Performance Work Statement 09 Jan 2015
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA8224-15-R-0021-Amendment_II.pdf | ||
| Task_Order_0001.pdf | ||
| 1.21.2015.QA_Env_Test_Solicitation_FA8224-15-R-0021.pdf | ||
| QA_Env_Test_Solicitation_FA8224-15-R-0021.pdf | ||
| FA8224-15-R-0021-0001.pdf | ||
| A-10_Enviro_DD_1423-1.pdf | ||
| FA8224-15-R-0021.pdf | ||
| PWS_A-10_Enviro_27_OCT.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE-BASED WORK STATEMENT (PWS)
FOR
MAINTENANCE SERVICES
ENVIRONMENTAL TESTING A-10
(309 SMXG)
09 January 2015
TABLE OF CONTENTS
1. Description of Services 3
2. Contractor Tasks 3
3. Services Summary 3
4. Government Furnished Property 4
5. General Information 4
6. Appendices 5
1. DESCRIPTION OF SERVICES:
1.1 The contractor shall provide environmental testing and reports for the A-10C Portable
Automatic Test Station (PATS-70A) flight line tester, Windshield Temperature Tester, and Fuel Quantity Tester with the objective to providing Environmental testing and reports on the tests listed in section 2.1
1.2 All required services listed under Basic Services within this PWS will be requested individually by Task Order from this basic PWS.
2. BASIC SERVICES:
2.1 The contractor shall coordinate with the Government Representative (GR) for an on-site visit, within 15 days of contact by the government. A GR will arrive at the contractor’s place of performance with one or more of the items listed in the workload section of this
PWS. These items may include: a PATS-70 Core unit, a PATS-70 Auxiliary unit, a
Windshield Temperature Tester, and/or a Fuel Quantity Tester. If this is not feasible, the
Government will ship the test items to the contractor, at no cost to the contractor.
2.1.1 The contractor shall provide one or more of the following environmental tests, as required by Task Order, and provide a test report for each test detailing the results of the operational test within 14 calendar days (CDRL A001)
For Environmental Testing, the following configurations will be used:
TEST ITEM
POWER
REQUIREMENT
NUMBER / TYPE OF
PORTS
OPERATING MODES
PATS-70A 2,000 Watts (60 Hz) (Qty. 1) Power Cable
(Qty. 1) Interface Cable Self-Test
Windshield Temperature 150 Watts (60 Hz) (Qty. 1) Power Cable
(Qty. 1) Interface Cable Self-Test
Fuel Quantity 120 Watts (60 Hz) (Qty. 1) Power Cable
(Qty. 1) Interface Cable Self-Test
2.1.1.1 High Temperature per MIL-PRF-28800F Class II.
2.1.1.2 Low Temperature per MIL-PRF-28800F Class II.
2.1.1.3 Solar Radiation (Sunshine) per MIL-STD-810G Method 505.5
Procedure I
2.1.1.4 Low Temperature per MIL-STD-810G Method 502.5 Procedure I.
2.1.1.5 Relative Humidity per MIL-PRF-28800F Class II
2.1.1.6 Vibration per MIL-PRF-28800F Class II.
2.1.1.7 Shock per MIL-PRF-28800F Class II.
2.1.1.8 Transit Drop per MIL-PRF-28800F Class II.
2.1.1.9 Rain/Splash per MILD-STD-810G Method 506.5 Procedure I
2.1.1.10 Explosive Atmosphere per MIL-PRF-28800F Class II.
2.1.1.11 Crush Force 1000 lbs (+500/-0 lbs) applied for 10 minutes in X-Y
Axis (PATS-70A laying down with skids on the ground).
2.1.1.12 Dust per MIL-STD-810G Method 510.5 Procedure I
2.1.1.13 Low Pressure Altitude Storage per MIL-PRF-28800F Class II.
2.1.1.14 EMI/RFI per MIL-STD-461F, applicable tests are CE102, CS101, CS114, CS115, CS116, RE102, RS103
2.1.2 The Government Representative (GR) shall inspect the unit(s) under test as each phase of the testing is accomplished, or the GR may increase the number of quality control inspections, if deemed appropriate by the GR, as required.
Government personnel shall be admitted to all facilities where the testing is performed.
2.1.2.1 The attendance, or absence, of the GR for testing will be identified at each
Task Order. If the GR is absent, the task order will explain any needed criteria that shall be performed by the contractor, in-lieu of the GR being present.
2.2 The contractor shall return each test article upon completion to the GR who will transport it back to Hill AFB.
2.2.1 If special transport of test articles is needed, it will be detailed on the individual
Task Order.
3. SERVICE SUMMARY (SS)
Performance Objective PWS
Para
Performance Threshold
The contractor shall provide the
GR with a report detailing the results of the operational test within 14 calendar days.
2.1.1 (Satisfactory) Delivery of CDRL (A001)
4. GOVERNMENT FURNISHED PROPERTY AND SERVICES
4.1 The test articles with all associated cable shall be furnished to the contractor for the environmental tests under this contract. The contractor shall be responsible for safeguarding all Government property provided for contractor use.
4.1.1 All items to be submitted for testing will be described in the Task Order, from those items listed as possible subjects from Appendix B.
4.2 The Government shall have unlimited rights to all intellectual property developed by the contractor under this contract. The Government may use such items for any other purpose as defined in the Defense Federal Acquisition Regulation Supplement (DFARS) definition of “unlimited rights”.
5. GENERAL INFORMATION:
5.1 SPECIAL QUALIFICATIONS:
5.1.1 Contractor must be able to perform all tests in accordance with the specifications listed above.
5.2 SAFETY REQUIREMENTS:
In performing work under this contract, the contractor shall:
5.2.1 Conform to the safety requirements contained in this contract for all activities related to the accomplishment of the work.
5.2.2 Comply with additional, immediate precautions that the Contract Officer (CO) may require for safety and mishap prevention purposes.
5.2.3 Provide protection to government property to prevent damage during the period of time the property is under the control, or in possession of, the contractor.
5.2.4 Include a clause in all subcontracts to require subcontractors to comply with the safety provisions of this contract as applicable.
5.2.5 In the event of an accident or mishap, the contractor shall take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, and preserve evidence until released by the accident/mishap investigative authority through the CO.
5.2.6 Record and report promptly (within one hour) to the CO and/or authorized GR, all available facts relating to each instance of damage to government property or injury to either contractor or government personnel.
5.2.7 If the government elects to conduct an investigation of the accident/mishap, the contractor shall cooperate fully and assist government personnel in the conduct of investigation until the investigation is completed.
5.3 HOURS OF OPERATION:
N/A
5.4 GOVERNMENT OBSERVATIONS:
5.4.1 Government personnel may not interfere with contractor performance, and only the CO may make changes to the contract.
5.5 CONTRACTOR REPORTING:
N/A
6. APPENDICES
A. Acronyms & Abbreviations list
B. Workload Data
APPENDIX A
ACRONYMS AND ABBREVIATIONS
Acronym/Abbreviations Definition
AFED Air Force Engineering Data
AFTD Air Force Technical Data
ANSI American National Standards Institute
ASO American Standards Organization
ATE Automated Test Equipment
ATP Automated Test Procedures
AFB Air Force Base
AFMC Air Force Material Command
AMSO Acquisition Management Support Office
AMSS Acquisition Management Support Specialist
CAR Corrective Action Report
CDRL Contract Data Requirements List
CFR Code of Federal Regulation
CO Contract Officer
COR Contracting Officer Representative
DoD Department of Defense
DFARS Defense Federal Acquisition Regulation Supplement
ECM Engineering Change Memorandum
FAR Federal Acquisition Regulation
FY Fiscal Year
GR Government Representative
HAFB Hill Air Force Base
IAW In Accordance With
ISO International Standard Organization
MIL-PRF Military Performance Specification
MIL-STD Military Standard
OEM Original Equipment Manufacturer
OSHA Occupational Safety and Health Act
PARA Paragraph
PATS Portable Automatic Test Station
PPE Personal Protective Equipment
PWS Performance-Based Work Statement
OEM Original Equipment Manufacture
SMXG Software Maintenance Group
SS Service Summary
TO Technical Order
TP Test Plan
UIC Unit Identification Code
APPENDIX B
Workload Data
PATS-70A
PATS-70A Core Unit Dimensions
26” x 19” x 21”
Weight
100 lbs.
PATS-70A Auxiliary Unit
Dimensions
34” x 19” x 21”
150 lbs.
Cables Core Cables and Aux Cables
Windshield Temperature Tester
Windshield Temperature Test Set
ITA
6” x 6” x 10”
10 lbs.
Cables Cables
Fuel Quantity Tester
Fuel Quantity
ITA
18” x 18” x 18”
40 lbs Cables Cables