Question_2.docx

DOCX document 13 KB Posted

Attached to
Demolition of Building 830 Federal contract opportunity
Solicitation number
FA8201-15-C-DEMO
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Follow up Question posted for information purposes only

View the file

Other files for this federal contract opportunity

Other files attached to Demolition of Building 830, newest first.
File Type Posted
Bldg._830_Q_and_A.docx DOCX document
Amendment_0004.pdf PDF
01_35_26_Government_Safety_Requirements.docx DOCX document
01_32_00_Project_Schedule.docx DOCX document
01_57_20_Environmental_Protection.docx DOCX document
01_00_00_General_Requirements.docx DOCX document
Bldg._830_Q_and_A.docx DOCX document
FA820115R000700003.pdf PDF
Site_Restoration.pdf PDF
Site_Grading.pdf PDF
SOW-Building_830_29_Apr_15.pdf PDF
Amendment_0002.pdf PDF
STATEMENT_OF_WORK-Building_830.pdf PDF
Amendment_0001.pdf PDF
SITE_WALK_ROSTER.pdf PDF
Bldg_830_Solicitation.zip ZIP file
FA8201-15-R-0007.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. In reference to the following statements, Is it the intent of the government to “salvage” the existing electrical equipment in the building?"

"3.1.19.1 Fixtures Electrical fixtures shall be inventoried and removed as complete units and presented for reuse by base utility operations first and then processed for recycle or salvage through an authorized dealer/recycle center.

3.1.19.2 Electrical Devices Electrical devices shall be inventoried, stored, and resold or recycled through an electrical recycle/resale center.

Is it the intent of the government to “salvage” the existing electrical equipment in the building?"

A: The contractor will not be required to 'DECONSTRUCT' anything left behind when they commence demolition. All recycling efforts of any materials the government desires will be done so prior to contractor award.