Attachment_4_ES6200_ADC.docx
DOCX document 26 KB Posted
- Attached to
- MJU-52A/B Federal contract opportunity
- Solicitation number
- FA8213-19-R-3000
About this file
This document contains an attachment to a federal contract solicitation for the MJU-52A/B munition. The solicitation requires an initial first article test of 320 units to be delivered within 180 calendar days of award notice, with additional units to be ordered over the next five years on an indefinite delivery/indefinite quantity basis. The contract will be awarded by the Department of the Air Force Materiel Command Lifecycle Management Center and involves the production of MJU-52A/B units with part number 1097. Responding vendors must submit capability statements by the specified deadline and the justification cites sole source availability from the incumbent. Successful offerors will be required to provide all associated technical data and reports.
ES6200 Ammunition Data Cards
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| JA_-MJU52_Redacted.pdf | ||
| FA821319R3000_______0002.pdf | ||
| DD254_MJU52AB.pdf | ||
| FA821319R3000_______0001.pdf | ||
| MJU52_A006_CDRL.pdf | ||
| REPSHIP.doc | DOC document | |
| WARP_Attachment_2.docx | DOCX document | |
| DD254SolicitationASCMJU52.pdf | ||
| TransInstruction4.pdf | ||
| Attachment_5_ES7034_Rework.docx | DOCX document | |
| Attachment_3_ES7035.doc | DOC document | |
| CDRLs.pdf | ||
| FA821319R3000.pdf | ||
| PHST_SOW_09NOV2015.pdf | ||
| AIRSPEC.docx | DOCX document | |
| FORM158.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 4
ES6200
Ammunition Data Cards (End Item Component Listing) Jan 2012 (revision)
When to Use: When a “Detailed End Item Component Listing” for ADC reporting is specified as a requirement per the Airmunitions Specification. End Item Component Listing with Drawing Number(s) and Nomenclature(s) must be provided by the government for sections “c” and “d”.
Only if a “Detailed End Item Component Listing” for ADC reporting is specified as a requirement per the Airmunitions Specification–
Text:
Detailed requirements and guidance for the preparation of Ammunition Data Cards (ADCs) are contained in MIL-STD-1168B, DI-MISC-80043 and the Worldwide Ammunition-data Repository Program (WARP) online user’s manual. Detailed requirements for obtaining and using a manufacturer's identification symbol, which is an integral component of the ammunition lot number, can be found in MIL-HDBK-1461.
(a) The supplier shall develop and submit ADCs in accordance with the requirements of this clause, MIL-STD-1168B, and the user manual located on the WARP database. The WARP application is accessed through the Munitions History Program (MHP) website. The ADC requirement is a flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.
(b) The supplier shall prepare an ADC for each lot of item(s) being produced under this contract, regardless of whether or not those lots are accepted or rejected by the Government. The ADC shall comply with MIL-STD-1168B and WARP requirements.
(c) Unless otherwise authorized by the Procuring Contracting Officer, the supplier shall include, in the components sections on the ADC representing the deliverable item, as a minimum; all assemblies, sub-assemblies, components, explosives, and propellants listed below for the item being procured.
End Item Component Listing:
| Drawing Number | Nomenclature | |
| 1097 | ASD BOLIR L5A2 | |
| 1098 | Payload Sail Subassembly | |
| 62314 | Frame Cassette |
(d) The component items identified below are from paragraph (c) above and will require their own component ADC in addition to being listed on the end item ADC. The component ADCs shall also comply with MIL-STD-1168B and WARP requirements.
(e) When required by the technical data package, all component lot numbers shall be in accordance with MIL-STD-1168B lot number convention. When not required by technical data package, component lot number may be constructed through producer lot number convention.
f. The flow-down of the requirement for component ADCs generated via WARP is highly encouraged for other items not identified in paragraph (d) above when the prime contractor is purchasing components, assemblies, and subassemblies from subcontractors or vendors.
g. All component RFD/ECPs shall be listed on the ADC for the deliverable item, as well as on the component ADC, when that component is identified in paragraph (d) above. The WARP user manual provides information on the level of detail required.
h. A sample ADC shall be developed and submitted to the WARP system 30 days prior to First Article testing or 30 days prior to production in the event a first article is not required. The WARP ADC program will not allow the submission of additional ADCs until such time as the sample ADC has been approved in the system.
(End of clause)
(ES6200)
File details come from the government source that posted it. Updated .