] The Contractor represents that—

(i) It [ ] is, [ ] is not a WOSB concern eligible under the WOSB Program, has provided all the required documents to the WOSB Repository, and no change in circumstances or adverse decisions have been issued that affects its eligibility; and

(ii) It [ ] is, [ ] is not is not a joint venture that complies with the requirements of 13 CFR part 127, and the representation in paragraph (h)(4)(i) of this clause is accurate for each WOSB concern eligible under the WOSB Program participating in the joint venture.

[The Contractor shall enter the name or names of the WOSB concern eligible under the WOSB Program and other small businesses that are participating in the joint venture: _______________________________.] Each WOSB concern eligible under the WOSB Program participating in the joint venture shall submit a separate signed copy of the WOSB representation.

(5) Economically disadvantaged women-owned small business (EDWOSB) concern.

[Complete only if the Contractor represented itself as a women-owned small business concern eligible under the WOSB Program in (h)(4) of this clause.] The Contractor represents that—

(i) It [ ] is, [ ] is not an EDWOSB concern eligible under the WOSB Program, has provided all the required documents to the WOSB Repository, and no change in circumstances or adverse decisions have been issued that affects its eligibility; and

(ii) It [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR part 127, and the representation in paragraph (h)(5)(i) of this clause is accurate for each EDWOSB concern participating in the joint venture.

[The Contractor shall enter the name or names of the EDWOSB concern and other small businesses that are participating in the joint venture: ___________________________________.] Each EDWOSB concern participating in the joint venture shall submit a separate signed copy of the EDWOSB representation.

(6) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a veteran-owned small business concern.

(7) [Complete only if the Contractor represented itself as a veteran-owned small business concern in paragraph (h)(6) of this clause.] The Contractor represents that it [ ] is, [ ] is not a service-disabled veteran-owned small business concern.

(8) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that—

(i) It [ ] is, [ ] is not a HUBZone small business concern listed, on the date of this representation, on the List of Qualified HUBZone Small Business Concerns maintained by the Small Business Administration, and no material changes in ownership and control, principal office, or HUBZone employee percentage have occurred since it was certified in accordance with 13 CFR part 126; and

(ii) It [ ] is, [ ] is not a HUBZone joint venture that complies with the requirements of 13 CFR part 126, and the representation in paragraph (h)(8)(i) of this clause is accurate for each HUBZone small business concern participating in the HUBZone joint venture.

[The Contractor shall enter the names of each of the HUBZone small business concerns participating in the HUBZone joint venture: _________________________________________.] Each HUBZone small business concern participating in the HUBZone joint venture shall submit a separate signed copy of the HUBZone representation.

[Contractor to sign and date and insert authorized signer’s name and title.]

252.219-7003 SMALL BUSINESS SUBCONTRACTING PLAN (DoD CONTRACTS) (DEC 2019) (IAW DFARS 219.708(b)(1)(A), DFARS 219.708(b)(1)(A)(1))

252.219-7003 SMALL BUSINESS SUBCONTRACTING PLAN (DoD CONTRACTS)--ALTERNATE I

(DEC 2019)

(IAW DFARS 219.708(b)(1)(A)(2), DFARS 219.708(b)(1)(A)(1))

252.219-7004 SMALL BUSINESS SUBCONTRACTING PLAN (TEST PROGRAM) (MAY 2019)

(IAW DFARS 219.708(b)(1)(B))

52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)

(IAW FAR 22.103-5(a), AFFARS 5322.101-1)

52.222-2 PAYMENT FOR OVERTIME PREMIUMS (JUL 1990)

(IAW FAR 22.103-5(b))

(a) overtime premium does not exceed ___*___

*Overtime Premium $

52.222-3 CONVICT LABOR (JUN 2003)

(IAW FAR 22.202)

52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)

(IAW FAR 22.810(a)(1))

52.222-26 EQUAL OPPORTUNITY (SEP 2016)

(IAW FAR 22.810(e))

52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)

(IAW FAR 22.1310(a)(1), DFARS 222.1310(a)(1))

52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)

(IAW FAR 22.1408(a))

52.222-37 EMPLOYMENT REPORTS ON VETERANS (JUN 2020)

(IAW FAR 22.1310(b))

52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR

RELATIONS ACT (DEC 2010)

(IAW FAR 22.1605)

52.222-41 SERVICE CONTRACT LABOR STANDARDS (AUG 2018)

(IAW FAR 22.1006(a))

52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014)

(IAW FAR 22.1006(b)) This Statement is for Information Only:

It is not a Wage Determination

Employee Class Monetary Wage Fringe Benefits

52.222-44 FAIR LABOR STANDARDS ACT AND SERVICE CONTRACT LABOR

STANDARDS--PRICE ADJUSTMENT (MAY 2014)

(IAW FAR 22.1006(c)(2))

52.222-50 COMBATING TRAFFICKING IN PERSONS (JAN 2019)

(IAW FAR 22.1705(a)(1))

52.222-55 MINIMUM WAGES UNDER EXECUTIVE ORDER 13658 (DEC 2015)

(IAW FAR 22.1906)

52.222-62 PAID SICK LEAVE (EXECUTIVE ORDER 13706) (JAN 2017)

(IAW FAR 22.2110)

252.222-7006 RESTRICTIONS ON THE USE OF MANDATORY ARBITRATION AGREEMENTS

(DEC 2010)

(IAW DFARS 222.7405)

52.223-6 DRUG-FREE WORKPLACE (MAY 2001)

(IAW FAR 23.505)

52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE

DRIVING (JUN 2020)

(IAW FAR 23.1105)

52.224-3 PRIVACY TRAINING (JAN 2017)

(IAW FAR 24.302(a))

52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)

(IAW FAR 25.1103(a))

252.225-7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (DEC 2017)

(IAW DFARS 225.7002-3(a))

252.225-7013 DUTY-FREE ENTRY (MAR 2020)

(IAW DFARS 225.1101(4))

252.225-7033 WAIVER OF UNITED KINGDOM LEVIES (APR 2003)

(IAW DFARS 225.1101(8))

252.225-7048 EXPORT-CONTROLLED ITEMS (JUN 2013)

(IAW DFARS 225.7901-4)

252.225-7052 RESTRICTION ON THE ACQUISITION OF CERTAIN MAGNETS, TANTALUM, AND

TUNGSTEN (DEVIATION 2020-O0006) (FEB 2020)

(IAW DEVIATION 2020-O0006)

252.226-7001 UTILIZATION OF INDIAN ORGANIZATIONS, INDIAN-OWNED ECONOMIC

ENTERPRISES, AND NATIVE HAWAIIAN SMALL BUSINESS CONCERNS

(APR 2019)

(IAW DFARS 226.104)

52.227-1 AUTHORIZATION AND CONSENT (JUN 2020)

(IAW FAR 27.201-2(a)(1))

52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT

INFRINGEMENT (JUN 2020)

(IAW FAR 27.201-2(b))

52.228-7 INSURANCE--LIABILITY TO THIRD PERSONS (MAR 1996)

(IAW FAR 28.311-1)

52.229-4 FEDERAL, STATE, AND LOCAL TAXES (STATE AND LOCAL ADJUSTMENTS)

(FEB 2013)

(IAW FAR 29.401-3(b))

52.229-12 TAX ON CERTAIN FOREIGN PROCUREMENTS (JUN 2020)

(IAW 29.402-3(b))

52.230-2 COST ACCOUNTING STANDARDS (DEVIATION 2018-O0015) (MAY 2018)

(MAY 2018)

52.230-6 ADMINISTRATION OF COST ACCOUNTING STANDARDS (JUN 2010)

(IAW FAR 30.201-4(d)(1))

252.231-7000 SUPPLEMENTAL COST PRINCIPLES (DEC 1991)

(IAW DFARS 231.100-70)

52.232-1 PAYMENTS (APR 1984)

(IAW FAR 32.111(a)(1))

52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)

(IAW FAR 32.111(b)(1))

52.232-11 EXTRAS (APR 1984)

(IAW FAR 32.111(c)(2))

52.232-17 INTEREST (MAY 2014)

(IAW FAR 32.611(a), FAR 32.611(b))

52.232-20 LIMITATION OF COST (APR 1984)

(IAW FAR 32.706-2(a))

52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)

(IAW FAR 32.806(a)(1))

52.232-25 PROMPT PAYMENT (JAN 2017)

(IAW FAR 32.908(c))

(a) Invoice payments—

(5) Computing penalty amount. The Government will compute the interest penalty in accordance with the Office of Management and Budget prompt payment regulations at 5 CFR part 1315.

(i) For the sole purpose of computing an interest penalty that might be due the Contractor, Government acceptance is deemed to occur constructively on the 7th day (unless otherwise specified in this contract) after the Contractor delivers the supplies or performs the services in accordance with the terms and conditions of the contract, unless there is a disagreement over quantity, quality, or Contractor compliance with a contract provision. If actual acceptance occurs within the constructive acceptance period, the Government will base the determination of an interest penalty on the actual date of acceptance. The constructive acceptance requirement does not, however, compel Government officials to accept supplies or services, perform contract administration functions, or make payment prior to fulfilling their responsibilities.

52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--SYSTEM FOR AWARD

MANAGEMENT (OCT 2018)

(IAW FAR 32.1110(a)(1))

52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)

(IAW FAR 32.706-3)

52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS

SUBCONTRACTORS (DEC 2013)

(IAW FAR 32.009-2)

252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS

(DEC 2018)

(IAW DFARS 232.7004(a))

(a) Definitions. As used in this clause—

(1) “Contract financing payment” and “invoice payment” have the meanings given in section 32.001 of the Federal Acquisition Regulation.

(2) “Electronic form” means any automated system that transmits information electronically from the initiating system to all affected systems. Facsimile, e-mail, and scanned documents are not acceptable electronic forms for submission of payment requests. However, scanned documents are acceptable when they are part of a submission of a payment request made using Wide Area WorkFlow (WAWF) or another electronic form authorized by the Contracting Officer.

(3) “Payment request” means any request for contract financing payment or invoice payment submitted by the Contractor under this contract.

(b) Except as provided in paragraph (c) of this clause, the Contractor shall submit payment requests and receiving reports using WAWF, in one of the following electronic formats that WAWF accepts: Electronic Data Interchange, Secure File Transfer Protocol, or World Wide Web input. Information regarding WAWF is available on the Internet at https://wawf.eb.mil/ .

(c) The Contractor may submit a payment request and receiving report using other than WAWF only when—

(1) The Contracting Officer authorizes use of another electronic form. With such an authorization, the Contractor and the Contracting Officer shall agree to a plan, which shall include a timeline, specifying when the Contractor will transfer to WAWF;

(2) DoD is unable to receive a payment request or provide acceptance in electronic form;

(3) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor. In such cases, the Contractor shall include a copy of the Contracting Officer’s determination with each request for payment; or

(4) DoD makes a payment for commercial transportation services provided under a Government rate tender or a contract for transportation services using a DoD-approved electronic third party payment system or other exempted vendor payment/invoicing system (e.g., PowerTrack, Transportation Financial Management System, and Cargo and Billing System).

(d) The Contractor shall submit any non-electronic payment requests using the method or methods specified in Section G of the contract.

(e) In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.

252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006)

(IAW DFARS 232.7102)

252.232-7017 ACCELERATING PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS -

PROHIBITION ON FEES AND CONSIDERATION (APR 2020)

(IAW DFARS 232.009-2)

52.233-1 DISPUTES (MAY 2014)

(IAW FAR 33.215)

52.233-3 PROTEST AFTER AWARD (AUG 1996)

(IAW FAR 33.106(b))

52.233-3 PROTEST AFTER AWARD -- ALTERNATE I (JUN 1985)

(IAW FAR 33.106(b))

52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)

(IAW FAR 33.215(b))

252.237-7010 PROHIBITION ON INTERROGATION OF DETAINEES BY CONTRACTOR

PERSONNEL (JUN 2013)

(IAW DFARS 237.173-5)

52.242-1 NOTICE OF INTENT TO DISALLOW COSTS (APR 1984)

(IAW FAR 42.802)

52.242-4 CERTIFICATION OF FINAL INDIRECT COSTS (JAN 1997)

(IAW FAR 42.703-2(f))

(c) The certificate of final indirect costs shall read as follows:

CERTIFICATE OF FINAL INDIRECT COSTS

This is to certify that I have reviewed this proposal to establish final indirect cost rates and to the best of my knowledge and belief:

1. All costs included in this proposal (identify proposal and date) to establish final indirect costs rates for (identify period covered by rate) are allowable in accordance with the cost principles of the Federal Acquisition Regulation (FAR) and its supplements applicable to the contracts to which the final indirect cost rates will apply; and

2. This proposal does not include any costs which are expressly unallowable under applicable cost principles of the FAR or its supplements.

Firm: ___________________________________________________ Signature: _______________________________________________ Name of Certifying Official: __________________________________ Title: ____________________________________________________ Date of Execution: _________________________________________

52.242-5 PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (JAN 2017)

(IAW FAR 42.1504)

52.242-13 BANKRUPTCY (JUL 1995)

(IAW FAR 42.903)

252.242-7004 MATERIAL MANAGEMENT AND ACCOUNTING SYSTEM (MAY 2011)

(IAW DFARS 242.7204)

52.243-1 CHANGES--FIXED-PRICE (AUG 1987)

(IAW FAR 43.205(a)(1))

52.243-1 CHANGES--FIXED-PRICE -- ALTERNATE I (APR 1984)

(IAW FAR 43.205(a)(2))

52.243-2 CHANGES--COST-REIMBURSEMENT (AUG 1987)

(IAW FAR 43.205(b)(1))

52.243-2 CHANGES--COST-REIMBURSEMENT -- ALTERNATE I (APR 1984)

(IAW FAR 43.205(b)(2))

252.243-7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991)

(IAW DFARS 243.205-70)

252.243-7002 REQUESTS FOR EQUITABLE ADJUSTMENT (DEC 2012)

(IAW DFARS 243.205-71)

52.244-2 SUBCONTRACTS (JUN 2020)

(IAW FAR 44.204(a)(1), FAR 44.204(a)(3))

(d) If the Contractor has an approved purchasing system, the Contractor nevertheless shall obtain the Contracting Officer's written consent before placing the following subcontracts:

Subcontracts

(j) Paragraphs (c) and (e) of this clause do not apply to the following subcontracts, which were evaluated during negotiations:

Subcontracts

52.244-5 COMPETITION IN SUBCONTRACTING (DEC 1996)

(IAW FAR 44.204(c))

52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (JUN 2020)

(IAW FAR 44.403)

252.244-7001 CONTRACTOR PURCHASING SYSTEM ADMINISTRATION--BASIC (MAY 2014)

(IAW DFARS 244.305-71)

52.245-1 GOVERNMENT PROPERTY (JAN 2017)

(IAW FAR 45.107(a), DFARS 237.7003(c), DFARS 245.107)

52.245-9 USE AND CHARGES (APR 2012)

(IAW FAR 45.107(c))

252.245-7001 TAGGING, LABELING, AND MARKING OF GOVERNMENT-FURNISHED PROPERTY

(APR 2012)

(IAW DFARS 245.107(2))

252.245-7002 REPORTING LOSS OF GOVERNMENT PROPERTY (DEC 2017)

(IAW DFARS 245.107(3))

252.245-7002 REPORTING LOSS OF GOVERNMENT PROPERTY (DEVIATION 2020-O0004)

(FEB 2020)

(IAW Deviation 2020-O0004)

252.245-7003 CONTRACTOR PROPERTY MANAGEMENT SYSTEM ADMINISTRATION (APR 2012)

(IAW DFARS 245.107(4))

252.245-7004 REPORTING, REUTILIZATION, AND DISPOSAL (DEC 2017)

(IAW DFARS 245.107(5))

52.246-25 LIMITATION OF LIABILITY--SERVICES (FEB 1997)

(IAW FAR 46.805(a)(4))

52.248-1 VALUE ENGINEERING (JUN 2020)

(IAW FAR 48.201(b), FAR 48.201(f))

52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE)

(APR 2012)

(IAW FAR 49.502(b)(1)(i))

52.249-6 TERMINATION (COST-REIMBURSEMENT) (MAY 2004)

(IAW FAR 49.503(a)(1))

52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) (APR 1984)

(IAW FAR 49.504(a)(1))

52.249-14 EXCUSABLE DELAYS (APR 1984)

(IAW FAR 49.505(b))

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

(IAW FAR 52.107(b)) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text.

Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

Regulations URLs: (Click on the appropriate regulation.)

https://acquisition.gov/browse/index/far https://acquisition.gov/dfars https://acquisition.gov/affars

NOTE: After selecting the appropriate regulation above, at the "Table of Contents" page, conduct a search for the desired regulation reference using your browser's FIND function. When located, click on the regulation reference (hyperlink).

52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)

(IAW FAR 52.107(f))

(a) The use in this contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.

(b) The use in this contract of any Defense Federal Acquisition Regulation Supplement (48 CFR Chapter 2).clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

52.253-1 COMPUTER GENERATED FORMS (JAN 1991)

(IAW FAR 53.111)

PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J

LIST OF ATTACHMENTS

Form Number Description/File Name Date Number of Pages

1423-1…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .