Pricing Matrix.xls
XLS spreadsheet 140 KB Posted
- Attached to
- Administrative Management and General Management Consulting Services Federal contract opportunity
- Solicitation number
- FA8504-09-R-22495
About this file
Pricing Matrix
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA850409R22495-02.pdf | ||
| FA850409R22495-01.pdf | ||
| RFP 8504-09-R-22495 RFI and Questions.doc | DOC document | |
| DD Form 1423.doc | DOC document | |
| Order 0001.doc | DOC document | |
| Appendix C.doc | DOC document | |
| FACTS Sheet.doc | DOC document | |
| FA850409R22495.doc | DOC document | |
| Transmittal Letter.doc | DOC document | |
| PP Questionnaire.doc | DOC document | |
| PWS | — | |
| Subcontractor Consent Form.doc | DOC document | |
| Past Performance Questionnaire Tracking Record.doc | DOC document | |
| Client Authorization Letter.doc | DOC document | |
| DD Form 254.pdf | ||
| Wage Determination.pdf | ||
| PWS | — |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Labor Workload %s
| Note: | Decimal may not extend beyond 1 decimal place. | |||||||
| The total for the prime plus all subcontracts must equal 100% for each Labor Category. | ||||||||
| This spreadsheet may not be modified in any fashion. (Only populate cells under % and do not rename worksheet.) | ||||||||
| Labor Category | Prime % | Sub 1 % | Sub 2 % | Sub 3 % | Sub 4 % | Sub 5 % | Sub 6 % | |
| Aircraft Structural Engineer, Entry | ||||||||
| Aircraft Structural Engineer, Mid-level | ||||||||
| Aircraft Structural Engineer, Lead | ||||||||
| General Engineer, Entry | ||||||||
| General Engineer, Mid-level | ||||||||
| General Engineer, Lead | ||||||||
| Electrical/Avionics Engineer, Entry | ||||||||
| Electrical/Avionics Engineer, Mid-level | ||||||||
| Electrical/Avionics Engineer, Lead | ||||||||
| Program Manager, Entry | ||||||||
| Program Manager, Mid-level | ||||||||
| Program Manager, Senior | ||||||||
| Logisitician, Entry | ||||||||
| Logisitician, Mid-level | ||||||||
| Logisitician, Senior | ||||||||
| Equipment Specialist, Entry | ||||||||
| Equipment Specialist, Mid-level | ||||||||
| Equipment Specialist, Lead | ||||||||
| Administrative Support | ||||||||
| Analysts, Entry | ||||||||
| Analysts, Mid-level |
&LLabor Workload Distribution Percentages&CRFP FA8504-09-R-22495&RPricing Matrix, Attachment 4
Prime Labor Rates
| Contractor Name: | |||||||
| Contractor Address: | |||||||
| Note: Rates are based on Calendar Year (CY) Jan 01 - Dec 31. | |||||||
| Decimal may not extend beyond 2 decimal places. | |||||||
| This spreadsheet may not be modified in any fashion. (Only populate cells under each year and do not rename worksheet.) | |||||||
| Firm Fixed Price, On-Site Performance | |||||||
| Labor Category | CY 2009 | CY 2010 | CY 2011 | CY 2012 | CY 2013 | CY 2014 | CY 2015 |
| Aircraft Structural Engineer, Entry | |||||||
| Aircraft Structural Engineer, Mid-level | |||||||
| Aircraft Structural Engineer, Lead | |||||||
| General Engineer, Entry | |||||||
| General Engineer, Mid-level | |||||||
| General Engineer, Lead | |||||||
| Electrical/Avionics Engineer, Entry | |||||||
| Electrical/Avionics Engineer, Mid-level | |||||||
| Electrical/Avionics Engineer, Lead | |||||||
| Program Manager, Entry | |||||||
| Program Manager, Mid-level | |||||||
| Program Manager, Senior | |||||||
| Logisitician, Entry | |||||||
| Logisitician, Mid-level | |||||||
| Logisitician, Senior | |||||||
| Equipment Specialist, Entry | |||||||
| Equipment Specialist, Mid-level | |||||||
| Equipment Specialist, Lead | |||||||
| Administrative Support | |||||||
| Analysts, Entry | |||||||
| Analysts, Mid-level | |||||||
| Firm Fixed Price, Off-Site Performance | |||||||
| Labor Category | CY 2009 | CY 2010 | CY 2011 | CY 2012 | CY 2013 | CY 2014 | CY 2015 |
| Aircraft Structural Engineer, Entry | |||||||
| Aircraft Structural Engineer, Mid-level | |||||||
| Aircraft Structural Engineer, Lead | |||||||
| General Engineer, Entry | |||||||
| General Engineer, Mid-level | |||||||
| General Engineer, Lead | |||||||
| Electrical/Avionics Engineer, Entry | |||||||
| Electrical/Avionics Engineer, Mid-level | |||||||
| Electrical/Avionics Engineer, Lead | |||||||
| Program Manager, Entry | |||||||
| Program Manager, Mid-level | |||||||
| Program Manager, Senior | |||||||
| Logisitician, Entry | |||||||
| Logisitician, Mid-level | |||||||
| Logisitician, Senior | |||||||
| Equipment Specialist, Entry | |||||||
| Equipment Specialist, Mid-level | |||||||
| Equipment Specialist, Lead | |||||||
| Administrative Support | |||||||
| Analysts, Entry | |||||||
| Analysts, Mid-level | |||||||
| Time and Materials, On-Site Performance | |||||||
| Labor Category | CY 2009 | CY 2010 | CY 2011 | CY 2012 | CY 2013 | CY 2014 | CY 2015 |
| Aircraft Structural Engineer, Entry | |||||||
| Aircraft Structural Engineer, Mid-level | |||||||
| Aircraft Structural Engineer, Lead | |||||||
| General Engineer, Entry | |||||||
| General Engineer, Mid-level | |||||||
| General Engineer, Lead | |||||||
| Electrical/Avionics Engineer, Entry | |||||||
| Electrical/Avionics Engineer, Mid-level | |||||||
| Electrical/Avionics Engineer, Lead | |||||||
| Program Manager, Entry | |||||||
| Program Manager, Mid-level | |||||||
| Program Manager, Senior | |||||||
| Logisitician, Entry | |||||||
| Logisitician, Mid-level | |||||||
| Logisitician, Senior | |||||||
| Equipment Specialist, Entry | |||||||
| Equipment Specialist, Mid-level | |||||||
| Equipment Specialist, Lead | |||||||
| Administrative Support | |||||||
| Analysts, Entry | |||||||
| Analysts, Mid-level | |||||||
| Time and Materials, Off-Site Performance | |||||||
| Labor Category | CY 2009 | CY 2010 | CY 2011 | CY 2012 | CY 2013 | CY 2014 | CY 2015 |
| Aircraft Structural Engineer, Entry | |||||||
| Aircraft Structural Engineer, Mid-level | |||||||
| Aircraft Structural Engineer, Lead | |||||||
| General Engineer, Entry | |||||||
| General Engineer, Mid-level | |||||||
| General Engineer, Lead | |||||||
| Electrical/Avionics Engineer, Entry | |||||||
| Electrical/Avionics Engineer, Mid-level | |||||||
| Electrical/Avionics Engineer, Lead | |||||||
| Program Manager, Entry | |||||||
| Program Manager, Mid-level | |||||||
| Program Manager, Senior | |||||||
| Logisitician, Entry | |||||||
| Logisitician, Mid-level | |||||||
| Logisitician, Senior | |||||||
| Equipment Specialist, Entry | |||||||
| Equipment Specialist, Mid-level | |||||||
| Equipment Specialist, Lead | |||||||
| Administrative Support | |||||||
| Analysts, Entry | |||||||
| Analysts, Mid-level |
&LPrime Loaded Labor Rates&CRFP FA8504-09-R-22495&RPricing Matrix, Attachment 4 &R Page &P of &N
SubKtr 1 Labor Rates
| Subcontractor Name: | |||||||
| Subcontractor Address: | |||||||
| Note: Rates are based on Calendar Year (CY) Jan 01 - Dec 31. | |||||||
| Decimal may not extend beyond 2 decimal places. | |||||||
| This spreadsheet may not be modified in any fashion. (Only populate cells under each year and do not rename worksheet.) | |||||||
| Firm Fixed Price, On-Site Performance | |||||||
| Labor Category | CY 2009 | CY 2010 | CY 2011 | CY 2012 | CY 2013 | CY 2014 | CY 2015 |
| Aircraft Structural Engineer, Entry | |||||||
| Aircraft Structural Engineer, Mid-level | |||||||
| Aircraft Structural Engineer, Lead | |||||||
| General Engineer, Entry | |||||||
| General Engineer, Mid-level | |||||||
| General Engineer, Lead | |||||||
| Electrical/Avionics Engineer, Entry | |||||||
| Electrical/Avionics Engineer, Mid-level | |||||||
| Electrical/Avionics Engineer, Lead | |||||||
| Program Manager, Entry | |||||||
| Program Manager, Mid-level | |||||||
| Program Manager, Senior | |||||||
| Logisitician, Entry | |||||||
| Logisitician, Mid-level | |||||||
| Logisitician, Senior | |||||||
| Equipment Specialist, Entry | |||||||
| Equipment Specialist, Mid-level | |||||||
| Equipment Specialist, Lead | |||||||
| Administrative Support | |||||||
| Analysts, Entry | |||||||
| Analysts, Mid-level | |||||||
| Firm Fixed Price, Off-Site Performance | |||||||
| Labor Category | CY 2009 | CY 2010 | CY 2011 | CY 2012 | CY 2013 | CY 2014 | CY 2015 |
| Aircraft Structural Engineer, Entry | |||||||
| Aircraft Structural Engineer, Mid-level | |||||||
| Aircraft Structural Engineer, Lead | |||||||
| General Engineer, Entry | |||||||
| General Engineer, Mid-level | |||||||
| General Engineer, Lead | |||||||
| Electrical/Avionics Engineer, Entry | |||||||
| Electrical/Avionics Engineer, Mid-level | |||||||
| Electrical/Avionics Engineer, Lead | |||||||
| Program Manager, Entry | |||||||
| Program Manager, Mid-level | |||||||
| Program Manager, Senior | |||||||
| Logisitician, Entry | |||||||
| Logisitician, Mid-level | |||||||
| Logisitician, Senior | |||||||
| Equipment Specialist, Entry | |||||||
| Equipment Specialist, Mid-level | |||||||
| Equipment Specialist, Lead | |||||||
| Administrative Support | |||||||
| Analysts, Entry | |||||||
| Analysts, Mid-level | |||||||
| Time and Materials, On-Site Performance | |||||||
| Labor Category | CY 2009 | CY 2010 | CY 2011 | CY 2012 | CY 2013 | CY 2014 | CY 2015 |
| Aircraft Structural Engineer, Entry | |||||||
| Aircraft Structural Engineer, Mid-level | |||||||
| Aircraft Structural Engineer, Lead | |||||||
| General Engineer, Entry | |||||||
| General Engineer, Mid-level | |||||||
| General Engineer, Lead | |||||||
| Electrical/Avionics Engineer, Entry | |||||||
| Electrical/Avionics Engineer, Mid-level | |||||||
| Electrical/Avionics Engineer, Lead | |||||||
| Program Manager, Entry | |||||||
| Program Manager, Mid-level | |||||||
| Program Manager, Senior | |||||||
| Logisitician, Entry | |||||||
| Logisitician, Mid-level | |||||||
| Logisitician, Senior | |||||||
| Equipment Specialist, Entry | |||||||
| Equipment Specialist, Mid-level | |||||||
| Equipment Specialist, Lead | |||||||
| Administrative Support | |||||||
| Analysts, Entry | |||||||
| Analysts, Mid-level | |||||||
| Time and Materials, Off-Site Performance | |||||||
| Labor Category | CY 2009 | CY 2010 | CY 2011 | CY 2012 | CY 2013 | CY 2014 | CY 2015 |
| Aircraft Structural Engineer, Entry | |||||||
| Aircraft Structural Engineer, Mid-level | |||||||
| Aircraft Structural Engineer, Lead | |||||||
| General Engineer, Entry | |||||||
| General Engineer, Mid-level | |||||||
| General Engineer, Lead | |||||||
| Electrical/Avionics Engineer, Entry | |||||||
| Electrical/Avionics Engineer, Mid-level | |||||||
| Electrical/Avionics Engineer, Lead | |||||||
| Program Manager, Entry | |||||||
| Program Manager, Mid-level | |||||||
| Program Manager, Senior | |||||||
| Logisitician, Entry | |||||||
| Logisitician, Mid-level | |||||||
| Logisitician, Senior | |||||||
| Equipment Specialist, Entry | |||||||
| Equipment Specialist, Mid-level | |||||||
| Equipment Specialist, Lead | |||||||
| Administrative Support | |||||||
| Analysts, Entry | |||||||
| Analysts, Mid-level |
&LSubcontractor 1 Loaded Labor Rates&CRFP FA8504-09-R-22495&RPricing Matrix, Attachment 4 &R Page &P of &N
SubKtr 2 Labor Rates
| Subcontractor Name: | |||||||
| Subcontractor Address: | |||||||
| Note: Rates are based on Calendar Year (CY) Jan 01 - Dec 31. | |||||||
| Decimal may not extend beyond 2 decimal places. | |||||||
| This spreadsheet may not be modified in any fashion. (Only populate cells under each year and do not rename worksheet.) | |||||||
| Firm Fixed Price, On-Site Performance | |||||||
| Labor Category | CY 2009 | CY 2010 | CY 2011 | CY 2012 | CY 2013 | CY 2014 | CY 2015 |
| Aircraft Structural Engineer, Entry | |||||||
| Aircraft Structural Engineer, Mid-level | |||||||
| Aircraft Structural Engineer, Lead | |||||||
| General Engineer, Entry | |||||||
| General Engineer, Mid-level | |||||||
| General Engineer, Lead | |||||||
| Electrical/Avionics Engineer, Entry | |||||||
| Electrical/Avionics Engineer, Mid-level | |||||||
| Electrical/Avionics Engineer, Lead | |||||||
| Program Manager, Entry | |||||||
| Program Manager, Mid-level | |||||||
| Program Manager, Senior | |||||||
| Logisitician, Entry | |||||||
| Logisitician, Mid-level | |||||||
| Logisitician, Senior | |||||||
| Equipment Specialist, Entry | |||||||
| Equipment Specialist, Mid-level | |||||||
| Equipment Specialist, Lead | |||||||
| Administrative Support | |||||||
| Analysts, Entry | |||||||
| Analysts, Mid-level | |||||||
| Firm Fixed Price, Off-Site Performance | |||||||
| Labor Category | CY 2009 | CY 2010 | CY 2011 | CY 2012 | CY 2013 | CY 2014 | CY 2015 |
| Aircraft Structural Engineer, Entry | |||||||
| Aircraft Structural Engineer, Mid-level | |||||||
| Aircraft Structural Engineer, Lead | |||||||
| General Engineer, Entry | |||||||
| General Engineer, Mid-level | |||||||
| General Engineer, Lead | |||||||
| Electrical/Avionics Engineer, Entry | |||||||
| Electrical/Avionics Engineer, Mid-level | |||||||
| Electrical/Avionics Engineer, Lead | |||||||
| Program Manager, Entry | |||||||
| Program Manager, Mid-level | |||||||
| Program Manager, Senior | |||||||
| Logisitician, Entry | |||||||
| Logisitician, Mid-level | |||||||
| Logisitician, Senior | |||||||
| Equipment Specialist, Entry | |||||||
| Equipment Specialist, Mid-level | |||||||
| Equipment Specialist, Lead | |||||||
| Administrative Support | |||||||
| Analysts, Entry | |||||||
| Analysts, Mid-level | |||||||
| Time and Materials, On-Site Performance | |||||||
| Labor Category | CY 2009 | CY 2010 | CY 2011 | CY 2012 | CY 2013 | CY 2014 | CY 2015 |
| Aircraft Structural Engineer, Entry | |||||||
| Aircraft Structural Engineer, Mid-level | |||||||
| Aircraft Structural Engineer, Lead | |||||||
| General Engineer, Entry | |||||||
| General Engineer, Mid-level | |||||||
| General Engineer, Lead | |||||||
| Electrical/Avionics Engineer, Entry | |||||||
| Electrical/Avionics Engineer, Mid-level | |||||||
| Electrical/Avionics Engineer, Lead | |||||||
| Program Manager, Entry | |||||||
| Program Manager, Mid-level | |||||||
| Program Manager, Senior | |||||||
| Logisitician, Entry | |||||||
| Logisitician, Mid-level | |||||||
| Logisitician, Senior | |||||||
| Equipment Specialist, Entry | |||||||
| Equipment Specialist, Mid-level | |||||||
| Equipment Specialist, Lead | |||||||
| Administrative Support | |||||||
| Analysts, Entry | |||||||
| Analysts, Mid-level | |||||||
| Time and Materials, Off-Site Performance | |||||||
| Labor Category | CY 2009 | CY 2010 | CY 2011 | CY 2012 | CY 2013 | CY 2014 | CY 2015 |
| Aircraft Structural Engineer, Entry | |||||||
| Aircraft Structural Engineer, Mid-level | |||||||
| Aircraft Structural Engineer, Lead | |||||||
| General Engineer, Entry | |||||||
| General Engineer, Mid-level | |||||||
| General Engineer, Lead | |||||||
| Electrical/Avionics Engineer, Entry | |||||||
| Electrical/Avionics Engineer, Mid-level | |||||||
| Electrical/Avionics Engineer, Lead | |||||||
| Program Manager, Entry | |||||||
| Program Manager, Mid-level | |||||||
| Program Manager, Senior | |||||||
| Logisitician, Entry | |||||||
| Logisitician, Mid-level | |||||||
| Logisitician, Senior | |||||||
| Equipment Specialist, Entry | |||||||
| Equipment Specialist, Mid-level | |||||||
| Equipment Specialist, Lead | |||||||
| Administrative Support | |||||||
| Analysts, Entry | |||||||
| Analysts, Mid-level |
&LSubcontractor 2 Loaded Labor Rates&CRFP FA8504-09-R-22495&RPricing Matrix, Attachment 4 &R Page &P of &N
SubKtr 3 Labor Rates
| Subcontractor Name: | |||||||
| Subcontractor Address: | |||||||
| Note: Rates are based on Calendar Year (CY) Jan 01 - Dec 31. | |||||||
| Decimal may not extend beyond 2 decimal places. | |||||||
| This spreadsheet may not be modified in any fashion. (Only populate cells under each year and do not rename worksheet.) | |||||||
| Firm Fixed Price, On-Site Performance | |||||||
| Labor Category | CY 2009 | CY 2010 | CY 2011 | CY 2012 | CY 2013 | CY 2014 | CY 2015 |
| Aircraft Structural Engineer, Entry | |||||||
| Aircraft Structural Engineer, Mid-level | |||||||
| Aircraft Structural Engineer, Lead | |||||||
| General Engineer, Entry | |||||||
| General Engineer, Mid-level | |||||||
| General Engineer, Lead | |||||||
| Electrical/Avionics Engineer, Entry | |||||||
| Electrical/Avionics Engineer, Mid-level | |||||||
| Electrical/Avionics Engineer, Lead | |||||||
| Program Manager, Entry | |||||||
| Program Manager, Mid-level | |||||||
| Program Manager, Senior | |||||||
| Logisitician, Entry | |||||||
| Logisitician, Mid-level | |||||||
| Logisitician, Senior | |||||||
| Equipment Specialist, Entry | |||||||
| Equipment Specialist, Mid-level | |||||||
| Equipment Specialist, Lead | |||||||
| Administrative Support | |||||||
| Analysts, Entry | |||||||
| Analysts, Mid-level | |||||||
| Firm Fixed Price, Off-Site Performance | |||||||
| Labor Category | CY 2009 | CY 2010 | CY 2011 | CY 2012 | CY 2013 | CY 2014 | CY 2015 |
| Aircraft Structural Engineer, Entry | |||||||
| Aircraft Structural Engineer, Mid-level | |||||||
| Aircraft Structural Engineer, Lead | |||||||
| General Engineer, Entry | |||||||
| General Engineer, Mid-level | |||||||
| General Engineer, Lead | |||||||
| Electrical/Avionics Engineer, Entry | |||||||
| Electrical/Avionics Engineer, Mid-level | |||||||
| Electrical/Avionics Engineer, Lead | |||||||
| Program Manager, Entry | |||||||
| Program Manager, Mid-level | |||||||
| Program Manager, Senior | |||||||
| Logisitician, Entry | |||||||
| Logisitician, Mid-level | |||||||
| Logisitician, Senior | |||||||
| Equipment Specialist, Entry | |||||||
| Equipment Specialist, Mid-level | |||||||
| Equipment Specialist, Lead | |||||||
| Administrative Support | |||||||
| Analysts, Entry | |||||||
| Analysts, Mid-level | |||||||
| Time and Materials, On-Site Performance | |||||||
| Labor Category | CY 2009 | CY 2010 | CY 2011 | CY 2012 | CY 2013 | CY 2014 | CY 2015 |
| Aircraft Structural Engineer, Entry | |||||||
| Aircraft Structural Engineer, Mid-level | |||||||
| Aircraft Structural Engineer, Lead | |||||||
| General Engineer, Entry | |||||||
| General Engineer, Mid-level | |||||||
| General Engineer, Lead | |||||||
| Electrical/Avionics Engineer, Entry | |||||||
| Electrical/Avionics Engineer, Mid-level | |||||||
| Electrical/Avionics Engineer, Lead | |||||||
| Program Manager, Entry | |||||||
| Program Manager, Mid-level | |||||||
| Program Manager, Senior | |||||||
| Logisitician, Entry | |||||||
| Logisitician, Mid-level | |||||||
| Logisitician, Senior | |||||||
| Equipment Specialist, Entry | |||||||
| Equipment Specialist, Mid-level | |||||||
| Equipment Specialist, Lead | |||||||
| Administrative Support | |||||||
| Analysts, Entry | |||||||
| Analysts, Mid-level | |||||||
| Time and Materials, Off-Site Performance | |||||||
| Labor Category | CY 2009 | CY 2010 | CY 2011 | CY 2012 | CY 2013 | CY 2014 | CY 2015 |
| Aircraft Structural Engineer, Entry | |||||||
| Aircraft Structural Engineer, Mid-level | |||||||
| Aircraft Structural Engineer, Lead | |||||||
| General Engineer, Entry | |||||||
| General Engineer, Mid-level | |||||||
| General Engineer, Lead | |||||||
| Electrical/Avionics Engineer, Entry | |||||||
| Electrical/Avionics Engineer, Mid-level | |||||||
| Electrical/Avionics Engineer, Lead | |||||||
| Program Manager, Entry | |||||||
| Program Manager, Mid-level | |||||||
| Program Manager, Senior | |||||||
| Logisitician, Entry | |||||||
| Logisitician, Mid-level | |||||||
| Logisitician, Senior | |||||||
| Equipment Specialist, Entry | |||||||
| Equipment Specialist, Mid-level | |||||||
| Equipment Specialist, Lead | |||||||
| Administrative Support | |||||||
| Analysts, Entry | |||||||
| Analysts, Mid-level |
&LSubcontractor 3 Loaded Labor Rates&CRFP FA8504-09-R-22495&RPricing Matrix, Attachment 4 &R Page &P of &N
SubKtr 4 Labor Rates
| Subcontractor Name: | |||||||
| Subcontractor Address: | |||||||
| Note: Rates are based on Calendar Year (CY) Jan 01 - Dec 31. | |||||||
| Decimal may not extend beyond 2 decimal places. | |||||||
| This spreadsheet may not be modified in any fashion. (Only populate cells under each year and do not rename worksheet.) | |||||||
| Firm Fixed Price, On-Site Performance | |||||||
| Labor Category | CY 2009 | CY 2010 | CY 2011 | CY 2012 | CY 2013 | CY 2014 | CY 2015 |
| Aircraft Structural Engineer, Entry | |||||||
| Aircraft Structural Engineer, Mid-level | |||||||
| Aircraft Structural Engineer, Lead | |||||||
| General Engineer, Entry | |||||||
| General Engineer, Mid-level | |||||||
| General Engineer, Lead | |||||||
| Electrical/Avionics Engineer, Entry | |||||||
| Electrical/Avionics Engineer, Mid-level | |||||||
| Electrical/Avionics Engineer, Lead | |||||||
| Program Manager, Entry | |||||||
| Program Manager, Mid-level | |||||||
| Program Manager, Senior | |||||||
| Logisitician, Entry | |||||||
| Logisitician, Mid-level | |||||||
| Logisitician, Senior | |||||||
| Equipment Specialist, Entry | |||||||
| Equipment Specialist, Mid-level | |||||||
| Equipment Specialist, Lead | |||||||
| Administrative Support | |||||||
| Analysts, Entry | |||||||
| Analysts, Mid-level | |||||||
| Firm Fixed Price, Off-Site Performance | |||||||
| Labor Category | CY 2009 | CY 2010 | CY 2011 | CY 2012 | CY 2013 | CY 2014 | CY 2015 |
| Aircraft Structural Engineer, Entry | |||||||
| Aircraft Structural Engineer, Mid-level | |||||||
| Aircraft Structural Engineer, Lead | |||||||
| General Engineer, Entry | |||||||
| General Engineer, Mid-level | |||||||
| General Engineer, Lead | |||||||
| Electrical/Avionics Engineer, Entry | |||||||
| Electrical/Avionics Engineer, Mid-level | |||||||
| Electrical/Avionics Engineer, Lead | |||||||
| Program Manager, Entry | |||||||
| Program Manager, Mid-level | |||||||
| Program Manager, Senior | |||||||
| Logisitician, Entry | |||||||
| Logisitician, Mid-level | |||||||
| Logisitician, Senior | |||||||
| Equipment Specialist, Entry | |||||||
| Equipment Specialist, Mid-level | |||||||
| Equipment Specialist, Lead | |||||||
| Administrative Support | |||||||
| Analysts, Entry | |||||||
| Analysts, Mid-level | |||||||
| Time and Materials, On-Site Performance | |||||||
| Labor Category | CY 2009 | CY 2010 | CY 2011 | CY 2012 | CY 2013 | CY 2014 | CY 2015 |
| Aircraft Structural Engineer, Entry | |||||||
| Aircraft Structural Engineer, Mid-level | |||||||
| Aircraft Structural Engineer, Lead | |||||||
| General Engineer, Entry | |||||||
| General Engineer, Mid-level | |||||||
| General Engineer, Lead | |||||||
| Electrical/Avionics Engineer, Entry | |||||||
| Electrical/Avionics Engineer, Mid-level | |||||||
| Electrical/Avionics Engineer, Lead | |||||||
| Program Manager, Entry | |||||||
| Program Manager, Mid-level | |||||||
| Program Manager, Senior | |||||||
| Logisitician, Entry | |||||||
| Logisitician, Mid-level | |||||||
| Logisitician, Senior | |||||||
| Equipment Specialist, Entry | |||||||
| Equipment Specialist, Mid-level | |||||||
| Equipment Specialist, Lead | |||||||
| Administrative Support | |||||||
| Analysts, Entry | |||||||
| Analysts, Mid-level | |||||||
| Time and Materials, Off-Site Performance | |||||||
| Labor Category | CY 2009 | CY 2010 | CY 2011 | CY 2012 | CY 2013 | CY 2014 | CY 2015 |
| Aircraft Structural Engineer, Entry | |||||||
| Aircraft Structural Engineer, Mid-level | |||||||
| Aircraft Structural Engineer, Lead | |||||||
| General Engineer, Entry | |||||||
| General Engineer, Mid-level | |||||||
| General Engineer, Lead | |||||||
| Electrical/Avionics Engineer, Entry | |||||||
| Electrical/Avionics Engineer, Mid-level | |||||||
| Electrical/Avionics Engineer, Lead | |||||||
| Program Manager, Entry | |||||||
| Program Manager, Mid-level | |||||||
| Program Manager, Senior | |||||||
| Logisitician, Entry | |||||||
| Logisitician, Mid-level | |||||||
| Logisitician, Senior | |||||||
| Equipment Specialist, Entry | |||||||
| Equipment Specialist, Mid-level | |||||||
| Equipment Specialist, Lead | |||||||
| Administrative Support | |||||||
| Analysts, Entry | |||||||
| Analysts, Mid-level |
&LSubcontractor 4 Loaded Labor Rates&CRFP FA8504-09-R-22495&RPricing Matrix, Attachment 4 &R Page &P of &N
SubKtr 5 Labor Rates
| Subcontractor Name: | |||||||
| Subcontractor Address: | |||||||
| Note: Rates are based on Calendar Year (CY) Jan 01 - Dec 31. | |||||||
| Decimal may not extend beyond 2 decimal places. | |||||||
| This spreadsheet may not be modified in any fashion. (Only populate cells under each year and do not rename worksheet.) | |||||||
| Firm Fixed Price, On-Site Performance | |||||||
| Labor Category | CY 2009 | CY 2010 | CY 2011 | CY 2012 | CY 2013 | CY 2014 | CY 2015 |
| Aircraft Structural Engineer, Entry | |||||||
| Aircraft Structural Engineer, Mid-level | |||||||
| Aircraft Structural Engineer, Lead | |||||||
| General Engineer, Entry | |||||||
| General Engineer, Mid-level | |||||||
| General Engineer, Lead | |||||||
| Electrical/Avionics Engineer, Entry | |||||||
| Electrical/Avionics Engineer, Mid-level | |||||||
| Electrical/Avionics Engineer, Lead | |||||||
| Program Manager, Entry | |||||||
| Program Manager, Mid-level | |||||||
| Program Manager, Senior | |||||||
| Logisitician, Entry | |||||||
| Logisitician, Mid-level | |||||||
| Logisitician, Senior | |||||||
| Equipment Specialist, Entry | |||||||
| Equipment Specialist, Mid-level | |||||||
| Equipment Specialist, Lead | |||||||
| Administrative Support | |||||||
| Analysts, Entry | |||||||
| Analysts, Mid-level | |||||||
| Firm Fixed Price, Off-Site Performance | |||||||
| Labor Category | CY 2009 | CY 2010 | CY 2011 | CY 2012 | CY 2013 | CY 2014 | CY 2015 |
| Aircraft Structural Engineer, Entry | |||||||
| Aircraft Structural Engineer, Mid-level | |||||||
| Aircraft Structural Engineer, Lead | |||||||
| General Engineer, Entry | |||||||
| General Engineer, Mid-level | |||||||
| General Engineer, Lead | |||||||
| Electrical/Avionics Engineer, Entry | |||||||
| Electrical/Avionics Engineer, Mid-level | |||||||
| Electrical/Avionics Engineer, Lead | |||||||
| Program Manager, Entry | |||||||
| Program Manager, Mid-level | |||||||
| Program Manager, Senior | |||||||
| Logisitician, Entry | |||||||
| Logisitician, Mid-level | |||||||
| Logisitician, Senior | |||||||
| Equipment Specialist, Entry | |||||||
| Equipment Specialist, Mid-level | |||||||
| Equipment Specialist, Lead | |||||||
| Administrative Support | |||||||
| Analysts, Entry | |||||||
| Analysts, Mid-level | |||||||
| Time and Materials, On-Site Performance | |||||||
| Labor Category | CY 2009 | CY 2010 | CY 2011 | CY 2012 | CY 2013 | CY 2014 | CY 2015 |
| Aircraft Structural Engineer, Entry | |||||||
| Aircraft Structural Engineer, Mid-level | |||||||
| Aircraft Structural Engineer, Lead | |||||||
| General Engineer, Entry | |||||||
| General Engineer, Mid-level | |||||||
| General Engineer, Lead | |||||||
| Electrical/Avionics Engineer, Entry | |||||||
| Electrical/Avionics Engineer, Mid-level | |||||||
| Electrical/Avionics Engineer, Lead | |||||||
| Program Manager, Entry | |||||||
| Program Manager, Mid-level | |||||||
| Program Manager, Senior | |||||||
| Logisitician, Entry | |||||||
| Logisitician, Mid-level | |||||||
| Logisitician, Senior | |||||||
| Equipment Specialist, Entry | |||||||
| Equipment Specialist, Mid-level | |||||||
| Equipment Specialist, Lead | |||||||
| Administrative Support | |||||||
| Analysts, Entry | |||||||
| Analysts, Mid-level | |||||||
| Time and Materials, Off-Site Performance | |||||||
| Labor Category | CY 2009 | CY 2010 | CY 2011 | CY 2012 | CY 2013 | CY 2014 | CY 2015 |
| Aircraft Structural Engineer, Entry | |||||||
| Aircraft Structural Engineer, Mid-level | |||||||
| Aircraft Structural Engineer, Lead | |||||||
| General Engineer, Entry | |||||||
| General Engineer, Mid-level | |||||||
| General Engineer, Lead | |||||||
| Electrical/Avionics Engineer, Entry | |||||||
| Electrical/Avionics Engineer, Mid-level | |||||||
| Electrical/Avionics Engineer, Lead | |||||||
| Program Manager, Entry | |||||||
| Program Manager, Mid-level | |||||||
| Program Manager, Senior | |||||||
| Logisitician, Entry | |||||||
| Logisitician, Mid-level | |||||||
| Logisitician, Senior | |||||||
| Equipment Specialist, Entry | |||||||
| Equipment Specialist, Mid-level | |||||||
| Equipment Specialist, Lead | |||||||
| Administrative Support | |||||||
| Analysts, Entry | |||||||
| Analysts, Mid-level |
&LSubcontractor 5 Loaded Labor Rates&CRFP FA8504-09-R-22495&RPricing Matrix, Attachment 4 &R Page &P of &N
SubKtr 6 Labor Rates
| Subcontractor Name: | |||||||
| Subcontractor Address: | |||||||
| Note: Rates are based on Calendar Year (CY) Jan 01 - Dec 31. | |||||||
| Decimal may not extend beyond 2 decimal places. | |||||||
| This spreadsheet may not be modified in any fashion. (Only populate cells under each year and do not rename worksheet.) | |||||||
| Firm Fixed Price, On-Site Performance | |||||||
| Labor Category | CY 2009 | CY 2010 | CY 2011 | CY 2012 | CY 2013 | CY 2014 | CY 2015 |
| Aircraft Structural Engineer, Entry | |||||||
| Aircraft Structural Engineer, Mid-level | |||||||
| Aircraft Structural Engineer, Lead | |||||||
| General Engineer, Entry | |||||||
| General Engineer, Mid-level | |||||||
| General Engineer, Lead | |||||||
| Electrical/Avionics Engineer, Entry | |||||||
| Electrical/Avionics Engineer, Mid-level | |||||||
| Electrical/Avionics Engineer, Lead | |||||||
| Program Manager, Entry | |||||||
| Program Manager, Mid-level | |||||||
| Program Manager, Senior | |||||||
| Logisitician, Entry | |||||||
| Logisitician, Mid-level | |||||||
| Logisitician, Senior | |||||||
| Equipment Specialist, Entry | |||||||
| Equipment Specialist, Mid-level | |||||||
| Equipment Specialist, Lead | |||||||
| Administrative Support | |||||||
| Analysts, Entry | |||||||
| Analysts, Mid-level | |||||||
| Firm Fixed Price, Off-Site Performance | |||||||
| Labor Category | CY 2009 | CY 2010 | CY 2011 | CY 2012 | CY 2013 | CY 2014 | CY 2015 |
| Aircraft Structural Engineer, Entry | |||||||
| Aircraft Structural Engineer, Mid-level | |||||||
| Aircraft Structural Engineer, Lead | |||||||
| General Engineer, Entry | |||||||
| General Engineer, Mid-level | |||||||
| General Engineer, Lead | |||||||
| Electrical/Avionics Engineer, Entry | |||||||
| Electrical/Avionics Engineer, Mid-level | |||||||
| Electrical/Avionics Engineer, Lead | |||||||
| Program Manager, Entry | |||||||
| Program Manager, Mid-level | |||||||
| Program Manager, Senior | |||||||
| Logisitician, Entry | |||||||
| Logisitician, Mid-level | |||||||
| Logisitician, Senior | |||||||
| Equipment Specialist, Entry | |||||||
| Equipment Specialist, Mid-level | |||||||
| Equipment Specialist, Lead | |||||||
| Administrative Support | |||||||
| Analysts, Entry | |||||||
| Analysts, Mid-level | |||||||
| Time and Materials, On-Site Performance | |||||||
| Labor Category | CY 2009 | CY 2010 | CY 2011 | CY 2012 | CY 2013 | CY 2014 | CY 2015 |
| Aircraft Structural Engineer, Entry | |||||||
| Aircraft Structural Engineer, Mid-level | |||||||
| Aircraft Structural Engineer, Lead | |||||||
| General Engineer, Entry | |||||||
| General Engineer, Mid-level | |||||||
| General Engineer, Lead | |||||||
| Electrical/Avionics Engineer, Entry | |||||||
| Electrical/Avionics Engineer, Mid-level | |||||||
| Electrical/Avionics Engineer, Lead | |||||||
| Program Manager, Entry | |||||||
| Program Manager, Mid-level | |||||||
| Program Manager, Senior | |||||||
| Logisitician, Entry | |||||||
| Logisitician, Mid-level | |||||||
| Logisitician, Senior | |||||||
| Equipment Specialist, Entry | |||||||
| Equipment Specialist, Mid-level | |||||||
| Equipment Specialist, Lead | |||||||
| Administrative Support | |||||||
| Analysts, Entry | |||||||
| Analysts, Mid-level | |||||||
| Time and Materials, Off-Site Performance | |||||||
| Labor Category | CY 2009 | CY 2010 | CY 2011 | CY 2012 | CY 2013 | CY 2014 | CY 2015 |
| Aircraft Structural Engineer, Entry | |||||||
| Aircraft Structural Engineer, Mid-level | |||||||
| Aircraft Structural Engineer, Lead | |||||||
| General Engineer, Entry | |||||||
| General Engineer, Mid-level | |||||||
| General Engineer, Lead | |||||||
| Electrical/Avionics Engineer, Entry | |||||||
| Electrical/Avionics Engineer, Mid-level | |||||||
| Electrical/Avionics Engineer, Lead | |||||||
| Program Manager, Entry | |||||||
| Program Manager, Mid-level | |||||||
| Program Manager, Senior | |||||||
| Logisitician, Entry | |||||||
| Logisitician, Mid-level | |||||||
| Logisitician, Senior | |||||||
| Equipment Specialist, Entry | |||||||
| Equipment Specialist, Mid-level | |||||||
| Equipment Specialist, Lead | |||||||
| Administrative Support | |||||||
| Analysts, Entry | |||||||
| Analysts, Mid-level |
&LSubcontractor 6 Loaded Labor Rates&CRFP FA8504-09-R-22495&RPricing Matrix, Attachment 4 &R Page &P of &N
File details come from the government source that posted it. Updated .