2013_CDRLs_FEM.pdf

PDF 2 MB Posted

Attached to
T-38 Engineering Services Federal contract opportunity
Solicitation number
FA8211-13-R-3004
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Contract Data Requirements List

View the file

Other files for this federal contract opportunity

Other files attached to T-38 Engineering Services, newest first.
File Type Posted
FA821113R3004_______0002.pdf PDF
PWS_for_IATPandLESS.pdf PDF
2013_CDRLs_IATPandLESS.pdf PDF
FA821113R3004_______0001.pdf PDF
PWS_for_STRESS.pdf PDF
PWS_for_RMS_Support.pdf PDF
AF_Proposal_Adequacy_Checklist.pdf PDF
PWS_for_FEM.pdf PDF
FA821113R3004.pdf PDF
2013_CDRLs_BASIC.pdf PDF
PWS_for_BASIC.pdf PDF
2013_CDRLs_STRESS.pdf PDF
2013_CDRLs_RMS_Support.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Irem) OM8 No. 0704-0188

The public reporting burden for ,this.collection of information is estimated to average 110 hO""$ per response, including the time for reviewing instructions, searching existing data sourCIIS, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704·0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subjeet to any penalty for failing to comply with a collection of information if it does not di$p!ay a currently valid OMS control number. Please do not return your form to the llbove orgllnizlltion. Send completed form to the Government Issuing Contracting Officer for the ContrllctlPR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TOP TM OTHER MGMT

o. SYSTEM/ITEM I E. CONTRACT/PR NO. F. CONTRACTOR T-38 FEM Phase X Northrop Grumman Corp.

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A039 Contractor's Progress, Status and Management Report

4. AUTHORITY (Oat" Acquisition Document No.) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-80227 BLK 16 AFLCMCIWLDMB

7.00250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

REQUIRED QRTLY BLK 16LT b. COPIES,. APP COOE 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final

N/A D SUBMISSION Draft BLK 16 BLK 16 R" Repro

16. REMARKS AFLCMCIWLDMB I

Block 5: PWS paragraph's: 4.3.1.1,4.3.1.1.3, 4.3.1.2.1, 4.3.1.2.3, 4.3.2.1, 4.3.2.2, 4.3.5.2, 6064 DOQwood Avc.

5.2.2, Atch. 2 Bldg 1254

Hill AFB, UT

Block 9: Distribution Statement D: Distribution authorized to Department of Defense 84056-5816

(000) and U.S. DoD contractors for administrative or operational use, determined 7 AUn: Vivian Hughes

February 2013. Other requests for a copy of this document shall be referred to

AFLCMC/WLDMB.

Warning: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, D.S.C., Sec 2751 et seq.) or Executive Order 12470.

Violations of these export laws are subject to severe criminal penalties.

The above Distribution Statement and Warning Notice shall be displayed or affixed to the data in a conspicuous position.

Block's 10, 11, 12, and 13: The Contractor's Progress, Status and Management Report shall be delivered 90 days ARO and quarterly thereafter. Final deliverables are due 12 months ARO contract award. One copy of final report shall be submitted in electronic form in both Microsoft Word for Windows and Adobe Acrobat (.PDF) format to the T-38 ASIP Manager

@ AFLCMCIWLDEJ.

15. TOTAL I 0 1 0

G. PREPARED BY H.OATE

'ZED BY A y.J!::;:/ J.DATE

~~'t:, .

Deanne Browning

~ 7 Feb 2013 . /r/Pr 7F<?.J,13

17. PRICEGROUP

1B. ESTIMATED

TOTAL PRICE

DO FORM 1423-1. FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional7.0 f1 Data Item} OM8 No. 0704·0188

The public reporting burden for this collection of information is estimated to average 110 hours per ,,,,spansI'!, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the colll'!ction of information. Send comments f6garding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of O.hmse, Executive Services Directorilte {07Q4-0188). Respondents should be aWllre that notwithstanding any other provision of law, no person shall be subject to any penalty fo' failing to comply with a collection of information if it doO!~not di~play a currently valid OMS control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contr2lct/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TOP TM OTHER MGMT

O. SYSTEMIITEM I E. CONTRACT/PR NO. F.CONTRACTOR

T-38 FEM Phase X Northrop Grumman Corp.

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A040 Status Report

4. AUTHORITY (DMa Acquisition Document No.) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE .

Dl-MGMT-80368A BLK 16 AFLCMCIWLDMB

7. DO 250 REQ 9. OIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION '4. DISTRIBUTION

REQUIRED BLK 16 BLK 16LT b. COPIES

a. APP CODE ". AS OF DATE ". DATE OF SUBSEQUENT a. ADDRESSEE Final

N/A 0 SUBMISSION Draft BLK 16 BLK 16 R., Repro

16. REMARKS AFLCMCIWLDMB 1

Block 5: PWS paragcaph's: 4.3.1.1, 4.3.1.2.2, 4.3.2.2, 5.2.2, Atch. 2 6064 DogwoodAve.

Bldg 1254 Block 9: Distribution Statement D: Distribution authorized to Department of Defense HillAFB,UT (DoD) and U.s. DoD contractors for administrative or operational use, determined 7 84056·5816 February 2013. Other requests for a copy of this document shall be referred to Ann: VivianHughes

AFLCMC/WLDMB.

Warning; This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.c., Sec 2751 et seq.) or Executive Order 12470.

Violations of these export laws are subject to severe criminal penalties.

The above Distribution Statement and Warning Notice shall be displayed or affixed to the data in a conspicuous position.

Block's 10, II, 12, and 13: The Contractor's Progress, Status and Management Report, Technical Status reports on the T-38 FEM program's progress shall be delivered 90 days ARO and quarterly thereafter. Performance and Cost report shall be delivered 30 days ARO and monthly thereafter. Final deliverables are due 12 months ARO contract award. One copy of final report shall be submitted in electronic form in both Microsoft Word for Windows and Adobe Acrobat (.PDF) format to the T-38 ASIP Manager@

AFLCMCIWLDEJ.

15. TOTAL I 0 1 0

G. PREPARED BY H.OATE IZVEDBY

J. DATE.

7Fe~/S Deanne Browning

7Feb2013 /7L-

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

DO FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 7.0

(1 Data Item) OMB No. 0704·0188

The public reporting burden lor this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondenu should be aWilre that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the ebove organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINEITEMNO. B. EXHIBIT C. CATEGORY:

A TOP TM OTHER MISC

O. SYSTEMIITEM I E_ CONTRACT/PR NO. F.CONTRACTOR

T-38 FEM Phase X Northrop Grumman Corp.

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A045 Technical Report - Study/Services

4. AUTHORITY (Data Acquisition Document No,) I 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MISC-80508B BLK 16 AFLCMCIWLDMB

7.00250 REa 9. DIST STATEMENT 10. FREQUENCY ".DATE OF FIRST SUBMISSION ,•. DISTRIBUTION

REQUIRED 1 TIME BLK 16LT b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final

N/A D SUBMISSION Draft BLK 16 BLK 16 R., Repro

16. REMARKS AFLCMCIWLDMB 1

Block 5: PWS paragraph's: 4.3.1.1,4.3.1.1.2,5.2.2, Atch. 2. 6064 DogwoodAve.

Bldg 1254 Block 9: Distribution Statement D: Distribution authorized to Department of Defense Hill AFB, UT (DoD) and U.S. DoD contractors for administrative or operational use, determined 7 84056-5816 February 2013. Other requests for a copy of this document shall be referred to Attn: VivianHughes

AFLCMC/WLDMB.

Warning: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, V.S.c., Sec 2751 et seq.) or Executive Order 12470.

Violations of these export laws are subject to severe criminal penalties.

The above Distribution Statement and Warning Notice shall be displayed or affixed to the data in a conspicuous position.

Block's 10, I 1,12, and 13: The Technical Report: The Final shall be delivered 12 months ARO: Entitled - T-38 Aircraft FEM - Phase X Report. One copy of final report shall be submitted in electronic form in both Microsoft Word for Windows and Adobe Acrobat (.PDF)·format to the T-38 AS!P Manager@AFLCMC/WLDEJ.

15. TOTAL ~ 0 1 0

G. PREPAREDBY H.OATE I.ZEOBY /

J.OATE

7Feb/5- 7 Feb 2013 .r/Deanne Browning

"~T~. ~P.Rl~C"E~G~R~O~U;;P'

~'~8~.~ES~T~I~M~A~T~ED;:--1

TOTAL PRICE

DO FORM 1423-1, FEB 2001 PREVIOUS.EDITIONMAY BE USED. Page of Pages

(1 Data Item) OM8 No. 0704-0188

The public reporting burden for this colleetion of information is <'!stimated to average 110 hours per response, includin!il the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the ContrllctlPR No. listed in Block E.

A. CONTRACTLINEITEMNO. B. EXHIBIT C. CATEGORY:

A TOP TM OTHER MCCR

D. SYSTEM/ITEM IE. CONTRACT/PRNO. F.CONTRACTOR

T-38 FEM Phase X Northrop Grumman Corp.

1. DATA ITEM NO. 2. TiTlE OF DATA lTEM 3. SUBTITLE

A090 Computer Software Product End Items

4. AUTHORITY (Data Acquisition Document No.) 15. CONTRACT REFERENCE •.REQUIRING OFFICE

DI-MCCR-80700 BLK 16 AFLCMCIWLDMB

7. DO 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

REQUIRED 1 TIME BLK 16LT b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final

N/A D SUBMlSSION Draft BLK 16 BLK 16 R" Repro

16. REMARKS AFLCMCIWLDMB 1

Block 5: PWS paragraph's: 4.3.1.1,4.3.1.1.1, 4.3.1.1.2, 5.2.1, Atch 2. 6064 DogwoodAve.

Bldg 1254 Block 9: Distribution Statement D: Distribution authorized to Department of Defense Hill AFB, UT

(000) and U.S. 000 contractors for administrative or operational use, determined 7 84056-5816 February 2013. Other requests for a copy of this document shall be referred to Ann: VivianHughes

AFLCMC/WLDMB.

AFLCMCIWLDEJ 1

Warning: This document contains technical data whose export is restricted by the Arms 6057 Box Elder Lane Export Control Act (Title 22, V.S.C., Sec 2751 et seq.) or Executive Order 12470. B1dg1285 Violations of these export laws are subject to severe criminal penalties. HillAFB, UT

84056·5811

IThe above Distribution Statement and Warning Notice shall be displayed or affixed to the Attn: Mike Blinn data in a conspicuous position.

I Block's 10, 11, 12, and 13: The Computer Software Product End Items: The Final shall be

Idelivered 12 months ARO: 1. Entitled - T·38 Aircraft Idealization FEM on CD-ROM- Phase X (updated version). 2. Entitled - T-38 Aircraft Validation Model- Phase X (updated

Iversion).

I

15. TOTAL , 0 2 0

G. PREPAREDBY H. DATE

IZEDB/W'~

J.DATE

1::::,,-_\':::, - 7/f,E/3 Deanne Browning

7 Feb 2013 , F /V r,'~7-.••R","C'" :;G~R"O;;U;;P'

~,~.~. ~ES~T~IM::-:A~T'~O::--i

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUSEDITIONMAY BEUSED. Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DaD 5010. 12-M for detaHed instructions.)

FOR THE CONTRACTOR

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (Xl appropriate category: TOP - Technical Data Package;

TM Technical Manual; Other other category of data. such as ~Provisjoning•••••Configuration Management." etc.

Item D. Enter name of systemlitem being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in aher contract award).

Item G. Signature of preparer of CORL.

Item H. Date CORLwas prepared.

Item I. Signature of CORLapproval authority.

Item J. Date CDAL was approved.

Item 1. See 000 FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in 0005010.1 2-L (AMSDLl, or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. 0000 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are; Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

DD FORM 1423-1 (BACK), FEB 2001

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DO Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production. development, testing, and administration) but which is required by 00 Form 1423.

Estimated Price - Costs to be included under Group I ar-e those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation. control, or quality of the data item.

Estimated Price· Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements. and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition· Data which the contractor must develop for his internal use in performance of the primiuy contracted effort and does not require any substantial change' to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation. control. and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the 00 Form 1423 at no cost.

Item 18. For each data item. enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. - These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

File details come from the government source that posted it. Updated .