Tech_Eval_Criteria_-_Coolant_Recovery_Spill_Containment_Berm_(2_Jul_2014).xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- Coolant Recovery Spill Containment Berm
- Solicitation number
- FA8126-14-Q-0126
About this file
Technical Evaluation Criteria
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Coolant_Recovery_Spill_Containment_Berm_Drawing.pdf | ||
| ITEM_DESCRIPTION_-_Coolant_Recovery_Spill_Containment_Berm_(10_July_2014).docx | DOCX document | |
| Signed_Brand_Name_Redacted.pdf | ||
| spill_containment_berm_css.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Item # | Description | Technical Evaluation | |
| Meets | Does Not Meet | ||
| 1 | Must be capable of containing oil and must be constructed so that any discharge from a primary containment system, such as a tank, will not escape the containment system before cleanup occurs. |
| 2 | 6 inch height minimum. |
| 3 | Designed and manufactured for long term use. |
| 4 | Preformed –able to be installed on site using only concrete fasteners and sealant. |
| 5 | Reusable – able to be relocated easily. |
| 6 | Rugged – able to withstand impact without cracking or leaking. |
Sheet2