Form_260_FEB_10_2016.pdf

PDF 94 KB Posted

Attached to
HIGH IMPACT TRANSDUCER - HIT Federal contract opportunity
Solicitation number
FA8206-15-R-01015
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

AFMC IMT 260 DATED 10 FEB 2016

View the file

Other files for this federal contract opportunity

Other files attached to HIGH IMPACT TRANSDUCER - HIT, newest first.
File Type Posted
Redacted_J A.pdf PDF
FA820615R010150004.pdf PDF
FA820615R010150003.pdf PDF
FA820615R010150002.pdf PDF
CDRL_1423.pdf PDF
FA820615R010150001.pdf PDF
Form_260_Jan_13_2016.pdf PDF
FA8206-15-R-01015.pdf PDF
FRIST_ARTICLE_HIT.pdf PDF
PACKAGING_REQUIREMENS_HIT.pdf PDF
SOW_APR_5_2014_HIT.pdf PDF
ENGINEERING_DATA_LIST_REV_10.pdf PDF
TRANSPORTATION_DATA.pdf PDF
FORM_462_ENGINEERING_DATA_ATTACH_A_FIRST_ARTICLE.doc DOC document
Manufacturing_Source_Qualification_Statement.pdf PDF
CDRL_HIT_JUNE_24 _2015.pdf PDF
SPECIAL_PACKAGING_INSTRUCTIONS_HIT.pdf PDF
ITEM_DESCRIPTION.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRST ARTICLE REQUIREMENTS 1. DATE

10 FEB 2016(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)

2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER

23991 / 47A528109P5

4. NSN

1135012519017NP

5. FIRST ARTICLE QUANTITY

THE FIRST ARTICLE IS 1 UNIT(S) OF LOT / ITEM Each

AND WILL BE: X PART OF PRODUCTION QUANTITY IN ADDITION TO PRODUCTION QUANTITY

6. ARTICLES

WILL X WILL NOT SERVE AS A MANUFACTURING STANDARD

7. LONG LEAD TIME ITEMS

REQUIRED X NOT REQUIRED

(See FAR 52.209-3 OR -4, alternate II)

8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)

REQUIRED X NOT REQUIRED

"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."

9. TEST / INSPECTION REQUIREMENTS

A. X CONTRACTOR TESTING

GOVERNMENT TESTING

Performance or other characteristics which the First Articles must meet are

In drawing 47A528109 and subtier engineering documents.

B. The detailed technical requirements for First Article approval tests are contained in

In drawing 47A528109 and subtier engineering documents.

(Cite Spec and Para number)

C. TEST PLAN REQUIRED

Number of days for government approval / disapproval days.

D. Contractor's notification to ACO and

414 SCMS Engineering

(Requesting Activity) of test time and location due 30 days prior to start of testing.

E. X TEST REPORT REQUIRED

(1) Forwarded to

809 MXSS/MXDEB (DODACC: FB2029)

Bldg 849, Attn: Non-Accountable Bay

Mark For: First Article Do Not Post

Hill AFB, UT 84056-5713

(2) Government written notice of approval / disapproval due 180 days after receipt of contractor's report.

F. FIRST ARTICLE DELIVERY

(1) Due within 220 calendar days from date contract.

(2) Notify 30 calendar days prior to shipment.

(3) Delivered to government at

809 MXSS/MXDEB (DODAAC: FB2029)

Bldg 849, Attn:Non-Accountable Bay

Mark For: First Article Do Not Post

Hill AFB, UT 84056-5713

(Set Forth Consignee and Address)

(4) Government written notice of approval / disapproval within 180 days after receipt of first article package.

G. Estimated cost of government testing / inspection evaluation.

$0.0000

Page 1 of 2AFMC IMT 260, 20020830, V-3 Version 4Generated by PRPS using Jasper Reports on 10 Feb 2016

FIRST ARTICLE REQUIREMENTS 1. DATE

10 FEB 2016(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)

10. DISPOSITION OF FIRST ARTICLES

X Approved First Articles will be forwarded to

Supply

(insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.

First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.

X Disapproved First Articles will be returned to the contractor

X will be retained by FAI pending disposition instructions from the contractor.

On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).

a. Approved First Articles will be returned to the contractor for shipment with production item.

b. Disposition of disapproved First Articles will remain the same as marked above.

Other Disposition:

11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL

a. Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, DoD, Air Force.

b. X Offerors currently in production of the same or similar article for a X Government, DoD, Air Force contract and who have received First Article approval under the existing contract.

c. Offerors who have previously furnished production quantities of the same or similar articles to the Government, DoD, Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.

d. X Provided not more than 24 months have elapsed since completion of the contract.

e. First Article testing will not be waived.

f. See Remarks in block 12 below.

NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:

A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION

12. REMARKS

Jensen, Megan KNAME: 13 JAN 2016DATE:

Testing will be completed at contractor facility, including a fit check. The first article will be forwarded to 809 MXSS/MXDEB (DODAAC: FB2029), Bldg 849, Attn: Non- Accountable Bay, Mark For: First Article Do Not Post, Hill AFB, UT 84056-5713 within 15 days of the completion of testing at contractor facility.

13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING TEST

(Name, Organization, Phone)

Jensen, Megan Keddington

414 SCMS / GUEA

801-777-2954

777-2954

14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING

TEST (Name, Organization, Phone)

Jensen, Megan Keddington

414 SCMS / GUEA

801-777-2954

777-2954

Page 2 of 2AFMC IMT 260, 20020830, V-3 Version 4Generated by PRPS using Jasper Reports on 10 Feb 2016

File details come from the government source that posted it. Updated .