Narrative_of_Electrical_Loads_Spreadsheets.docx

DOCX document 12 KB Posted

Attached to
T-38A/B and A-10 Automatic Dependent Surveillance-Broadcast (ADS-B) Federal contract opportunity
Solicitation number
FA822017R0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Narrative of Electrical Loads Spreadsheet

View the file

Other files for this federal contract opportunity

Other files attached to T-38A/B and A-10 Automatic Dependent Surveillance-Broadcast (ADS-B), newest first.
File Type Posted
ATTACHMENT_11_Florida_Wage_Determination.pdf PDF
FA822017R0001.pdf PDF
FA822017R0001_______0002.pdf PDF
FA822017R0001_______0001.pdf PDF
ATTACHMENT_10_AFMAN_63-119.xls XLS spreadsheet
ATTACHMENT_08_A-10_DD254.pdf PDF
ATTACHMENT_15_Source_of_Repair.pdf PDF
ATTACHMENT_02_T-38_A-10_APX-119_GPS_PWS_R01.pdf PDF
ATTACHMENT_02_T-38_A-10_APX-119_GPS_PWS.pdf PDF
ATTACHMENT_06_AFMC_Form_158.pdf PDF
ATTACHMENT_07_DD_Form_1653.pdf PDF
ATTACHMENT_01_Pricing_Matrix_R01.xlsx XLSX spreadsheet
ATTACHMENT_09_Reserved.pdf PDF
ATTACHMENT_13_Maryland_Wage_Determination.pdf PDF
T-38_A_and_B_Fleet_12_7_16.xlsx XLSX spreadsheet
Electrical_Loads.xlsx XLSX spreadsheet
ATTACHMENT_05_Technical_Manual_Contract_Requirements.pdf PDF
ATTACHMENT_04_GFP_List.pdf PDF
ATTACHMENT_14_Warranty_Information.pdf PDF
Materiel_Fielding_Plan_Template.docx DOCX document
Item__20_ELA-AT-38B_DC_load_Analysis_ECM_Pod.xlsx XLSX spreadsheet
ATTACHMENT_12_Indiana_Wage_Determination.pdf PDF
ATTACHMENT_03_CDRLs_R01.pdf PDF
Item__20_ELA-T-38_AC_Loading_TO_data-ECM_Pod.xlsx XLSX spreadsheet
ATTACHMENT_03_CDRLs.pdf PDF
Synopsis_of_FA8220-17-R-0001_ADS-B_-_Presolicitation.docx DOCX document
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Narrative of Electrical Loads Spreadsheets

Electrical Loads.xlsx The attached file has AC numbers that were taken from the technical order with some additions for modifications that don't apply to all aircraft.

Some assumptions appear to have been made regarding phase of flight and load duration. This spreadsheet has been used for various modification over the past few years.

Item__20_Electrical_Load_Analysis_-_AT-38B_DC_load_Analysis_ECM_Pod_ELECTRICAL Item__20_Electrical_Load_Analysis_-_T-38_AC_Loading_TO_data-ECM_pod_ELECTRICAL

Attached files are from the AT-38B ECM Modification conducted in 2012 under TO 1T-38B-508. I think that was probably the most recent analysis done for the B-model. It's pretty similar to the file I sent you earlier for the A-model, but you can see that the engineer made some different assumptions about power usage of some pieces of equipment during the different phases of flight.

If discussion is needed to further understanding of the electrical loads for the T-38 please ask.

File details come from the government source that posted it. Updated .