FA850409R22495-02.pdf
PDF 296 KB Posted
- Attached to
- Administrative Management and General Management Consulting Services Federal contract opportunity
- Solicitation number
- FA8504-09-R-22495
About this file
Amendment -02. Response date remains unchanged. Changes are limited to Section M and are highlighted in yellow.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA850409R22495-01.pdf | ||
| RFP 8504-09-R-22495 RFI and Questions.doc | DOC document | |
| DD Form 1423.doc | DOC document | |
| Order 0001.doc | DOC document | |
| Appendix C.doc | DOC document | |
| FACTS Sheet.doc | DOC document | |
| FA850409R22495.doc | DOC document | |
| Transmittal Letter.doc | DOC document | |
| PP Questionnaire.doc | DOC document | |
| PWS | — | |
| Pricing Matrix.xls | XLS spreadsheet | |
| Subcontractor Consent Form.doc | DOC document | |
| Past Performance Questionnaire Tracking Record.doc | DOC document | |
| Client Authorization Letter.doc | DOC document | |
| DD Form 254.pdf | ||
| Wage Determination.pdf | ||
| PWS | — |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1447-101 STANDARD FORM 1447 (5-88)
Prescribed by GSA FAR (48 CFR 53.215-1(g))
6.SOLICITATION ISSUE DATE
8. THIS ACQUISITION IS
UNRESTRICTED LABOR SURPLUS AREA CONCERNS
SET ASIDE: % FOR COMBINED SMALL BUSINESS &
LABOR SURPLUS AREA CONCERNS
SMALL BUSINESS 8(a) Competitive
NAICS CODE: 541611 SIZE STANDARD: $7.0
DATE SIGNED
28. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER
SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH
ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
ROUTINE
RESTRICTED UNDER THE PROVISIONS OF SECTION 8(a) OF THE SMALL BUSINESS
ACT
Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.
The ceiling amount of $30,000,000 reflects the basic ordering period and all option periods. The guaranteed minimum is $10,000 for the life of the contract.
Changes from amendment -01 are limited to Section M and are highlighted in yellow. The response date remains unchanged.
SEE LINE ITEM SCHEDULE
22.
AMOUNT
16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253
FULL AND OPEN COMPETITION (c) ( ) (c) ( )
DATE SIGNED
27. SIGNATURE OF OFFEROR/CONTRACTOR
20.
UNIT 21.
UNIT PRICE 19.
QUANTITY
13. CONTRACTOR OFFEROR CODE FACILITY CODE
11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR
DAYS UNLESS OFFEROR INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLK 9
ABOVE, THE CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS
SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS AND
CONDITIONS STATED HEREIN. *
RATING
DO: A1
3. AWARD/EFFECTIVE DATE
FA8504
2. CONTRACT NO.
D
CHECK IF REMITTANCE IS DIFFERENT
AND PUT SUCH ADDRESS IN OFFER
17.
ITEM NO.
12. ADMINISTERED BY CODE
SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14
SCD:C
NAME AND TITLE OF SIGNER (TYPE OR PRINT)
NAME OF CONTRACTING OFFICER
24. AWARD AMOUNT (FOR GOVT USE ONLY)
23. ACCOUNTING AND APPROPRIATION DATA
SEE SCHEDULE
4. SOLICITATION NUMBER
FA8504-09-R-22495-02
5. SOLICITATION TYPE
SEALED BIDS NEGOTIATED
(IFB) (RFP)
15. PROMPT PAY DISCOUNT
25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH
OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT
THE TERMS AND CONDITIONS SPECIFIED HEREIN.
10. ITEMS TO BE PURCHASED (BRIEF DESCRIPTION)
SUPPLIES SERVICES Administrative Management and General Management Consulting Services
9.
Offers will be received at the issuing office until the date and time specified below. Late offers are subject to late proposal provisions incorporated herein. All offers are subject to provisions, representations, certifications, and specifications as are attached or incorporated by reference.
20-MAY-2009 4:00PM
18.
SCHEDULE OF SUPPLIES/SERVICES
14. PAYMENT WILL BE MADE BY CODE
X
X
7. ISSUED BY CODE
330 ACSG/GFKA, CML PHN: (478) 926-6684
235 BYRON ST SUITE 19A
ROBINS AFB GA 31098-1670
BUYER: Robert N. Jones, Jr./GFKA Robert.Jones3@robins.af.mil Phone: (478) 926-7204 Fax: (478) 926-6578 No Collect Calls
X
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 350)
SOLICITATION/CONTRACT
BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.
JSY
SF 1447 (5-88) BACK
NO RESPONSE FOR THE REASONS CHECKED
TYPE OR PRINT NAME AND TITLE OF SIGNER
SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)
WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF
ITEMS INVOLVED
WE DO
OTHER (Specify)
CANNOT COMPLY WITH SPECIFICATIONS
CANNOT COMPLY WITH SPECIFICATIONS
CANNOT MEET DELIVERY REQUIREMENT
FOLD FOLD
FOLD FOLD
SOLICITATION NO. FA850409R22495
DUE: 20 MAY 2009 4:00 PM
FROM: AFFIX
STAMP
HERE
TO:
ATTN: ROBERT N JONES, JR../GFKA
330 ACSG/GFKA, CML PHN: (478) 926-6684
235 BYRON ST SUITE 19A
ROBINS AFB GA 31098-1670
Request for Proposal FA8504-09-R-22495-02
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
Note 1: The proposed contracting action is to establish a single awardee, Indefinite-Delivery, Indefinite Quantity (ID/IQ) contract. The resultant contract will have a ceiling of $30,000,000. The guaranteed minimum is $10,000 for the life of the contract.
Note 2: The Contract Line Items identified below have an established ordering period as defined in the Schedule. Orders may be placed at any time during an effective ordering period. The period of performance, typically less than one year, for specific tasks will be included in the individual Request for Order Proposal (RFOP). Individual tasks may cross calendar years and the awardee will bill at the appropriate calendar year rates in the resultant contract.
Note 3: The labor categories included in the “Pricing Matrix” (Attachment #4) are individually defined within the Performance-Based Work Statement (PWS), Appendix B. A general description of the tasks to be performed is outlined in sections 4.10.1 through 4.10.5 of the PWS.
Note 4: Pricing information is not to be proposed at the Contract Line Item Number (CLIN) level.
Attachment #4 will be utilized by the Government to determine the Estimated Price of each CLIN based on past workload levels. Contractor Acquired Parts (CAP), Other Direct Costs (ODC) and Travel, as well as associated “add on” rates, are not deemed to be significant and will be addressed and evaluated at the order level and not included in the evaluation at the contract level.
Basic Ordering Period: The estimated dates for the basic ordering period are 1 July 2009 through 30 June 2010.
ON-SITE MANPOWER SUPPORT SERVICES
Item No.
Time & Material Estimated
Quantity U/I Estimated Amount Estimated Price
1 LO
Manpower Support Services in accordance with Performance-Based Work Statement (PWS) Section 4.10. Rates to be utilized are outlined by labor category in the "Pricing Matrix" (Attachment #4).
Purchase Request(s) PR Line Item(s)
FD20600922495 0001
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Standard Inspection
OFF-SITE MANPOWER SUPPORT SERVICES
Quantity
Manpower Support Services in accordance with Performance-Based Work Statement (PWS) Section 4.10. Rates to
FD20600922495 0001
Firm Fixed Price Quantity U/I Estimated Amount Estimated Price
Manpower Support Services in accordance with Performance-Based Work Statement (PWS) Section 4.10. Rates to
FD20600922495 0005
Manpower Support Services in accordance with Performance-Based Work Statement (PWS) Section 4.10. Rates to
FD20600922495 0005
TRAVEL
Cost Reimbursement - No Fee Quantity U/I Estimated Cost Total Estimated Cost
Travel necessary to support the requirements outlined in the Performance-Based Work Statement (PWS). Travel is subject to the provisions outlined in Section 4.5 of the PWS.
FD20600922495 0003
CONTRACTOR ACQUIRED PARTS (CAP)
Contractor Acquired Parts (CAP), materials and subcontracts necessary to support the requirements outlined in the
Performance-Based Work Statement (PWS). All acquisitions are subject to the provisions outlined in Section 4.9 of the PWS.
FD20600922495 0006
DATA
Quantity U/I Unit Price Amount
MONTHLY STATUS REPORT
ELIN A001
FD20600922495 0004
Inspection/Acceptance Report: IAW DD Form 1423-1
Exhibit: A
OTHER DIRECT COSTS
All acquisitions are subject to the provisions outlined in Section 4.9.1 of the Performance-Based Work Statement
(PWS).
FD20600922495 0002
Annual Option I: The estimated dates for this ordering period are 1 July 2010 through 30 June 2011. This option can be exercised in accordance with FAR Clause 52.217-9. An option is deemed to be exercised when deposited in the mail or upon electronic transmission.
Quantity
Manpower Support Services in accordance with Performance-Based Work Statement (PWS) Section 4.10. Rates to
Quantity
Manpower Support Services in accordance with Performance-Based Work Statement (PWS) Section 4.10. Rates to
Manpower Support Services in accordance with Performance-Based Work Statement (PWS) Section 4.10. Rates to
Manpower Support Services in accordance with Performance-Based Work Statement (PWS) Section 4.10. Rates to
Travel necessary to support the requirements outlined in the Performance-Based Work Statement (PWS). Travel is
Contractor Acquired Parts (CAP), materials and subcontracts necessary to support the requirements outlined in the
Performance-Based Work Statement (PWS). All acquisitions are subject to the provisions outlined in Section 4.9 of the PWS.
Inspection/Acceptance Report: IAW DD Form 1423-1
All acquisitions are subject to the provisions outlined in Section 4.9.1 of the Performance-Based Work Statement
Annual Option II: The estimated dates for this ordering period are 1 July 2011 through 30 June 2012. This option can be exercised in accordance with FAR Clause 52.217-9. An option is
Quantity
Manpower Support Services in accordance with Performance-Based Work Statement (PWS) Section 4.10. Rates to
Quantity
Manpower Support Services in accordance with Performance-Based Work Statement (PWS) Section 4.10. Rates to
Manpower Support Services in accordance with Performance-Based Work Statement (PWS) Section 4.10. Rates to
Manpower Support Services in accordance with Performance-Based Work Statement (PWS) Section 4.10. Rates to
Travel necessary to support the requirements outlined in the Performance-Based Work Statement (PWS). Travel is
Contractor Acquired Parts (CAP), materials and subcontracts necessary to support the requirements outlined in the
Performance-Based Work Statement (PWS). All acquisitions are subject to the provisions outlined in Section 4.9 of
Inspection/Acceptance Report: IAW DD Form 1423-1
All acquisitions are subject to the provisions outlined in Section 4.9.1 of the Performance-Based Work Statement
Annual Option III: The estimated dates for this ordering period are 1 July 2012 through 30 June 2013. This option can be exercised in accordance with FAR Clause 52.217-9. An option is
Quantity
Manpower Support Services in accordance with Performance-Based Work Statement (PWS) Section 4.10. Rates to
Quantity
Manpower Support Services in accordance with Performance-Based Work Statement (PWS) Section 4.10. Rates to
Manpower Support Services in accordance with Performance-Based Work Statement (PWS) Section 4.10. Rates to
Manpower Support Services in accordance with Performance-Based Work Statement (PWS) Section 4.10. Rates to
Travel necessary to support the requirements outlined in the Performance-Based Work Statement (PWS). Travel is
Contractor Acquired Parts (CAP), materials and subcontracts necessary to support the requirements outlined in the
Performance-Based Work Statement (PWS). All acquisitions are subject to the provisions outlined in Section 4.9 of
Inspection/Acceptance Report: IAW DD Form 1423-1
All acquisitions are subject to the provisions outlined in Section 4.9.1 of the Performance-Based Work Statement
Annual Option IV: The estimated dates for this ordering period are 1 July 2013 through 30 June 2014. This option can be exercised in accordance with FAR Clause 52.217-9. An option is
Quantity
Manpower Support Services in accordance with Performance-Based Work Statement (PWS) Section 4.10. Rates to
Quantity
Manpower Support Services in accordance with Performance-Based Work Statement (PWS) Section 4.10. Rates to
Manpower Support Services in accordance with Performance-Based Work Statement (PWS) Section 4.10. Rates to
Manpower Support Services in accordance with Performance-Based Work Statement (PWS) Section 4.10. Rates to
Travel necessary to support the requirements outlined in the Performance-Based Work Statement (PWS). Travel is
Contractor Acquired Parts (CAP), materials and subcontracts necessary to support the requirements outlined in the
Performance-Based Work Statement (PWS). All acquisitions are subject to the provisions outlined in Section 4.9 of
Inspection/Acceptance Report: IAW DD Form 1423-1
All acquisitions are subject to the provisions outlined in Section 4.9.1 of the Performance-Based Work Statement
PART I - THE SCHEDULE
SECTION C
DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C-205
252.211-7005 SUBSTITUTIONS FOR MILITARY OR FEDERAL SPECIFICATIONS AND STANDARDS
(NOV 2005)
(IAW DFARS 211.273-4)
(b) Offerors are encouraged to propose SPI processes in lieu of military or Federal specifications and standards cited in the solicitation. A listing of SPI processes accepted at specific facilities is available via the Internet at http://guidebook.dcma.mil/20/guidebook_process.htm (paragraph 4.2).
(d) (Offeror insert information for each SPI process)
SPI Process: _____________________________________________________
Facility: _________________________________________________________
Military or Federal Specification or Standard: ____________________________
Affected Contract Line Item Number, Subline Item Number, Component, or Element:
(Applicable when procuring previously developed items that exceed the micro-purchase threshold)
Performance-Based Work Statement (PWS)
SECTION D
PACKAGING AND MARKING
WOODEN LUMBER, WOODEN PALLET AND PACKAGING/CONTAINER STATEMENT (FEB 2007)
(IAW AFMC FORM 158)
All wooden lumber, wooden pallets, and wooden containers produced entirely or in part of solid wood packing material (SWPM) shall be constructed from heat-treated (HT) material (HT 56 degrees centigrade or 133 degrees Fahrenheit for 30 minutes). Certification/marking is required by an accredited agency recognized by the American Lumber Standards Committee (ALSC). For reference documentation, see “International Standards for Phytosanitary Measures (ISPM) No. 15.” This document can be found at www.ippc.int .
(Applicable to solicitations and contracts with line items for deliverables)
SECTION E
INSPECTION AND ACCEPTANCE
E-1D
52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)
(IAW FAR 46.302)
(Applicable for supplies, services furnishing of supplies, fixed-price and exceeds the simplified acquisition threshold)
E-4
52.246-3 INSPECTION OF SUPPLIES--COST-REIMBURSEMENT (MAY 2001)
(IAW FAR 46.303)
(Applicable for cost-reimbursement supplies or services furnishing supplies)
E-5
52.246-4 INSPECTION OF SERVICES--FIXED-PRICE (AUG 1996)
(IAW FAR 46.304)
(Applicable for fixed-price services, or supplies furnishing services over the simplified acquisition threshold)
E-6
52.246-5 INSPECTION OF SERVICES--COST-REIMBURSEMENT (APR 1984)
(IAW FAR 46.305)
(Applicable for cost-reimbursement services, or supplies furnishing services)
E-7
52.246-6 INSPECTION--TIME-AND-MATERIAL AND LABOR-HOUR (MAY 2001)
(IAW FAR 46.306)
(Applicable to time-and-material or labor-hour)
E-22
52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)
(IAW FAR 46.316)
(Applicable to the furnishing of supplies, services involving the furnishing of supplies, or research and development, when a fixed-price contract is contemplated and the contract amount is expected to exceed the simplified acquisition threshold)
E-240
252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2008)
(IAW DFARS 246.370)
(Applicable for deliverable supplies or hardware)
E-42
INSPECTION AND ACCEPTANCE (SEP 1999)
(IAW FAR 46.401(b), FAR 46.503) (Applicable to all orders issued hereunder)
Government Contract Quality Assurance Inspection and Acceptance will be at destination(s) specified herein (Final).
560 ACSS/GFLB, Robins Air Force Base
(The above Clause/Provision has been modified.)
SECTION F
DELIVERIES OR PERFORMANCE
F-26
52.242-15 STOP-WORK ORDER (AUG 1989)
(IAW FAR 42.1305(b)(1)) (Applicable for supplies, services, or research and development)
F-27
52.242-15 STOP-WORK ORDER -- ALTERNATE I (APR 1984)
(IAW FAR 42.1305(b)(2)) (Applicable for Cost-reimbursement line items)
SECTION H
SPECIAL CONTRACT REQUIREMENTS
H 900. UTILIZATION OF JOINT VENTURES
Joint ventures are allowed; however, the joint venture agreement must be received by SBA prior to proposal due date and approved before award of any resulting contract. If you are contemplating a joint venture in this project, you must advise your assigned SBA Business Development Specialist (BDS) as soon as possible. It is also recommended that the agreement be submitted as soon as practicable to ensure compliance with established regulations and guidelines. Any corrections and/or changes can be made only when your BDS has adequate time for a thorough review before the proposal due date. No corrections and/or changes are allowed after time of submission of proposal or bids.
PART II - CONTRACT CLAUSES
SECTION I
CONTRACT CLAUSES
IB-300
5352.201-9101 OMBUDSMAN (AUG 2005)
(IAW AFFARS 5301.9103)
(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the party to another official who can resolve the concern.
(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).
(c) If resolution cannot be made by the contracting officer, concerned parties may contact the Center/MAJCOM ombudsmen, CRYSTAL HOLLIFIELD at (478) 222-1089, FAX (478) 222-1121, email at CRYSTAL.HOLLIFIELD@ROBINS.AF.MIL. Concerns, issues, disagreements, and recommendations that cannot be resolved at the MAJCOM/DRU level, may be brought by the concerned party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (703) 588-7004, facsimile number (703) 588-1067.
(d) The ombudsman has no authority to render a decision that binds the agency.
(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the Contracting Officer.
(The above Clause/Provision has been modified.)
(Applicable to all solicitations and contracts)
I-11
52.202-1 DEFINITIONS (JUL 2004)
(IAW FAR 2.201)
(Applicable when the simplified acquisition threshold is exceeded)
I-19
52.203-3 GRATUITIES (APR 1984)
(IAW FAR 3.202)
(Applicable when simplified acquisition threshold is exceeded, except for personal services and those between military departments or defense agencies and foreign governments that do not obligate any funds appropriated to the Department of Defense)
I-20
52.203-5 COVENANT AGAINST CONTINGENT FEES (APR 1984)
(IAW FAR 3.404)
(Applicable when simplified acquisition threshold is exceeded other than those for commercial items (see Parts 2 and 12))
I-21
52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)
(IAW FAR 3.503-2)
(Applicable when the simplified acquisition threshold is exceeded)
I-22
52.203-7 ANTI-KICKBACK PROCEDURES (JUL 1995)
(IAW FAR 3.502-3)
(Applicable when the simplified acquisition threshold is exceeded)
I-23
52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR
IMPROPER ACTIVITY (JAN 1997)
(IAW FAR 3.104-9(a))
(Applicable when noncommercial and the simplified acquisition threshold is exceeded)
I-25
52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (JAN 1997)
(IAW FAR 3.104-9(b)) (Applicable when the simplified acquisition threshold is exceeded)
I-25C
52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS
(SEP 2007)
(IAW FAR 3.808(b))
(Applicable over $100,000)
I-25E
52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (DEC 2008)
(IAW FAR 3.1004(a)) (Applicable to solicitations and contracts exceeding $5,000,000 and the period of performance is greater than 120 days, unless for the acquisition of a commercial item under Part 12 or performed entirely outside the U.S.)
I-25F
52.203-14 DISPLAY OF HOTLINE POSTER(S) (DEC 2007)
(IAW FAR 3.1004(b), DFARS 201.1004(b)(2)(ii))
(3) Any required posters may be obtained as follows:
Poster(s) Obtain from ------------------ [For DoD:] DoD Inspector General, ------------------ ATTN: Defense Hotline, ------------------ 400 Army Navy Drive ------------------ Washington, DC 22202-2884
(Applicable when the contract exceeds $5,000,000 or agency-established amount, and the agency has a fraud hotline poster or the contract is funded with disaster assistance funds, unless for a commercial item under Part 12 or performed entirely outside the U.S.)
IA-21D
252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS
(JAN 2009)
(IAW DFARS 203.171-4)
(Applicable to all solicitations and contracts)
IA-22
252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER DEFENSE-
CONTRACT-RELATED FELONIES (DEC 2008)
(IAW DFARS 203.570-3)
(Applicable when exceeding the simplified acquisition threshold (except for commercial items))
IA-24D
252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS
(JAN 2009)
(IAW DFARS 203.970)
(Applicable to all solicitations and contracts)
I-27
52.204-2 SECURITY REQUIREMENTS (AUG 1996)
(IAW FAR 4.404(a)) (Applicable when access to classified information may be required)
I-39
52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON RECYCLED PAPER (AUG 2000)
(IAW FAR 4.303)
(Applicable when the simplified acquisition threshold is exceeded)
I-41
52.204-7 CENTRAL CONTRACTOR REGISTRATION (APR 2008)
(IAW FAR 4.1104)
(Applicable to solicitations and contracts except as provided in 4.1102(a))
IA-33
252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)
(IAW DFARS 204.404-70(b)) (Applicable to all orders issued hereunder)
IA-34C
252.204-7004 ALTERNATE A, CENTRAL CONTRACTOR REGISTRATION (SEP 2007)
(IAW DFARS 204.1104)
(Applicable when using the clause at FAR 52.204-7, Central Contractor Registration)
IA-35C
252.204-7005 ORAL ATTESTATION OF SECURITY RESPONSIBILITIES (NOV 2001)
(IAW DFARS 204.404-70(c)) (Applicable when clause FAR 52.204-2, Security Requirements, is included)
IA-40
252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS
(DEC 1991)
(IAW DFARS 205.470)
(Applicable over $1,000,000)
I-78
52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH
CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT
(SEP 2006)
(IAW FAR 9.409)
(Applicable when exceeding $30,000)
IA-92
252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE
GOVERNMENT OF A TERRORIST COUNTRY (DEC 2006)
(IAW DFARS 209.409)
(Applicable at $100,000 or more)
IB-411C
5352.209-9002 ORGANIZATIONAL CONFLICT OF INTEREST (AFMC) (AUG 2002)
(IAW AFMCFARS 5309.507-2(a))
(a) The following restrictions and definitions apply to prevent conflicting roles which may bias the Contractor's judgment or objectivity, or to preclude the Contractor from obtaining an unfair competitive advantage in concurrent or future acquisitions.
(1) Descriptions or definitions:
"Contractor" means the business entity receiving the award of this contract, its parents, affiliates, divisions and subsidiaries.
"Development" means all efforts towards solution of broadly-defined problems. This may encompass research, evaluating technical feasibility, proof of design and test, or engineering of programs not yet approved for acquisition or operation.
"Proprietary Information" means all information designated as proprietary in accordance with law and regulation, and held in confidence or disclosed under restriction to prevent uncontrolled distribution.
Examples include limited or restricted data, trade secrets, sensitive financial information, and computer software; and may appear in cost and pricing data or involve classified information.
"System" means the system that is the subject of this contract.
"System Life" means all phases of the system's development, production, or support.
"Systems Engineering" means preparing specifications, identifying and resolving interface problems, developing test requirements, evaluating test data, and supervising design.
"Technical Direction" means developing work statements, determining parameters, directing other Contractors' operations, or resolving technical controversies.
(2) Restrictions: The Contractor shall perform systems engineering and/or technical direction, but will not have overall contractual responsibility for the system's development, integration, assembly and checkout, or production. The parties recognize that the Contractor shall occupy a highly influential and responsible position in determining the system's basic concepts and supervising their execution by other Contractors.
The Contractor's judgment and recommendations must be objective, impartial, and independent. To avoid the prospect of the Contractor's judgment or recommendations being influenced by its own products or capabilities, it is agreed that the Contractor is precluded for the life of the system from award of a DoD contract to supply the system or any of its major components, and from acting as a subcontractor or consultant to a DoD supplier for the system or any of its major components.
(Applicable when the contractor will be providing systems engineering and/or technical direction)
(Applicable when the contractor will be preparing specifications or work statements)
IB-411E
5352.209-9002 ORGANIZATIONAL CONFLICT OF INTEREST -- ALTERNATE II (AFMC) (AUG 2002)
(IAW AFMCFARS 5309.507-2(a)(3)) As prescribed in 5309.507-2(a)(3), either substitute paragraph (a)(2) of the basic clause with the following paragraph, or add the following in addition to the basic restriction. Renumber the paragraphs as needed if more than one restriction applies. Use this paragraph, substantially as written.
(a)(2) The Contractor shall participate in the technical evaluation of other Contractors' proposals or products. To ensure objectivity, the Contractor is precluded from award of any supply or service contract or subcontract for the system or its major components. This restriction shall be effective for the duration of the subject contract plus two years. This does not apply to other technical evaluations concerning the system.
(The above Clause/Provision has been modified.)
(Applicable when the contractor will be providing technical evaluation or advisory and assistance services)
IB-411F
5352.209-9002 ORGANIZATIONAL CONFLICT OF INTEREST -- ALTERNATE III (AFMC) (AUG 2002)
(IAW AFMCFARS 5309.507-2(a)(4)) (Applicable when the contractor will be obtaining access to proprietary information)
IB-411G
5352.209-9002 ORGANIZATIONAL CONFLICT OF INTEREST -- ALTERNATE IV (AFMC) (AUG 2002)
(IAW AFMCFARS 5309.507-2(a)(5)) (Applicable when the contract is a task ordering contract and when more than one system is supported)
IB-411J
5352.209-9002 ORGANIZATIONAL CONFLICT OF INTEREST -- ALTERNATE VI (AFMC) (AUG 2002)
(IAW AFMCFARS 5309.507-2(a)(7)) (Applicable when it is necessary to have the restrictions of this clause included in all or some subcontracts, teaming arrangements and other agreements calling for performance of work related to the contract)
I-83
52.211-5 MATERIAL REQUIREMENTS (AUG 2000)
(IAW FAR 11.304)
(Applicable to supplies that are not commercial items)
I-102
52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008)
(IAW FAR 11.604(b)) This is a rated order certified for national defense , emergency preparedness, and energy program use, and the Contractor shall follow all the requirements of the Defense Priorities and Allocations System regulation (15 CFR 700).
(Applicable to all rated orders)
IA-103
252.211-7003 ITEM IDENTIFICATION AND VALUATION (AUG 2008)
(IAW DFARS 211.274-5(a), DFARS 212.301(f)(vi))
(a) Definitions. As used in this clause—
“DoD recognized unique identification equivalent” means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at http://www.acq.osd.mil/dpap/pdi/uid/iuid/equivalents.html .
“Unique item identifier type” means a designator to indicate which method of uniquely identifying a part has been used. The current list of accepted unique item identifier types is maintained at http://www.acq.osd.mil/dpap/pdi/uid/uii_types.html .
(c) Unique item identifier.
(1) The Contractor shall provide a unique item identifier for the following:
(i) All delivered items for which the Government’s unit acquisition cost is $5,000 or more.
(ii) The following items for which the Government’s unit acquisition cost is less than $5,000:
Contract Line, Subline, or Exhibit Line Item Number
Item Description
*Items less than $5000, which require UID, will be specifically identified in the schedule.
See Schedule as Applicable
(iii) Subassemblies, components, and parts embedded within delivered items as specified in Attachment Number (See Schedule as Applicable).
(f) The Contractor shall submit the information required by paragraphs (d) and (e) of this clause in accordance with the data submission procedures at http://www.acq.osd.mil/dpap/pdi/uid/data_submission_information.html .
(Applicable when delivery of one or more “items” as defined at 252.211-7003(c) is required)
IA-118K
252.211-7007 REPORTING OF GOVERNMENT-FURNISHED EQUIPMENT IN THE ITEM UNIQUE
IDENTIFICATION (IUID) REGISTRY (NOV 2008)
(IAW DFARS 211.274-5(b))
(Applicable when FAR 52.245-1, Government Property, or FAR 52.245-2, Government Property Installation Operation Services, is used)
I-128
52.215-2 AUDIT AND RECORDS--NEGOTIATION (MAR 2009)
(IAW FAR 15.209(b)(1)) (Applicable if negotiated and above the simplified acquisition threshold, except commercial items and utility services at public prices plus reasonable connection charge)
I-129G
52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)
(IAW FAR 15.209(h)) (Applicable to all orders issued hereunder)
I-153
52.216-7 ALLOWABLE COST AND PAYMENT (DEC 2002)
(IAW FAR 16.307(a))
(a) Invoicing.
(1) The Government shall make payments to the Contractor when requested as work progresses, but (except for small business concerns) not more often than once every 2 weeks, in amounts determined to be allowable by the Contracting Officer in accordance with Federal Acquisition Regulation (FAR) Subpart 31.2 in effect on the date of this contract and the terms of this contract. The Contractor may submit to an authorized representative of the Contracting Officer, in such form and reasonable detail as the representative may require, an invoice or voucher supported by a statement of the claimed allowable cost for performing this contract.
(2) Contract financing payments are not subject to the interest penalty provisions of the Prompt Payment Act. Interim payments made prior to the final payment under the contract are contract financing payments, except interim payments if this contract contains Alternate I to the clause at 52.232-25.
(3) The designated payments office will make interim payments for contract financing on the 30th day after the designated billing office receives a proper payment request. In the event that the Government requires an audit or other review of a specific payment request to ensure compliance with the terms and conditions of the contract, the designated payment office is not compelled to make payment by the specified due date.
(b) Reimbursing costs.
(1) For the purpose of reimbursing allowable costs (except as provided in paragraph (b)(2) of this clause, with respect to pension, deferred profit sharing, and employee stock ownership plan contributions), the term "costs" includes only:
(i) Those recorded costs that, at the time of the request for reimbursement, the Contractor has paid by cash, check, or other form of actual payment for items or services purchased directly for the contract;
(ii) When the Contractor is not delinquent in paying costs of contract performance in the ordinary course of business, costs incurred, but not necessarily paid, for--
(A) Supplies and services purchased directly for the contract and associated financing payments to subcontractors, provided payments determined due will be made—
(1) In accordance with the terms and conditions of a subcontract or invoice; and
(2) Ordinarily within 30 days of the submission of the Contractor’s payment request to the Government;
(B) Materials issued from the Contractor's inventory and placed in the production process for use on the contract;
(C) Direct labor;
(D) Direct travel;
(E) Other direct in-house costs; and
(F) Properly allocable and allowable indirect costs, as shown in the records maintained by the Contractor for purposes of obtaining reimbursement under Government contracts; and
(iii) The amount of financing payments that have been paid by cash, check, or other forms of payment to subcontractors.
(2) Accrued costs of Contractor contributions under employee pension plans shall be excluded until actually paid unless—
(i) The Contractor’s practice is to make contributions to the retirement fund quarterly or more frequently; and
(ii) The contribution does not remain unpaid 30 days after the end of the applicable quarter or shorter payment period (any contribution remaining unpaid shall be excluded from the Contractor’s indirect costs for payment purposes.)
(3) Notwithstanding the audit and adjustment of invoices or vouchers under paragraph (g) of this clause, allowable indirect costs under this contract shall be obtained by applying indirect cost rates established in accordance with paragraph (d) of this clause.
(4) Any statements in specifications or other documents incorporated in this contract by reference designating performance of services or furnishing of materials at the Contractor's expense or at no cost to the Government shall be disregarded for purposes of cost-reimbursement under this clause.
(c) Small business concerns. A small business concern may receive more frequent payments than every 2 weeks.
(d) Final indirect cost rates.
(1) Final annual indirect cost rates and the appropriate bases shall be established in accordance with Subpart 42.7 of the Federal Acquisition Regulation (FAR) in effect for the period covered by the indirect cost rate proposal.
(2) The Contractor shall submit an adequate final indirect cost rate proposal to the Contracting Officer (or cognizant Federal agency official) and auditor within the 6-month period following the expiration of each of its fiscal years. The proposed rates shall be based on the Contractor's actual cost experience for that period.
The appropriate Government representative and Contractor shall establish the final indirect cost rates as promptly as practical after receipt of the Contractor's proposal.
(3) The Contractor and the appropriate Government representative shall execute a written understanding setting forth the final indirect cost rates. The understanding shall specify
(i) the agreed-upon final annual indirect cost rates,
(ii) the bases to which the rates apply,
(iii) the periods for which the rates apply,
(iv) any specific indirect cost items treated as direct costs in the settlement, and
(v) the affected contract and/or subcontract, identifying any with advance agreements or special terms and the applicable rates. The understanding shall not change any monetary ceiling, contract obligation, or specific cost allowance or disallowance provided for in this contract. The understanding is incorporated into this contract upon execution.
(4) Failure by the parties to agree on a final annual indirect cost rate shall be a dispute within the meaning of the Disputes clause.
(5) Within 120 days (or longer period if approved in writing by the Contracting Officer) after settlement of the final annual indirect cost rates for all years of a physically complete contract, the Contractor shall submit a completion invoice or voucher to reflect the settled amounts and rates.
(6)(i) If the Contractor fails to submit a completion invoice or voucher within the time specified in paragraph (d)(5) of this clause, the Contracting Officer may—
(A) Determine the amounts due to the Contractor under the contract; and
(B) Record this determination in a unilateral modification to the contract.
(ii) This determination constitutes the final decision of the Contracting Officer in accordance with the Disputes clause.
(e) Billing rates. Until final annual indirect cost rates are established for any period, the Government shall reimburse the Contractor at billing rates established by the Contracting Officer or by an authorized representative (the cognizant auditor), subject to adjustment when the final rates are established. These billing rates:
(1) Shall be the anticipated final rates; and
(2) May be prospectively or retroactively revised by mutual agreement, at either party's request, to prevent substantial overpayment or underpayment.
(f) Quick-close-out procedures. Quick-close-out procedures are applicable when the conditions in FAR 42.708(a) are satisfied.
(g) Audit. At any time or times before final payment, the Contracting Officer may have the Contractor's invoices or vouchers and statements of cost audited. Any payment may be (1) reduced by amounts found by the Contracting Officer not to constitute allowable costs or (2) adjusted for prior overpayments or underpayments.
(h) Final payment.
(1) Upon approval of a completion invoice or voucher submitted by the Contractor in accordance with paragraph (d)(5) of this clause, and upon the Contractor's compliance with all terms of this contract, the Government shall promptly pay any balance of allowable costs and that part of the fee (if any) not previously paid.
(2) The Contractor shall pay to the Government any refunds, rebates, credits, or other amounts (including interest, if any) accruing to or received by the Contractor or any assignee under this contract, to the extent that those amounts are properly allocable to costs for which the Contractor has been reimbursed by the Government. Reasonable expenses incurred by the Contractor for securing refunds, rebates, credits, or other amounts shall be allowable costs if approved by the Contracting Officer. Before final payment under this contract, the Contractor and each assignee whose assignment is in effect at the time of final payment shall execute and deliver:
(i) An assignment to the Government, in form and substance satisfactory to the Contracting Officer, of refunds, rebates, credits, or other amounts (including interest, if any) properly allocable to costs for which the Contractor has been reimbursed by the Government under this contract; and
(ii) A release discharging the Government, its officers, agents, and employees from all liabilities, obligations, and claims arising out of or under this contract, except--
(A) Specified claims stated in exact amounts, or in estimated amounts when the exact amounts are not known;
(B) Claims (including reasonable incidental expenses) based upon liabilities of the Contractor to third parties arising out of the performance of this contract; provided, that the claims are not known to the Contractor on the date of the execution of the release, and that the Contractor gives notice of the claims in writing to the Contracting Officer within 6 years following the release date or notice of final payment date, whichever is earlier; and
(C) Claims for reimbursement of costs, including reasonable incidental expenses, incurred by the Contractor under the patent clauses of this contract, excluding, however, any expenses arising from the Contractor's indemnification of the Government against patent liability.
(Applicable when specifying cost-reimbursement pricing arrangement)
I-158
52.216-11 COST CONTRACT--NO FEE (APR 1984)
(IAW FAR 16.307(e)(1)) (Applicable when specifying cost reimbursement providing no fee and not a cost-sharing contract)
I-170
52.216-18 ORDERING (OCT 1995)
(IAW FAR 16.506(a))
(a) Such orders may be issued from time-to-time within any effective ordering period..
(Applicable to all orders issued hereunder)
I-171
52.216-19 ORDER LIMITATIONS (OCT 1995)
(IAW FAR 16.506(b))
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $10,000.00, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor--
(1) Any order for a single item in excess of $5,000,000.00;
(2) Any order for a combination of items in excess of $6,000,000; or
(3) A series of orders from the same ordering office within 15 days that together call for quantities exceeding the limitation in subparagraph (b)(1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 10 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
(The above Clause/Provision has been modified.)
(Applicable to all orders issued hereunder)
I-178
52.216-22 INDEFINITE QUANTITY (OCT 1995)
(IAW FAR 16.506(e))
(d) Contractor shall not be required to make any deliveries under this contract after completion of the period of performance on the last remaining task order..
(Applicable to all orders issued hereunder)
IB-432C
5352.216-9004 AUTHORITY TO ISSUE ORDERS (AFMC) (OCT 2008)
(IAW AFMCFARS 5316.506(90))
Only Contracting Officers within the 330 ACSG are authorized to issue orders hereunder.
(The above Clause/Provision has been modified.)
I-194
52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
(IAW FAR 17.208(f)) The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within the effective dates of the individual task orders.
(The above Clause/Provision has been modified.)
(Applicable to all orders issued hereunder)
I-195
52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(IAW FAR 17.208(g))
(a) The Government may extend the term of this contract by written notice to the Contractor within any effective period of the contract; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 30 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed sixty months.
(The above Clause/Provision has been modified.)
(Applicable when the Government gives the contractor a preliminary written notice of its intent to extend the contract, or an extension of the contract includes an extension of the option, or a there is a specified limitation on the total duration of the contract)
I-214
52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (MAY 2004)
(IAW FAR 19.708(a)) (Applicable when exceeding the simplified acquisition threshold, except for personal service contracts or when performance is entirely outside of the United States and its outlying areas)
(Applicable over $550,000)
I-221
52.219-14 LIMITATIONS ON SUBCONTRACTING (DEC 1996)
(IAW FAR 19.508(e), FAR 19.811-3(e)) (Applicable over $100,000)
I-225 52.219-18 NOTIFICATION OF COMPETITION LIMITED TO ELIGIBLE 8(a) CONCERNS
(JUN 2003)
(IAW FAR 19.811-3(d), DFARS 219.811-3(2))
(d)(2) The will notify the 330 ACSG/GFKA Contracting Officer in writing immediately upon entering an agreement (either oral or written) to transfer all or part of its stock or other ownership interest to any other party.
(Applicable to all orders issued hereunder)
I-225N
52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUN 2007)
(IAW FAR 19.308(d))
(g) If the Contractor does not have representations and certifications in ORCA, or does not have a representation in ORCA for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:
The Contractor represents that it [ ] is, [ ] is not a small business concern under NAICS Code _____________ assigned to contract number ______________________________.
[Contractor to sign and date and insert authorized signer's name and title].
(Applicable in solicitations and contracts exceeding the micro-purchase threshold when the contract will be performed in the United States or its outlying areas)
(Applicable over $500,000)
IA-243F
252.219-7009 SECTION 8(a) DIRECT AWARD (MAR 2002)
(IAW DFARS 219.811-3(1))
(a) The cognizant SBA district office is:
SB0405
SBA Georgia District Office 233 Peachtree Street, NE, Suite 1900 Atlanta , GA 30303 -www.sba.gov/ga/index.html
(Applicable to all orders issued hereunder)
IA-243J
252.219-7010 ALTERNATE A (Alternate A to FAR Clause 52.219-18 Notification of Competition
Limited to Eligible 8(a) Concerns) (JUN 1998)
(IAW DFARS 219.811-3(2))
(Applicable to all orders issued hereunder)
(Applicable to any priced order or definitization of an unpriced order over $500,000. Blanks shall be completed in the individual order)
IB-447
5352.219-9001 USE OF JOINT VENTURES IN MEETING THE LIMITATIONS ON SUBCONTRACTING
REQIREMENT (AFMC) (NOV 2007)
(IAW AFMCFARS 5319.508(e))
(Applicable over $100,000)
I-245
52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)
(IAW FAR 22.103-5(a)) (IAW FAR 22.101-1(e), Applicable when the head of the contracting activity designates programs or requirements for which it is necessary that contractors be required to notify the Government of actual or potential labor disputes that are delaying or threaten to delay the timely contract performance (see 22.103-5(a)).
(Applicable to orders over $100,000 unless for operation of vessels - Blank shall be completed on the individual order)
I-263
52.222-20 WALSH-HEALEY PUBLIC CONTRACTS ACT (DEC 1996)
(IAW FAR 22.610)
(Applicable to all orders issued hereunder)
I-263E
52.222-21 PROHIBITION OF SEGREGATED FACILITIES (FEB 1999)
(IAW FAR 22.810(a)(1)) (Applicable when exceeding $10,000, except those exempted by FAR 22.807 (b) which includes those for work to be performed outside the U.S. by employees who were not recruited within the U.S.)
I-264
52.222-26 EQUAL OPPORTUNITY (MAR 2007)
(IAW FAR 22.810(e)) (Applicable to all orders issued hereunder)
I-274
52.222-35 EQUAL OPPORTUNITY FOR SPECIAL DISABLED VETERANS, VETERANS OF THE
VIETNAM ERA, AND OTHER ELIGIBLE VETERANS (SEP 2006)
(IAW FAR 22.1310(a)(1), DFARS 222.1310(a)(1))
(Applicable when the expected value is $100,000 or more except when work is performed outside the United States by employees recruited outside the United States or the Deputy Assistant Secretary of Labor has waived, in accordance with 22.1305(a) or the head of the agency has waived, in accordance with 22.1305(b) all of the terms of the clause)
I-276
52.222-36 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES (JUN 1998)
(IAW FAR 22.1408(a)) (Applicable over $10,000 except when performance of work and recruitment of workers will occur outside the United States, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, and Wake Island, or the agency head has waived, in accordance with 22.1403(a) or 22.1403(b) all the terms of the clause)
I-278
52.222-37 EMPLOYMENT REPORTS ON SPECIAL DISABLED VETERANS, VETERANS OF THE
VIETNAM ERA, AND OTHER ELIGIBLE VETERANS (SEP 2006)
(IAW FAR 22.1310(b))
(Applicable when the expected value is $100,000 or more and workers were recruited within the United States)
I-279
52.222-39 NOTIFICATION OF EMPLOYEE RIGHTS CONCERNING PAYMENT OF UNION DUES
OR FEES (DEC 2004)
(IAW FAR 22.1605)
(Applicable to solicitations and contracts except those that do not exceed the simplified acquisition threshold or are covered by an exemption granted by the Secretary of Labor)
I-283
52.222-41 SERVICE CONTRACT ACT OF 1965 (NOV 2007)
(IAW FAR 22.1006(a)) (Applicable to services over $2,500)
I-284
52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 1989)
(IAW FAR 22.1006(b)) In compliance with the Service Contract Act of 1965, as amended, and the regulations of the Secretary of Labor (29 CFR Part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C. 5341 or 5332.
This Statement is for Information Only:
It is not a Wage Determination
Employee Class Monetary Wage Fringe Benefits Aircraft Structural Engineer, GS- 0830-11
$27.03 1) Contributions of 5.1% of basic hourly rate for health insurance.
Aircraft Structural Engineer, GS- 0830-12
$32.40 2) Contribution so 7% of basic hourly rate for retirement.
Aircraft Structural Engineer, GS- 0830-13
$38.53 3) 10 paid holidays per year.
General Engineer, GS-0801-11 $27.03 4) Paid annual leave (vacation) of General Engineer, GS-0801-12 $32.40 two hours each week for General Engineer, GS-0801-13 $38.53 employees with less than three Electrical Engineer, GS-0850-11 $27.03 years of service; three hours each Electrical…