2013_CDRLs_STRESS.pdf

PDF 1 MB Posted

Attached to
T-38 Engineering Services Federal contract opportunity
Solicitation number
FA8211-13-R-3004
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Contract Data Requirements List

View the file

Other files for this federal contract opportunity

Other files attached to T-38 Engineering Services, newest first.
File Type Posted
FA821113R3004_______0002.pdf PDF
PWS_for_IATPandLESS.pdf PDF
2013_CDRLs_IATPandLESS.pdf PDF
FA821113R3004_______0001.pdf PDF
PWS_for_STRESS.pdf PDF
PWS_for_RMS_Support.pdf PDF
AF_Proposal_Adequacy_Checklist.pdf PDF
PWS_for_FEM.pdf PDF
PWS_for_BASIC.pdf PDF
2013_CDRLs_RMS_Support.pdf PDF
FA821113R3004.pdf PDF
2013_CDRLs_FEM.pdf PDF
2013_CDRLs_BASIC.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Irem) OM8 No. 0704·0188

The public reporting burden for this collection of information is estimated to av.nge 110 nau,s per response, including the time for reviewing instrvetion$, searching existi" •• dilu, sources, O'thlring and maintaining the daou needed, "nd completing and reviewing the collection of information. Send comments regarding this burden estimate or any other npect of this collection of inform:nion, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directortte I0704-01SSI. Re.:;pondent$ should be aware that notwMstanding any other provision of law, no per:;on :;hell be $ubject to any penalty for failing to comply with II collection of information if it dOllS not display II currently valid OMB control number. Please do not ret •.•rn yo •.••form 10 the above o'ganizalion. S.nd completed form to the Government Issuing Conlnlcting Office. for the ContraetJPR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY,

A roP TM OTHER MGMT

D. SYSTEM liTEM IE. CONTRACTIPR NO. F.CONTRACTOR

T-38 Stress Reports Update Phase VITI Northrop Grumman Corp.

1. DATA ITEM NO. 2. TITLE OF DATA ITEM J. SUBTITLE

A039 Contractor's Progress. Status and Management Report

4. AUTHORITY (Data AcquisirionDocu~nr No.J I 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

Dl-MGMT-80227 BLK 16 AFLCMC/WLDMB

7. DO 250 REQ g. OIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION '4. DISTRIBUTION

REQUIRED QRTLY BLK16LT b. COPIES

8. APP CODe ".AS OF DATE ".OATE OF SUBSEQUENT iI. ADDRESSEE Final

N/A D SUBMISSION Orah BLK 16 BLK 16 R., R.pro

16. REMARKS AFLCMClWLDMB 1 BlockS: PWS paragraph's: 4.3.1.3.4.3.1.5,4.3.1.6. 4.3.2.1. 4.3.2.2, 4.3.5.2, 5.2.1. 5.2.2. 6064 Do!?WoodAve.

Bldg 1254 Block 9: Distribution Statement D: Distribution authorized to Department of Defense Hill AFB.lJT

(DoD) and U.S. 000 contractors for'administrative or operational use.•determined 21 May 84056·5816 2013. Other requests for a copy of this document shall be referred to AFLCMC/WLDMB. Atto: VivianHughes

Warning: This document contains technical data whose export is restricted by the Arms Export Control Aet (Title 22, lJ.S.c., Sec 2751 et seq.) or Executive Order 12470.

Violations of these export laws are subject to severe criminal penalties.

The above Distribution Statement and Warning Notice shall be displayed or affixed to the data in a conspicuous position.

Block's 10, 11, 12, and 13: The Contractor's Progress. Status and Management Report shall be delivered 90 days ARO and quarterly thereafter.

15. TOTAL I 0 1 0

G. PREPARED BY H. DATE

IT:-

VED /1Ie- J. DATE s::::.-~ 21 May 2013 ,;7/1-1. "!713Deanne Browning

.';;7~.~PR~I~C~E~G~R~OU~P'

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of Pages Adobe Professional 7.0

CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-01BB

The public reporting burden for this collection of information is estimated to aVefage 110 hours per re:oponse, including the time for reviewing instructions, selll'chinll existing data sources, gathering and mainuining the data needed, i1nd completing and reviewing In. collection of information. Send comments regarding this burden estimate or any other asplte! 01 this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Servi.es Oifectoret.

(0704·0188). Fle:;pondents should b. aware th:u notwithstanding i!Il'\V other provision of law, no parson shall be lOubject to any penllity 10r f~linlllo comply with a collection of information if it does r.ot di>::play • currently valid OMB eontrol number. Please do not 'eturn you. form to the above organization. Send completed form to the Govemmenl I•• uing Conlr.cting Office. for the ContraetlPR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TOP TM OTHER MISC

O. SYSTEMIITEM IE. CONTRACTIPR NO. F. CONTRACTOR

T-38 Stress Reports Update Phase Vlll Northrop Grumman Corp.

1. DATA ITEM NO. 2. TITLE Of DATA ITEM 3. SUBTlnE

A047 Scientific and Technical Reports

4. AUTHORITY (D.r. Acquisition Document No.) 15. CONTRACT REFERENCE 6. REQUIRING OFACE

Dl-MISC-8071IA BLK 16 AFLCMClWLDMB ,. 00250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE Of ARST SUBMISSION ". DISTRIBUTION

REQUIRED I TIME BLK 16LT b. COPIES

8. APP CODE ".AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Fin.1

N/A D SUBMISSION Dr.ft BLK 16 BLK 16 R., Repro

16. REMARKS AFLCMClWLDMB I Block5: SOWparagraph's:4.3.1.3,4.3.1.4,5.2.1,5.2.2. 6064 Doe;\\'oodAve.

Bldg 1254 Block 9: Distribution Statement 0: Distribution authorized to Department of Defense Hill AFB, UT

(000) and U.S. DoD contractors for administrative or operational use. determined 21 May 84056-5816 2013. Other requests for a eopy of this document shall be referred to AFLCMC/WLDMB. AUn: VivianHughes

Warning: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.s.e., See 2751 ct seq.) or Executive Order 12470.

Violations of these export laws are subject to severe criminal penalties.

The above Distribution Statement and Warning Notice shall be displayed or affixed to the data in a conspicuous position.

Block's 10. 11, 12. and 13: The Scientific and Technical Reports: Entitled - T-38 Stress Reports Update: Phase VIII Analysis shall be delivered 12 months ARO.

15. TOTAL I 0 1 0

G~EPAREOb - H.DATE

I.Z0VEO BY 1'.~ J.OATE

- 21 May 2013 ;l/kij/.3 Deanne Browning r'~'~.~PR""'C~E~G~R~OU""P"

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1. FEB 2001 PREVIOUS EDiTION MAY BE USED. Page I of Pages Adobe Professional 7,0

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DaD 5010, 12-M for detailed instructions.)

FOR THE CONTRACTOR

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TOP· Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning, ""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CORLwas prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DaD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in 000 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. 0000 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

DD FORM 1423-1 (BACK), FEB 2001

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DO Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DO Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group Ill. Definition· Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not· require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DO Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shalt be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

File details come from the government source that posted it. Updated .