08_QALI_F_15_Canopy_Actuacted_Initiator.pdf
PDF 909 KB Posted
- Attached to
- INITIATOR, GAS TO GAS
- Solicitation number
- FA8213-21-R-3015
About this file
This document contains a federal contract solicitation and related quality assurance requirements. The solicitation seeks various initiators, gas to gas initiators, initiator cartridges, and initiators for use in aircraft ejection systems, fire suppression systems, and other applications. Delivery locations include the United States and foreign military sales countries. Key details include solicitation number FA8213-21-R-3015; line items for the above products with national stock numbers, part numbers, quantities ranging from 1 to 218 units; delivery dates from September through December 2021; and involvement of the Department of the Air Force Materiel Command Lifecycle Management Center and Hill Air Force Base. The quality assurance document specifies inspection requirements for the initiator products to ensure compliance with specifications, including mandatory stamp verification, leak testing, and witnessing of testing by the Defense Contract Management Agency.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Name
CAGE code
PR No. FD2020-
Date Contract Awarded
Final Delivery Date (FDD)
Program Name
DODIC
Part Number
The contractor, at a minimum, shall allow DCMA to inspect the following points:
Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)
Witness - W: GSI required to attend per comment section.
Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification) Monitor - R: Will monitor testing, may reduce to verification per comment section.
Notify - N: By phone or email prior to action.
Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)
Prepared by:
Date
THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.
QUALITY ASSURANCE LETTER OF INSTRUCTION
Planning Requirements
COMMENTS
NOTICE
Engineer Signature
Rev Date: 5 May 2019
Sheet1
| Text46: 17 JUN 2020 | |
| 2020-06-17T09:42:17-0600 | |
| TIDWELL.QUINN.RAY.1241451913 |
| undefined_9: N |
| Text32: 9. Additional Requirements |
| undefined_8: M |
| Text31: 8. Shippers (DD250, Reports) |
| undefined_7: M |
| Text30: 7. AMMO Data Card Review |
| undefined_6: V |
| Text29: 6. Preparation for Shipment |
| undefined_5: W |
| Text28: 5. LAT |
| undefined_4: V |
| Text27: 4. LAT Sample Selection |
| undefined_3: V |
| Text26: 3. X-Ray/N-Ray |
| undefined_2: V |
| Text25: 2. Leak Test |
| undefined: V |
| Text36: 1. Explosive Weight |
2. Verify gross leak and fine leak check are performed.
3. Ensure film labeling correct. Ensure radiographic film is readable and well-defined. DCMA is not required to interpret film.
4. Randomly select LAT units per latest government approved ATP.
5. Testing should occur in accordance with latest government approved ATP. Prior to LAT ensure proper calibration and validation of all test equipment. Witness proper test setup and at least the first 3 functional tests. Further witnessing may be required if there are known concerns with the item or requested by Government Engineer.
6. Ensure Paperwork is correct.
7. Verify all energetic materials: list original manufacturer,original lot number, and latest certification/recertification date < 24 months.
8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)
9. Any additional requirements imposed by DCMA shall be approved by Government Project Engineer
| Text24: 1.Inspection |
| Part Number: 6028200, 2271500-1 |
| DODIC: MH64, MC61 |
| Text20: |
| Text19: |
| Part Number Line 2: |
| Contract No: 21-50126, 21-50127 |
| Date Contract Awarded: |
| Final Delivery Date FDD: |
| Program Name: f-5 |
File details come from the government source that posted it. Updated .