CDRL_1423.pdf

PDF 168 KB Posted

Attached to
HIGH IMPACT TRANSDUCER - HIT Federal contract opportunity
Solicitation number
FA8206-15-R-01015
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

CDRL 1423 DATED JAN 6 2016

View the file

Other files for this federal contract opportunity

Other files attached to HIGH IMPACT TRANSDUCER - HIT, newest first.
File Type Posted
Redacted_J A.pdf PDF
FA820615R010150004.pdf PDF
FA820615R010150003.pdf PDF
Form_260_FEB_10_2016.pdf PDF
FA820615R010150002.pdf PDF
FA820615R010150001.pdf PDF
Form_260_Jan_13_2016.pdf PDF
FA8206-15-R-01015.pdf PDF
FRIST_ARTICLE_HIT.pdf PDF
PACKAGING_REQUIREMENS_HIT.pdf PDF
CDRL_HIT_JUNE_24 _2015.pdf PDF
SPECIAL_PACKAGING_INSTRUCTIONS_HIT.pdf PDF
ITEM_DESCRIPTION.pdf PDF
SOW_APR_5_2014_HIT.pdf PDF
ENGINEERING_DATA_LIST_REV_10.pdf PDF
TRANSPORTATION_DATA.pdf PDF
FORM_462_ENGINEERING_DATA_ATTACH_A_FIRST_ARTICLE.doc DOC document
Manufacturing_Source_Qualification_Statement.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

Untitled

1_DATA_ITEM_NO: A001
2_TITLE_OF_DATA_ITEM: Test Inspection Report
3_SUBTITLE: First Article
4_AUTHORITY_Data_Acquisit: DI-NDTI-80809B
5_CONTRACT_REFERENCE:
6_REQUIRING_OFFICE: 414 SCMS/GUEA
7_DID_250_REQ: DD
8_APP_CODE: A
DIST_STATEMENT: D
10_FREQUENCY: ONE/R
11_AS_OF_DATE: N/A
12_DATE_OF_FIRST_SUBMISSI: See Block 16
13_DATE_OF_SUBSEQUENT_SUB: N/A
addressee1: 809 MXSS/MXDEB
draft1:
reg1: 1
repro1:
addressee2: 414 SCMS/GUEA
draft2:
reg2: 1
repro2:
addressee3: See Block 16
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_repro: 0
16_REMARKS: Block 9: Data submittal shall be marked with the following on the cover page:DISTRIBUTION STATEMENT D: Distribution authorized to DOD and U.S. DOD contractors only for Intercontinental Ballistic Missiles (ICBM) administrative or operational use determined as of 6 Jan 2016. Other requests shall be referred to AFNWC/NWIBF, Hill AFB, UT 84056-5816.

WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2778 et seq.) or the Export Administration Act of 1979, as amended, Title 50, USE., App. 2401 et seq. Violations of these export control laws is subject to severe criminal penalties. Dissemination of this document is controlled under DOD Directive 5230.25.

DESTRUCTION NOTICE: For classified documents, follow procedures in DOD 5220.22-M, National Industry Security Manual, Chapter 5, Section 7, Para 5-704, or DOD 5200.1-R, Information Security Program Regulation, Chapter 6, Para C6.7. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

Block 10: Report shall be submitted concurrently with the "First Article" item either in the shipping container or separately if the report will not fit within the container unfolded. When shipped in the "First Article" container, report shall be enclosed in a paper or plastic envelope. NOTE: If report is shipped separate from the "First Article" send to Block 14 addressee.

Block 12: Report shall be submitted with the "First Article" within 15 days of completion of testing at contractor facility. See AFMC Form 260.

Block 14: Complete mailing address is:

809 MXSS/MXDEB (DODAAC: FB2029)

Bldg 849, Attn: Non-Accountable Bay Dear John Bay (Mark For: FAI/Test) Hill AFB, UT 84056-5713

Attn: Megan Keddington Jensen

414 SCMS/GUEA

6031 Gum Lane, Bldg 1227 Hill AFB, UT 84056-5838

FOB DESTINATION

INSPECTION/ACCEPTANCE DESTINATION

17_PRICE_GROUP:
ESTIMATED_TOTAL_PRICE:
G_PREPARED_BY:
H_DATE: 6 Jan 2016
1_APPROVED_BY: Tom Fronberg
J_DATE: 6 Jan 2016
Page: 1
reg38t: 2
A_CONTRACT_LINE_ITEM_NO:
B_EXHIBIT:
TDP:
TM:
OTHER:
DSYSTEMITEM: P/N 47A528109P5 NIIN: 01-251-9017
E_CONTRACTPR_NO: FD20201401015
FCONTRACTOR:
of_pages: 1
Reset:
2016-01-06T13:04:42-0700
JENSEN.MEGAN.KEDDINGTON.1395796387

File details come from the government source that posted it. Updated .