07_QALI_F_15_1_5_2_0_Time_Delays.pdf

PDF 909 KB Posted

Attached to
INITIATOR, GAS TO GAS
Solicitation number
FA8213-21-R-3015
Issued by

About this file

This document contains a quality assurance letter of instruction and related federal contract solicitation. The quality assurance letter outlines inspection requirements for explosive initiators and cartridges to be delivered under two Department of Defense contracts. Mandatory inspection points include documentation authentication and explosive weight verification. Witnessed testing includes leak checks and latency tests. Verification is required for film labeling, sample selection, and test equipment calibration. Additional monitoring may be imposed. The related solicitation from the Department of the Air Force seeks explosive initiators and cartridges identified by national stock numbers. Delivery locations include foreign military sales countries. Responses are due from incumbent contractors Universal Propulsion Company and Chemring Energetic Devices.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name

CAGE code

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor, at a minimum, shall allow DCMA to inspect the following points:

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend per comment section.

Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification) Monitor - R: Will monitor testing, may reduce to verification per comment section.

Notify - N: By phone or email prior to action.

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer Signature

Rev Date: 5 May 2019

Sheet1

Text46: 17 JUN 2020
2020-06-17T09:45:37-0600
TIDWELL.QUINN.RAY.1241451913
undefined_9: N
Text32: 9. Additional Requirements
undefined_8: M
Text31: 8. Shippers (DD250, Reports)
undefined_7: M
Text30: 7. AMMO Data Card Review
undefined_6: V
Text29: 6. Preparation for Shipment
undefined_5: W
Text28: 5. LAT
undefined_4: V
Text27: 4. LAT Sample Selection
undefined_3: V
Text26: 3. X-Ray/N-Ray
undefined_2: V
Text25: 2. Leak Test
undefined: V
Text36: 1. Explosive Weight

2. Verify gross leak and fine leak check are performed.

3. Ensure film labeling correct. Ensure radiographic film is readable and well-defined. DCMA is not required to interpret film.

4. Randomly select LAT units per latest government approved ATP.

5. Testing should occur in accordance with latest government approved ATP. Prior to LAT ensure proper calibration and validation of all test equipment. Witness proper test setup and at least the first 3 functional tests. Further witnessing may be required if there are known concerns with the item or requested by Government Engineer.

6. Ensure Paperwork is correct.

7. Verify all energetic materials: list original manufacturer,original lot number, and latest certification/recertification date < 24 months.

8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

9. Any additional requirements imposed by DCMA shall be approved by Government Project Engineer

Text24: 1.Inspection
Part Number: 3123900-6, 6123100, 3123900-5, 6122100
DODIC: MT15, MU84, MT14, MU87
Text20:
Text19:
Part Number Line 2:
Contract No: 21-50126, 21-50127
Date Contract Awarded:
Final Delivery Date FDD:
Program Name: F-15

File details come from the government source that posted it. Updated .