Amendment 01 - Question_Answers - 20250430.docx

DOCX document 18 KB Posted

Attached to
Magnetic Particle Bench Replacement Federal contract opportunity
Solicitation number
FA813225Q0019
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This document is an Amendment 01 containing Questions and Answers for Solicitation FA813225Q0019 for a Magnetic Particle Inspection Bench Replacement. The Department of the Air Force Materiel Command Air Force Sustainment Center is seeking to purchase five inspection benches: three Model 3509A-01 Magnetic Particle Inspection Benches and two Model 3606 Magnetic Particle Disk Inspection Benches.

Key details include a delivery timeline of on or before September 1, 2025, with the government allowing flexible delivery options including partial shipments. The procurement is for equipment delivery only, with the United States Government responsible for unloading and moving the equipment. Commercial OEM brochures are acceptable for technical submissions, and a standard 12-month parts and labor warranty is satisfactory. Invoicing will be completed through Wide Area Workflow (WAWF) with a Combo D/D Invoice, and no subcontractor identification is required. Packaging must protect the equipment from weather and prevent rust.

View the file

Other files for this federal contract opportunity

Other files attached to Magnetic Particle Bench Replacement, newest first.
File Type Posted
Amendment 03 - Questions_Answers - 20250514.pdf PDF
Amendment 02 - Question_Answers - 20250505.pdf PDF
Attachment 1 - Item Description.pdf PDF
CSS - FA813225Q0019 - Magnetic Particle Bench.pdf PDF
Attachment 2 - Brand Name Letter.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT 01 - 30 April 2025 FA813225Q0019 – Magnetic Particle Inspection Bench Replacement Questions & Answers (in Red font)

1. Delivery timeline – Is the stated requirement of “60 days after receipt of contract” firm, or would the Government entertain a slightly longer lead time if the OEM provides a confirmed production slot?

0. Acceptable, estimated installation on or before 1 September 2025.

1. Letter of Supply/Authorization – Must an OEM authorization letter accompany the initial quote, or may it be provided within a specified number of days after award?

1. Yes.

1. Scope of effort – Please confirm this procurement is bench delivery only (FOB destination, dock-side) and does not include removal of existing units, in-plant rigging/placement, electrical hookup, or calibration.

2. Delivery only, there is no dock. The United States Government (USG) will unload and move the equipment.

1. Receiving constraints – Will Tinker AFB provide dock access and forklift support, or should our price include lift-gate service and inside placement?

3. USG will unload the equipment. Delivery specifics will be on the fully executed award along with a delivery point of contact.

1. Partial shipments – Are partial deliveries acceptable (e.g., 3509A-01 benches first, 3606 benches later) provided all five units arrive within the contractual delivery window?

4. Acceptable if there are no extra costs for partial deliveries and ALL deliveries are made on or before 01 September 2025.

1. Small-business cash-flow relief – Would the Government consider FAR 32.112-3 progress payments or accelerated acceptance to facilitate small-business financing?

5. Progress payments are not allowed for commercial items, however we have 30 days to complete/accept an invoice once submitted in WAWF, as long as the product is received.

1. Technical submittal format – Will commercial OEM brochures meeting Attachment 1 specs satisfy the technical factor, or do you prefer a requirement-by-requirement compliance matrix?

6. Commercial manuals are satisfactory. USG does not expect the equipment has changed much from the current inventory.

1. Packaging standards – Are there any MIL-STD-2073 or other special packing requirements beyond commercial best practice?

7. The equipment must be packaged/shipped to protect from the weather (rain) and reduce any chance of rust.

1. Warranty period – Is the OEM standard 12-month parts & labor warranty acceptable, or should we quote an extended term?

8. Standard 12-month parts & labor warranty is acceptable.

1. Quote format – May we submit on an SF-1449 with continuation sheets, or do you prefer the solicitation’s CSS quote sheet?

9. Yes, that is acceptable as long as all information from the top part of the quote sheet is on the SF1449.

1. Subcontractor disclosure – If we team with an authorized stocking distributor, must that distributor be identified as a subcontractor in our quote?

10. No need to identify any subcontractors.

1. WAWF invoice type – Do you prefer a single “Combo” WAWF document or separate Receiving Report and Invoice documents at acceptance?

11. COMBO D/D Invoice is a requirement for commodities in WAWF and the specifics will be on the awarded contract.