2013_CDRLs_IATPandLESS.pdf

PDF 1 MB Posted

Attached to
T-38 Engineering Services Federal contract opportunity
Solicitation number
FA8211-13-R-3004
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Contract Data Requirements List for IATP/LESS

View the file

Other files for this federal contract opportunity

Other files attached to T-38 Engineering Services, newest first.
File Type Posted
FA821113R3004_______0002.pdf PDF
FA821113R3004_______0001.pdf PDF
PWS_for_IATPandLESS.pdf PDF
FA821113R3004.pdf PDF
2013_CDRLs_FEM.pdf PDF
2013_CDRLs_BASIC.pdf PDF
PWS_for_STRESS.pdf PDF
PWS_for_RMS_Support.pdf PDF
AF_Proposal_Adequacy_Checklist.pdf PDF
PWS_for_FEM.pdf PDF
PWS_for_BASIC.pdf PDF
2013_CDRLs_STRESS.pdf PDF
2013_CDRLs_RMS_Support.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMS No. 0704-0188

Th. publie reporting bu,de'" fOf this c:ollection of informiltion is estimated to iI".,-age 1 10 hour:> per response, including the time for reviewing instructions, searching existing deta SOU'CU, 9alh ••.ing '!"lei maintaining the data needed, ••nd completing and reviewing 1M col~ction of information. Send comments regarding this burden estimate or any otl'l~ npect of this collection of information, irw;luding sU!iI'ilestions tor reducing the burden, to the Department of O.fense, Executive Services Oir'clorale 10704-0188). Respondent!: should be ilwl". thilt notwithstanding any other provision gllaw. no person 51'1,,11be subje<:t to any penalty for failing to comply with iI collection of info'n' •• tion if it does 1'101display a currently valid OMB control number. P1e•• e do not ,eturn you, form to the above o'ganization. Send completed form to the Government l•• uing Conn.cting Officer for the ContraetlPR No. lisu·d in Bloek E.

A. CONTRACT LINEITEMNO. B. EXHIBIT C. CATEGORY:

006/007 A TOP TM OTHER IPSC

O. SYSTEMIITEM I E. CONTRACTIPRNO. F. CONTRACTOR

T-38C IATP and LIESS Phase X Northrop Grumman Corporation

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A020 Software Development Plan (SOP) T-38 IATP and UESS Development Report • Phase X

4. AUTHORITY (D.t. Acquisition Document No.) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-lPSC-81427A PWS para: 4.3.1.1.2, 4.3.1. 1.5,5.2.2 AFLCMC/WLDEJ

7. DO 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION '4. DlSTllIBVTION

REQUIRED 1 TIME BLK 16DO b. COPIES

8. APP CODE ".AS OF DATE ".DATE OF SUBSEQUENT a. ADDRESSEE Fin.10 SUBMISSION Dr,ft BLK 16 BLK 16 Ro, Repro

16. REMARKS AFLCMClWLDEJ 1 Block 4: Contractor Fonnat Acceptable. 6057 Box Elder Lane

Bldg 1285 Block 9: Distribution Statement 0: Distribution authorized to Department of Defense Hill AFBUT

(000) and U.S. 000 contractors for administrative or operational use, detennined 18 June 84056-5811 2013. Other requests for a copy of this document shall be referred to AFLCMC/WLDF-.:J. Ann: Mike Blinn

Warning: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22. V.S.C., See 2751 et seq.) or Executive Order 12470.

Violations of these export laws are subject to severe criminal penalties.

The above Distribution Statement and Warning Notice shall be displayed or affixed to the data in a conspicuous position.

Block's 10. 1L 12. and 13: The Draft Software Development Plan: Entitled - T-38 IATP and UESS Developmcnt Report - Phase X shall be delivered 11 months ARO. The Governmcnt will have 30 days to review the draft document and provide comments. The Contractor shall deliver the Final report 12 months ARO.

,IS. TOTAL I 0 1 0

G. PREPAREDBY H.OATE I. APPROVEO7. ~/L/ J. DATE~--~ 18Jun2013 tf)"...../3Deanne Brownmg Mike Blinn ../ E/

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

DO FORM 1423-1. FEB 2001 PREVIOUSEDITIONMAY BE USED. Page 1 of 1 Pages Adobe Professional 7.0

(1 Data Item) OMB No. 0704-0188

The public reporting burden for thi~ collection of informlltion ;s estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed. and completing and reviewing the collection of Information. Send comments regarding thiS burden estimate or any other aspect of this collection of information, including suggestions lor 'educing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of mformation if it does nOl display a currently valid OMB conlrol number. Please do nOl return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY,

006/007 A TOP TM OTHER IPSC

D. SYSTEM/ITEM IE. CONTRACT/PR NO. F. CONTRACTOR

T-38C IATP and L/ESS - Phase X Northrop Grumman Corporation

1. DATA ITEM NO. 2. TITLE OF OATA ITEM 3. SUBTITLE

A031 Software Version Description (SVD) '1'-38 IATP Software - Version 4

4. AUTHORITY (DaUl Acquisition Document No.) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE

Dl-IPSC-81442A PWS para: 4.3. I. 1.3 AFLCMC/WLDEJ

7. DD 250 REQ 9. DIST STATEMENT '0. FREQUENCY '2. DATE OF FIRST SUBMISSION '4. DISTRIBUTION

REQUIRED I TIME BLK 16DD b. COpiES

8. APP CODE ". AS OF DATE '3. DATE OF SUBSEQUENT a. ADDRESSEE Fin<'llD SUBMISSION Dr"ftBLK 16 BLK 16 R., Repro

16. REMARKS AFLCMCIWLDEJ I

Block4, Contractor Format Acceptable. 6057 Box Elder Lane

Bldg1285 Block 9: Distribution Statement D: Distribution authorized to Department of Defense HillAFB UT (DoD) and U.S. 000 contractors for administrative or operational use, determined 18 June 84056-5811 2013. Other requests for a copy of this document shall be referred to AFLCMC/WLDEJ. Ann: Mike Blinn

Warning: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.c., Sec 2751 et seq.) or Executive Order 12470.

Violations of these export laws are subject to severe criminal penalties.

The above Distribution Statement and Warning Notice shall be displayed or affixed to the data in a conspicuous position.

Block's 10, II, 12, and 13: The Draft Software Version Description: Entitled - T-38 TATP Software Version 4 shall be delivered 11 months ARO. The Government will have 30 days to review the draft document and provide comments. The Contractor shall deliver the Final report 12 months ARG.

1'5. TOTAL 0 I 0

G. PREPARED BY H.DATE I. APPROVED%: //./1///-/ J. DATE~-~.- , 18Jun2013 ~C /,f'J ••.....If Deanne Browning Mike Blinn

17. PRICE GROUP

1B. ESTIMATED

TOTAL PRICE

DD FORM 1423-1. FEB 2001 PREVIOUS EDITION MAY BE USED. Page of I Pages

Adobe Professional7.0

(1 Data Item) OM8 No. 0704-0188

The public r.porting burden lor this collection 01 informOltion is .stimat..:l to 'Vet.g. '10 l'Iour$ p.r •.•sponn, including tke time for ,.v'ewini instructions, snr<;l'1ing 'llisting dala sources, gatherirtg .nd mainUining the dua needed. and completing llnd revi.wing 1M coll.ction of information. Send comments reg.rding this burden .stimat. or any other npKt of this collection 01 information. including suggestions for r.ducing the burd.n, to the Oep;utmvnt of o.fens" Executive S.rvie.s Directorate (0704-0188). Respondents should b•• war, that notwithstanding any other provision of law, no person shall b. subjea to any p.nllity lor feiling to eomply with. collection of information if it does not display. cUIr.ntly valid OMS control number. Please do not teturn YOUt form to the .bove o.ganitation. Send completed form to the Government luuing Contracting Office, fot the ContractIPR No. listlld in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

006/007 A TOP 1M OTHER IPSC

O. SYSTEMnTEM I E. CONTRACTIPR NO. F.CONTRACTOR T-38C IATP and LIESS Phase X Northrop Grumman Corporation

1. DATA ITEM NO. 2. TiTlE OF DATA TTEM 3. SUBTITlE

A032 SoftwareUser Manual(SUM) T-38 IATP and UESS Software Users Manual- Version 4

4. AUTHORITY loet. Acquisition Document No.) I 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-lPSC-81443A PWS para: 4.3.1.1.4, 5.2.2 AFLCMC/WLDEJ

7. DD 250 REQ 9. DIST STATEMENT '0. FREQUENCY 12. DATE OF FIRST SUBMISSION '4. DISTRIBUTION

REQUIRED 1 TIME BLK 16DD b. COPlES

8. APP CooE ".AS OF DATE 13. DATE OF SUSSEQUENT a. ADDRESSEE FinalD SUBMISSION D,.ft BLK 16 BLK 16 R., Repro

16. REMARKS AFLCMGWLDEJ I

Block 4: Contractor Format Acceptable. 6057 BoxElder Lane

Bldg. 1285 Block 9: Distribution Statement D: Distribution authorized to Department of Defense Hill AFBUT

(DaD) and U.S. DaD contractors for administrative or operational use, determined 18 June 84056-5811 2013. Other requests for a eopy of this document shall be referred to AFLCMC/WLDEJ. Aun: Mike Blinn

Warning: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.c., See 2751 et seq.) or Executive Order 12470.

Violations of these export laws are subject to severe criminal penalties.

The above Distribution Statement and Warning Notice shall be displayed or affixed to the data in a conspicuous position.

Block's 10, II, 12, and 13: The Draft Software Users Manual: Entitled - T-38 IATP and UESS Users Manual· Version 4 shall be delivered II months ARO. The Government will have 30 days to review the draft document and provide comments. The Contractor shall deliver the Final report 12 months ARO.

1o/T0TAL 0 1 0 G. PREPAREO BY H.DATE I. APPROVEO B~ ,// .....- J. DATE~-~ 18 lun 2013 ~ 't"J..-/3Deanne Browning Mike Blinn r'~7~.~PR~'~C~E~G~R~O~U~P"

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1. FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OM8 No. 0704-0188

The public reporting burden for thi!:, collection of inform lit ion is estimated to lIverage 110 hours per response, including the time for reviewing instructions, searching e;o:isting data sources, gathering and maintalnmg the datil needed, llnd completing <lncireviewing the collection of Information. Send comments regarding this burden estimllte or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department 01 Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstandingany other provision <;If I",VI',no parson shall be subject to any penalty for failing to comply with a collection of informationif it does not displaya currentlyvalid OMBcontrol number. Please do not return your form to the above organization. Send completed form to the GovernmentIssui"llContracti"llOfficerfor the Contract/PRNo. listed in BlockE.

A. CONTRACT LINE ITEM NO.

006/007

B. EXHIBIT

A

C. CATEGORY,

TOP TM OTHER MOMT

D. SYSTEM/ITEM

T-38C IATP and LIESS Phase X

1. DATAITEMNO.2. TITLEOFDATAITEM

IE. CONTRACT/PR NO. F. CONTRACTOR

Northrop Grumman Corporation

3. SUBTITLE "~7~.~P~RI~C~E~G~R~O~U~P"

A039 Contractor's Progress, Status and Management Report Monthly Status Reports

4. AUTHORITY(Data Acquis.ition Document No.)

Dl-MOMT-80227

I 5. CONTRACTREFERENCE

I BLK 16

10. FREQUENCY 12. DATEOFFIRSTSUBMISSION

6. REQUIRINGOFFICE

AFLCMC/WLDEJ

7. DO250 REQ

DD

B. APPCODE

9. DISTSTATEMENT

REQUIRED

o

MTHLY

11. AS OFDATE

BLK 16

2 mos ARO

13. DATEOFSUBSEQUENT

SUBMISSION

BLK 16

14. DISTRIBUTION

a. ADDRESSEE Dran

b. COPIES Final

Reg Repro

1B. ESTIMATED

TOTALPRICE

16. REMARKS

Block 4: Contractor Format Acceptable.

Block 5: PWS para 4.3.1.2.1, 4.3.1.2.2, 4.3.1.2.3, 4.3.1.3.1, 4.3.1.3.2, 4.3.2.1, 4.3.2.2, 4.3.5.2.

Block 9: Distribution Statement D: DistTibution authorized to Department of Defense (DaD) and U.S. DaD contractors for administrative or operational use, determined 18 June 2013. Othcr requests for a copy of this documcnt shall be referred to AFLCMC/WLDEJ.

Warning: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.c., Sec 2751 et seq.) or Executive Order 12470.

Violations of these exp0rllaws are subject to severe criminal penalties.

The above Distribution Statement and Warning Notice shall be displayed or affixed to the data in a conspicuous position.

Block's 10, II, 12, and 13: The Contractor's Progress, Status and Management Report shall be delivered 2 months ARO and Monthly thereafter.

AFLCMCIWLDMB

6064 Dogwood Avc.

Bldg 1254 Hill AFB, UT

84056-5816 Attn: Vivian Hughcs

AFLCMClWLDEJ

6057 Box Eldcr Lanc

Bldg. 1285

Hill AFB, UT

84056-5811 Attn: Mikc Blinn

PREVIOUS EDITION MAY BE USED. Page I of

G. PREPARED BY

Deanne Browning

DO FORM 1423-1, FEB 2001

H.DATE

18 Jun 2013

1.}.TOTAL

I. APPROVED BF. ~//./

Mike Blinn , ~ f)ff/C o 2

J. DATE

o

Pages

File details come from the government source that posted it. Updated .