Revised_Contractor_Questions_and_Addendum_Items.pdf

PDF 405 KB Posted

Attached to
Repair of Bldg 1/1A Federal contract opportunity
Solicitation number
FA8201-15-B-0003
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Revised Contractor Questions and Addendum Items

View the file

Other files for this federal contract opportunity

Other files attached to Repair of Bldg 1/1A, newest first.
File Type Posted
Revised_Drawing_AE610.pdf PDF
Revised_Drawing_AD101.pdf PDF
FA8201-15-B-0003_Amend_0005.pdf PDF
FA8201-15-B-0003_Amend_04.pdf PDF
Sabol_ _Rice _Inc_equipment_approval.pdf PDF
Revised_Specification_Section_01_33_00_Submittal_Procedures.pdf PDF
Bldg_1A_Free_Zone.pdf PDF
FA8201-15-B-0003_Amend_0003.pdf PDF
Revised_Specification_Section_01_11_00_Summary_of_Work.pdf PDF
Contractor_Questions_and_Addendum_Items.pdf PDF
SSCO_Lighting_equipment_approval.PDF PDF
Revised_Drawing_AE601.pdf PDF
Pavement_Markings.pdf PDF
JRC_Lighting_equipment_approval.pdf PDF
Revised_Specification_Section_02_41_00_Demolition.pdf PDF
Revised_Schedule_of_Drawings.pdf PDF
Amendment_FA8201-15-B-0003-0002.pdf PDF
Site_Visit_Attendance_Sheets.pdf PDF
Specifications_(6th_portion).zip ZIP file
Specifications_(10th_portion).zip ZIP file
Specifications_(9th_portion).zip ZIP file
Specifications_(2nd_portion).zip ZIP file
Specifications_(1st_portion).zip ZIP file
Specifications_(3rd_portion).zip ZIP file
Specifications_(7th_portion).zip ZIP file
Specifications_(8th_portion).zip ZIP file
Specifications_(4th_portion).zip ZIP file
Specifications_(5th_portion).zip ZIP file
Amendment_FA8201-15-B-0003-01.pdf PDF
Civil_Drawings.zip ZIP file
Attachments_1-15.zip ZIP file
Mech_Drawings.zip ZIP file
Arch_Drawings.zip ZIP file
Structural_Drawings.zip ZIP file
General_Drawings.zip ZIP file
Elec_Drawings.zip ZIP file
FA8201-15-B-0003.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SBSA

PROJECT TITLE:

Repair Bldg 1/1A, (WSEP) Major Renovation, DUFF Vault, Annex

KRSM148028, wo 57673

DATE: 3 September 2015

Contractor Questions and Addendum items

No. Spec/doc Drawing Question

1)

EY502

Drawing did not print correctly. Will new drawing be issued? Response: Not at this time. Bid the document as provided.

2) List of drawings, 01 11 00

4 drawings missing from the list they are EP201, EP502, EP503, & EP504. Total number of drawings 140, will the schedule of drawings be corrected to match the index on sheet G002? Response: The schedule of drawings has been revised see attached.

3) Fa8201-15-b-

0003-0001

Amendment doesn't indicate the number of copies to include I'm going with one will there be an amendment issued to correct? Response: No amendment, one copy is correct.

4)

AE101

Door 120I, out of mass briefing room at NW corner, and 119 exiting on the north wall don't appear to be

STC rated doors. The door schedule on sheet ae601 list the door type as "D" and frame 4. Are these door supposed to be STC rated (??)? Will a corrected drawing be issued? Response: Six doors have been incorrectly labeled on the door schedule AE601. See attached revised AE601.

5) 01 11 00 AE001

Sequences in spec section do not match sequence on drawing. Which is correct? Will the rule that the specification takes priority rule? Response: The Specifications and the plans should now match. The

Repair Bldg 1/1A, (WSEP) Major Renovation, DUFF Vault, Annex

KRSM148028, wo 57673 drawing package is correct.

6)

Existing as built drawings

Are existing as built drawings available? Can they be provided? Response: As-built drawings may be provided to the awardee if deemed necessary by the contracting officer. Providing the As-built drawings at this time provides no value added.

7) 01 11 00

This specification section has a lot of design instructions; from this are we to infer that there is a design effort? It was stated that this is a 100% design.

Response: This project is 100% designed. The design instruction was left in to provide clarity if addition design is required.

8) 01 11 00

Spec section 01 11 00 para 1.2 -- sequence time line sequence 1 states that the GOV is doing the demo and asbestos removal. Response: All Asbestos abatement, Lead abatement and Demolition are by the Contractor.

See attached replaced Specification section 01 11 00

Summary of work.

9) 01 11 00

Spec section 01 11 00 para 1.2 -- sequence time line sequence 2 states that the GOV is doing the asbestos removal. Response: All Asbestos abatement, Lead abatement and Demolition are by the Contractor. See attached replaced Specification section 01 11 00

Repair Bldg 1/1A, (WSEP) Major Renovation, DUFF Vault, Annex

KRSM148028, wo 57673

10) 01 11 00

Spec section 01 11 00 para 1.2 sequence time line sequence 2 note: states that march 25 2016 is the final completion then refers to sequence 1. Response: See attached replaced Specification section 01 11 00

11) 01 11 00

Pages 2 - 6 down to Civil / Landscape provides

Architectural Design information. Are we to take away for this information that there is no construction statement of work (SOW) and that the drawings are the statement of work? Response: Yes the Design;

Specification, Plans, Basis of Design and Cut sheets are the Statement of Work.

12) 01 11 00

Page 7 structural states we are to perform a simple seismic structural evaluation of the building. Then continues to list design requirements for the canopies over the exterior doors are we to take away for this information that there is no construction statement of work (SOW) and that the drawings are the statement of work? Response: The plans specifications, basis of design, cut sheets and all documents provided are to be considered the Contract documents and used accordingly. Seismic code must be followed.

13) 01 11 00

Pages 8 - 12 mechanical lists existing conditions but doesn't describe the work to be accomplished are we to take away for this information that there is no construction statement of work (SOW) and that the drawings are the statement of work? Response: Yes the Design; Specification, Plans, Basis of Design and Cut

Repair Bldg 1/1A, (WSEP) Major Renovation, DUFF Vault, Annex

KRSM148028, wo 57673 sheets are the Statement of Work.

14) 01 11 00

Pages 12- 13 electrical lists design requirements but not the work to be performed by the contractor. Are we to take away for this information that there is no construction statement of work (SOW) and that the drawings are the statement of work? Response: Yes,

15) 01 11 00

Pages 14 electrical lists design requirements but not the work to be performed by the contractor. Are we to take away for this information that there is no construction statement of work (SOW) and that the drawings are the statement of work? Response: Yes, the Design; Specification, Plans, Basis of Design and Cut

16) 01 11 00

Page 24 are we providing the ALIS server racks are we to take away for this information that there is no construction statement of work (SOW) and that the drawings are the statement of work? Response: Yes, Repair Bldg 1/1A, (WSEP) Major Renovation, DUFF Vault, Annex

KRSM148028, wo 57673

17) 01 11 00 / basis of design

The specification section and the basis of design are identical. Are we to take away for this information that there is no construction statement of work (SOW) and that the drawings are the statement of work?

Response: Yes the Design; Specification, Plans, Basis of

Design and Cut sheets are the Statement of Work.The

Basis of design is informational.

18) SBSA sow

States that the contractor is to photo document the site, buildings, with documentation of description.

Given the sensitive nature of this project

(classification) is this still going to be a requirement?

Response: Yes, after the Contractor takes possession of the portions of the facility affected by the work the security manager will instruct the Contractor and review photos prior to distribution. Photo documentation of the project is required.

19) Sign in sheet

Is a copy of the site visit sign in sheet going to be made available to the attendees? Response: Yes.

20) Per section 01-00-00 paragraph 1.3.3 please clarify the designer of record will be approving submittals. Response: The CE representative and the CO will review and accept submittals not the A-E designer of record.

21) It was mentioned (and is a good idea) of a free zone being put on the west side of the building.

Please confirm this will be the case, as it is most important for material removal of demolition in the courtyard. If a free zone is established will this contractor be the one installing or will it be others.

Response: The Contractor will be responsible for installing the free zone barrier. See attached sketch and requirements and item below.

Repair Bldg 1/1A, (WSEP) Major Renovation, DUFF Vault, Annex

KRSM148028, wo 57673

22) Where may the contractor place trailers for storage and office for project?

Response: The Contractor will have limited parking available however the Facility Manager, Unions and User will make accommodation for a minimal allocation of space after award.

23) Specification section 01 33 00 paragraph 1.2 “Web-Based Submittal Tracking” is required. This specification has been in other projects on base and not required. Please confirm the requirement of this system so all bidders are on equal footing. Is this specification refereeing to a product such as submittal exchange. It is my understanding that Prolog, Expedition etc. does not meet this specification.

Please confirm. Response: The specification paragraph 2 provides flexibility regarding projects size and complexity. The determination will not occur until the Contractor begins executing the project. If the Contractors process is deemed unsatisfactory by the CO then a more robust system may be required?

Other Web Based products will be allowed after approved by the CO.

24) Do you have any pictures that will be placed in the Q&A? Response: No.

25) Will you publish the attendees at the bid walk list in an addendum or the Q&A. Response:

Completed

26) In the Statement Of Work page 23 it lists the Asbestos Abatement and on page 24 it lists the LBP Abatement. Spec section 01 11 00 “Summary of Work” part 1.2 “Summary” item “Sequence Timelines” states on both sequence 1 and sequence 2 “Demolition and abatement (by the government).” Who is responsible for abatement? Response: The Demolition and abatement is by the Contractor.

27) Spec section 02 41 00 Part 1.2.1 Item “Sequence 1 (one) time line begins” it states “Demolition and abatement (by the government) from August 31, 2015 through November 13, 2015.” Am I to understand that the government will be doing all demolition and abatement and that the project will be turned over to the contractor on November 13, 2015? Response: The Demolition and abatement is by the Contractor.

28) Spec section 01 00 00 Part 1.7.1 Item A states “Hill Air Force Base working hours (0730 to 1600 Hours, Monday through Thursday exclusive of Fridays, Saturdays, Sundays, and holidays” Due to the tight schedule it may be necessary to work longer shifts and/or weekends. Can working hours begin earlier than 0730? Can working hours end later than 1600? Can work be scheduled on Fridays and Saturdays? Response: Yes the GOV will make arrangements to support the contractors proposed work schedule. The Contractor must provide a written schedule at least 2 two weeks in advance beyond the normal work hours to schedule GOV personal availability to support the sub-task. The revised hours will be 0600 – 1800 Monday through Thursday. Regardless special arrangements may be available for work

Repair Bldg 1/1A, (WSEP) Major Renovation, DUFF Vault, Annex

KRSM148028, wo 57673 on Friday and Saturdays. The Contractor must provide a written schedule at least 2 two weeks in advance beyond the normal work hours to schedule GOV personal availability to support the sub-task.

29) Specification 05 12 00 requires and AISC certified shop. This is extreme overkill for this project please confirm. Response: Follow the specification as provided, no exceptions.

30) Can we get a picture of the branch controller and the model # plate in office 218? Response: Not at this time.

31) Are there as-build drawings for the mechanical system of the 2nd floor, area B? Response: No, use drawings provided.

32) The mechanical drawings do not reference the location of the VRF heat pump condensing units.

Where will these units be located? Response: No, use drawings provided. The VRF is shown on sheet

MH101A.

33) The Fire alarm system is Class B. Response: Yes the Fire alarm system shall be Class B. Disregard any notes referring to Class A in the plans or specification.

34) Find attached “Bldg 1A Free Zone” map. The purpose of the map is to generally describe a possible configuration for access to the construction area the Contractor will use to mitigate FOD hazard on the Airfield. Full responsibility is with the Contractor to follow ETL 04-02, “Standard Airfield Pavement Marking Schemes”, attached. The requirement includes creating a free zone includes purchase or rental and placement of low profile flashing barricades. An example of the required equipment can be found at https://www.airportnac.com/airport-barricades. The Contractor is responsible for final configuration and installation of the barricades including quantity and placement. The barricades must be placed end to end with no space between to mitigate FOD on the airfield. The Contractor must provide a means and method to clean the free zone path such as a crew with brooms or a vacuum sweeper truck. The frequency of cleaning will be determined by the contractor’s ability to limit FOD while traveling through the free zone. Frequency of cleanup of FOD must be treated as a very high priority to limit damage to any aircraft in the area. Gate access and control by an individual gate guard provided by the contractor is required to allow access to the free zone and accomplish FOD checks. The contractor may choose an alternative method of escort and airfield drivers’ licenses for equipment operators reducing the configuration of the free zone however must receive GOV approval via a submittal prior to proceeding.

35) Contractor must take the height of the second story bridge into account for access to the west yard as shown on sheets C101, CD101 and CG101. The clear height is approximately https://www.airportnac.com/airport-barricades

Repair Bldg 1/1A, (WSEP) Major Renovation, DUFF Vault, Annex

KRSM148028, wo 57673

39) The GOV will make accommodation to support multiple shift work. Response: Yes.

40) 252.236-7005 AIRFIELD SAFETY PRECAUTIONS. (DEC 1991)

a) Definitions. As used in this clause --

(1) "Landing areas means" --

(i) The primary surfaces, comprising the surface of the runway, runway shoulders, and lateral safety zones. The length of each primary surface is the same as the runway length. The width of each primary surface is 2,000 feet (1,000 feet on each side of the runway centerline);

(ii) The "clear zone" beyond the ends of each runway, i.e., the extension of the primary surface for a distance of 1,000 feet beyond each end of each runway;

(iii) All taxiways, plus the lateral clearance zones along each side for the length of the taxiways (the outer edge of each lateral clearance zone is laterally 250 feet from the far or opposite edge of the taxiway, e.g., a 75-foot-wide taxiway would have a combined width of taxiway and lateral clearance zones of 425 feet); and

(iv) All aircraft parking aprons, plus the area 125 feet in width extending beyond each edge all around the aprons.

(2) "Safety precaution" areas means those portions of approach-departure clearance zones and transitional zones where placement of objects incident to contract performance might result in vertical projections at or above the approach-departure clearance, or the transitional surface.

(i) "The approach-departure clearance surface" is an extension of the primary surface and the clear zone at each end of each runway, for a distance of 50,000 feet, first along an inclined (glide angle) and then along a horizontal plane, both flaring symmetrically about the runway centerline extended.

(A) The inclined plane (glide angle) begins in the clear zone 200 feet past the end of the runway (and primary surface) at the same elevation as the end of the runway. It continues upward at a slope of 50:1 (1 foot vertically for each 50 feet horizontally) to an elevation of 500 feet above the established airfield elevation. At that point the plane becomes horizontal, continuing at that same uniform elevation to a point 50,000 feet longitudinally from the beginning of the inclined plane (glide angle) and ending there.

(B) The width of the surface at the beginning of the inclined plane (glide angle) is the same as the width of the clear zone. It then flares uniformly, reaching the maximum width of 16,000 feet at the end.

Repair Bldg 1/1A, (WSEP) Major Renovation, DUFF Vault, Annex

KRSM148028, wo 57673

(ii) The "approach-departure clearance zone" is the ground area under the approach-departure clearance surface.

(iii) The "transitional surface" is a sideways extension of all primary surfaces, clear zones, and approach-departure clearance surfaces along inclined planes.

(A) The inclined plane in each case begins at the edge of the surface.

(B) The slope of the incline plane is 7:1 (1 foot vertically for each 7 feet horizontally). It continues to the point of intersection with the --

(1) Inner horizontal surface (which is the horizontal plane 150 feet above the established airfield elevation); or

(2) Outer horizontal surface (which is the horizontal plane 500 feet above the established airfield elevation), whichever is applicable.

(iv) The "transitional zone" is the ground area under the transitional surface. (It adjoins the primary surface, clear zone, and approach-departure clearance zone.)

(b) General. (1) The Contractor shall comply with the requirements of this clause while --

(i) Operating all ground equipment (mobile or stationary);

(ii) Placing all materials; and

(iii) Performing all work, upon and around all airfields.

(3) The requirements of this clause are in addition to any other safety requirements of this contract.

(c) The Contractor shall -

(1) Report to the Contracting Officer before initiating any work;

(2) Notify the Contracting Officer of proposed changes to locations and operations;

(3) Not permit either its equipment or personnel to use any runway for purposes other than aircraft operation without permission of the Contracting Officer, unless the runway is -

(i) Closed by order of the Contracting Officer; and

(ii) Marked as provided in paragraph (d)(2) of this clause;

(4) Keep all paved surfaces, such as runways, taxiways, and hardstands, clean at all times

Repair Bldg 1/1A, (WSEP) Major Renovation, DUFF Vault, Annex

KRSM148028, wo 57673 and, specifically, free from small stones which might damage aircraft propellers or jet aircraft;

(5) Operate mobile equipment according to the safety provisions of this clause, while actually performing work on the airfield. At all other times, the Contractor shall remove all mobile equipment to locations -

(i) Approved by the Contracting Officer;

(ii) At a distance of at least 750 feet from the runway centerline, plus any additional distance; and

(iii) Necessary to ensure compliance with the other provisions of this clause; and

(6) Not open a trench unless material is on hand and ready for placing in the trench. As soon as practicable after material has been placed and work approved, the Contractor shall backfill and compact trenches as required by the contract. Meanwhile, all hazardous conditions shall be marked and lighted in accordance with the other provisions of this clause.

(d) Landing areas. The Contractor shall -

(1) Place nothing upon the landing areas without the authorization of the Contracting Officer;

(2) Outline those landing areas hazardous to aircraft, using (unless otherwise authorized by the Contracting Officer) red flags by day, and electric, battery-operated low-intensity red flasher lights by night;

(3) Obtain, at an airfield where flying is controlled, additional permission from the control tower operator every time before entering any landing area, unless the landing area is marked as hazardous in accordance with paragraph (d)(2) of this clause;

(4) Identify all vehicles it operates in landing areas by means of a flag on a staff attached to, and flying above, the vehicle. The flag shall be three feet square, and consist of a checkered pattern of international orange and white squares of 1 foot on each side (except that the flag may vary up to ten percent from each of these dimensions);

(5) Mark all other equipment and materials in the landing areas, using the same marking devices as in paragraph (d)(2) of this clause; and

Repair Bldg 1/1A, (WSEP) Major Renovation, DUFF Vault, Annex

KRSM148028, wo 57673

(6) Perform work so as to leave that portion of the landing area which is available to aircraft free from hazards, holes, piles of material, and projecting shoulders that might damage an airplane tire.

(e) Safety precaution areas. The Contractor shall -

(1) Place nothing upon the safety precaution areas without authorization of the Contracting Officer;

(2) Mark all equipment and materials in safety precaution areas, using (unless otherwise authorized by the Contracting Officer) red flags by day, and electric, battery-operated, low-intensity red flasher lights by night; and

(3) Provide all objects placed in safety precaution areas with a red light or red lantern at night, if the objects project above the approach-departure clearance surface or above the transitional surface.

41) Equipment approval attached as a part of Addendum 3. SSCO for lighting, JRC for lighting, and

42) The following doors will have a CDX-10 required on five of the following doors, 115A, 119A.1, 119G, 120A, and 120.

Also insert the following in Hardware sets STC-01 only for the doors listed above.

1 EA SECURITY CYPHER LOCK CDX-10 GRY KAB

See attached revised Door schedule sheet # “KRSM – 1A_148028_AE601_r1.

43) 3 Sept 2015 additional clarification

All windows, glazing, frames and anchorage being replaced are blast resistant to the minimum rating per UFC 4-010-01. Specification section 08 51 23 Steel Windows with Integral Blinds indicates that these windows also must meet the same minimum blast resistance as specified in specification section 08 56 53 Blast Resistant Tempered Glass Windows.

Sheet AD101, include demolition removal of windows as required to install new windows.

Sheet AE620/RS1 indicates all windows have roller blinds change with the exception of the window type C does not have roller blinds because they have integral blinds built in between the blast resistant panes see spec section 08 51 23.

Repair Bldg 1/1A, (WSEP) Major Renovation, DUFF Vault, Annex

KRSM148028, wo 57673

Field verification exact window sizes on shop drawing prior to ordering. Solid surface sill shown in detail 1/AE580 are approximately 6” deep, field verify exact requirement and coordinate with final window selection.