Amendment_FA8201-15-B-0003-01.pdf

PDF 87 KB Posted

Attached to
Repair of Bldg 1/1A Federal contract opportunity
Solicitation number
FA8201-15-B-0003
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Amendment 01

View the file

Other files for this federal contract opportunity

Other files attached to Repair of Bldg 1/1A, newest first.
File Type Posted
Revised_Drawing_AE610.pdf PDF
Revised_Drawing_AD101.pdf PDF
FA8201-15-B-0003_Amend_0005.pdf PDF
Revised_Contractor_Questions_and_Addendum_Items.pdf PDF
FA8201-15-B-0003_Amend_04.pdf PDF
Sabol_ _Rice _Inc_equipment_approval.pdf PDF
Revised_Specification_Section_01_33_00_Submittal_Procedures.pdf PDF
Bldg_1A_Free_Zone.pdf PDF
FA8201-15-B-0003_Amend_0003.pdf PDF
Revised_Specification_Section_01_11_00_Summary_of_Work.pdf PDF
Contractor_Questions_and_Addendum_Items.pdf PDF
SSCO_Lighting_equipment_approval.PDF PDF
Revised_Drawing_AE601.pdf PDF
Pavement_Markings.pdf PDF
JRC_Lighting_equipment_approval.pdf PDF
Revised_Specification_Section_02_41_00_Demolition.pdf PDF
Revised_Schedule_of_Drawings.pdf PDF
Amendment_FA8201-15-B-0003-0002.pdf PDF
Site_Visit_Attendance_Sheets.pdf PDF
Specifications_(6th_portion).zip ZIP file
Specifications_(10th_portion).zip ZIP file
Specifications_(9th_portion).zip ZIP file
Specifications_(2nd_portion).zip ZIP file
Specifications_(1st_portion).zip ZIP file
Specifications_(3rd_portion).zip ZIP file
Specifications_(7th_portion).zip ZIP file
Specifications_(8th_portion).zip ZIP file
Specifications_(4th_portion).zip ZIP file
Specifications_(5th_portion).zip ZIP file
Civil_Drawings.zip ZIP file
Attachments_1-15.zip ZIP file
Mech_Drawings.zip ZIP file
Arch_Drawings.zip ZIP file
Structural_Drawings.zip ZIP file
General_Drawings.zip ZIP file
Elec_Drawings.zip ZIP file
FA8201-15-B-0003.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND T IT LE OF SIGNER (T ype or print)

30-105-04EXCEPT ION T O SF 30

APPROVED BY OIRM 11-84

ST ANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to Correct the Bid due date and time in Box 13 of the solicitation and to also change Section J, Specif ications; FROM: (Cover - HAFB Bldg 1&1A) TO: (Cover - 32-31-13).

Except as provided by this solicitation amendment, all terms and conditions of this solicitation remain unchanged and in full force and effect.

1. CONTRACT ID CODE P AGE OF P AGES

J 1 2

16A. NAME AND T IT LE OF CONT RACT ING OFFICER (T ype or print)

16C. DAT E SIGNED

BY

16B. UNIT ED ST AT ES OF AMERICA15C. DAT E SIGNED15B. CONT RACT OR/OFFEROR

(Signature of Contract ing Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONT RACT OR (No., Street , County, State and Zip Code) X FA8201-15-B-0003

X 9B. DAT ED (SEE IT EM 11)

06-Aug-2015

10B. DAT ED (SEE IT EM 13)

9A. AMENDMENT OF SOLICIT AT ION NO.

11. T HIS IT EM ONLY APPLIES T O AMENDMENT S OF SOLICIT AT IONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE P LACE DESIGNATED FOR THE RECEIP T OF OFFERS P RIOR TO THE HOUR AND DATE SP ECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNT ING AND APPROPRIAT ION DAT A (If required)

13. T HIS IT EM APPLIES ONLY T O MODIFICAT IONS OF CONT RACT S/ORDERS.

IT MODIFIES T HE CONT RACT /ORDER NO. AS DESCRIBED IN IT EM 14.

A. T HIS CHANGE ORDER IS ISSUED PURSUANT T O: (Specify authority) T HE CHANGES SET FORT H IN IT EM 14 ARE MADE IN T HE

CONT RACT ORDER NO. IN IT EM 10A.

B. T HE ABOVE NUMBERED CONT RACT /ORDER IS MODIFIED T O REFLECT T HE ADMINIST RAT IVE CHANGES (such as changes in paying office, appropriat ion date, etc.) SET FORT H IN IT EM 14, PURSUANT T O T HE AUT HORIT Y OF FAR 43.103(B).

C. T HIS SUPPLEMENT AL AGREEMENT IS ENT ERED INT O PURSUANT T O AUT HORIT Y OF:

D. OT HER (Specify type of modificat ion and authority)

E. IMPORT ANT : Contractor is not , is required to sign this document and return copies to the issuing office.

14. DESCRIPT ION OF AMENDMENT /MODIFICAT ION (Organized by UCF sect ion headings, including solicitat ion/contract subject matter where feasible.)

10A. MOD. OF CONT RACT /ORDER NO.

U0001

2. AMENDMENT/MODIFICATION NO. 5. P ROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Aug-2015

CODE

OL:H/PZIO

PZIOC MARC MATTSSON

6038 ASPEN AVE B1289NE

HILL AFB UT 84056-5805

FA8201 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/P URCHASE REQ. NO.

CODE

See Item 6

FACILIT Y CODECODE

EMAIL:TEL:

FA8201-15-B-0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 31-Aug-2015 02:00 PM to 08-Sep-2015 03:00 PM.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

ATTACHMENTS

DESCRIPTION PAGES DATE

Statement of Work 18 21 July 2015

Pricing Schedule 1 N/A

Davis Bacon Wage Determination UT150104 01/16/2015 UT104 5 16 Jan. 2015

Base Facility Design Standards 83 29 Jun. 2015

Architectural Compatibility Standards 46 April 2013

Asbestos Survey 9 3 Mar. 2015

LBP Survey 7 30 Mar. 2015

Appendix C 15 2 Mar. 2015

Basis of Design 25 24 Mar. 2015

Cut Sheets 126 30 Mar. 2015

ROOFING REPORT (B1 Report Revised) 44 30 Mar. 2015

Index of Specifications 4 14 Jul. 2015

Specifications (Cover – 32-31-13) 77 27 Mar. 2015

Staging 1 16 Jul. 2015

Schedule of Drawings 3 23 Jul. 2015

DRAWINGS

ARCH (KRSM-1A_148028_AD101 – KRSM-1A_148028_AE640) 39 26 Mar. 2015

CIVIL (KRSM-1A_148028_C101 - KRSM-1A_148028_L101 8 26 Mar. 2015

ELEC (KRSM-1A_148028_EDL111 – KRSM-1A_148028_FA701) 51 26 Mar. 2015

GENERAL (KRSM1-1A_148028_G001 - KRSM1-1A_148028_G005) 5 26 Mar. 2015

MECH (KRSM1-1A_148028-FP101 - KRSM1-1A_148028-PL601) 28 26 Mar. 2015

STRUCTURAL (KRSM1-1A_148028-SB101 - KRSM1-1A_148028-SF502) 9 26 Mar. 2015

(End of Summary of Changes)

File details come from the government source that posted it. Updated .