Solicitation_Q A.docx

DOCX document 18 KB Posted

Attached to
Rivet MILE Trailers Federal contract opportunity
Solicitation number
FA8224-15-R-0056
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Answers to questions

View the file

Other files for this federal contract opportunity

Other files attached to Rivet MILE Trailers, newest first.
File Type Posted
FA8224-15-R-0056-02.doc DOC document
Purchase_Spec_-_20150603_(Final_Revised).docx DOCX document
FA8224-15-R-0056-01.pdf PDF
Spare_Tire_Storage.jpeg JPEG file
Solicitation_Q A_-_(2).docx DOCX document
Purchase_Spec_-_20150603_(Final).docx DOCX document
FA8224-15-R-0056.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation FA8224-15-R-0056 Answers to Questions

1. Q- What is the required length of the trailers?

A- 50 Feet minimum.

2. Q-Aluminum Diamond plate floor- should the floor be bright finished (metal exposed) orshould it be painted?
A-Aluminum diamond plating does not need to be painted.
3. Q-Aluminum Diamond plate floor - is it acceptable to install the diamond
plate over standard wood flooring (in such a manner as to seal the new floor
surface from the structural flooring below), or should the diamond plate be
installed in lieu of the structural wood flooring? The factory floor will
offer heavier duty use for payload handling due to its design to support
fork lift loading.

A- Diamond plate installed over an existing wood floor

4. Q-Should the upper area above the king pin be walled off to separate from the rear work
space?

A- Walls for the upper deck are not a requirement.

5. Q-Wall material is desired for the interior wall surfaces? For hose down
capability we would recommend either Fiber Reinforced Plastic or light gage
metal sheet.

A- Would prefer the plastic

6. Q-Will heating and/or cooling units be required? If a future option, we
can have the nose framing customized to take a Bard wall pack unit that
could be procured and installed by the government at a future date.

A- The requirement for heating/cooling units was intentionally left our of the specs.

7. Q-The solicitation document states 60 day ADC for delivery. The purchase
spec document indicates that the vendor has 45 days to submit drawings
followed by 14 day government review. What is the desired delivery date for
the units?

A- Delivery will be 180 days ARO. Solicitation will be amended. Drawings and review periods will remain as stated in Purchase Specification.

8. Q-Will it be possible to split the CLIN's such that each base delivery
will constitute a billable entity? i.e., CLIN 1 for 3 units to Minot, CLIN 2 for 3 units to FEWarren, CLIN 3 for 3 units to Malmstrom?

A- Yes. We can structure the award that way, or include subclins on CLIN 0001 for each location.

9. Q-As a Small Business set aside, would incremental payments or partial
payments be allowed?

A- Contract financing will be addressed through forthcoming amendment to solicitation.