This document is a Questions and Answers (Q&A) file for the Universal Fuel Accessories Test Stand (UFATS) solicitation, Solicitation Number FA8125-25-Q-0037, issued by the Department of the Air Force Sustainment Center at Tinker Air Force Base. The Q&A addresses technical details about testing requirements for various aircraft component coolers and heat exchangers, including specific test procedures for components like F16, B2, RC135, B1, and WC135 coolers. The document clarifies testing protocols, which primarily involve using MIL-PRF-7024 fuel or solvent for specific test paragraphs from various Technical Orders.

Key discussion points include the government's limitations on providing test units for factory acceptance, with only select components (F101 IGVA, F110 IGVA, F110 VSVA, F108 and F110 Main Fuel Nozzles) available for pre-shipment testing. The Q&A also addresses the construction of the new UFATS, emphasizing that the stand must use equivalent or superior materials, but not necessarily be an exact replica of existing equipment. Additional details cover utility interconnection, with electrical lines located approximately 25 feet away in the catwalk bay, which is critical for contractor pricing considerations.

View the file

Other files for this federal contract opportunity

Other files attached to Universal Fuel Accessories Test Stand (UFATS), newest first.
File Type Posted
Solicitation Amend 5 - FA812525Q00370005.pdf PDF
QAs (Rev.21Apr25) - UFATS FA812525Q0037.pdf PDF
QAs (Rev.10Apr25) - UFATS FA812525Q0037.pdf PDF
Solicitation Amend 4 - FA812525Q00370004.pdf PDF
Solicitation Amend 3 - FA812525Q00370003.pdf PDF
Q and As - UFATS (FA812525Q0037).pdf PDF
Solicitation Amend 2 - FA812525Q00370002.pdf PDF
Solicitation Amend 1 - FA812525Q00370001.pdf PDF
CUI-NDA_UFATS.pdf PDF
Solicitation - FA812525Q0037.pdf PDF
Attachment 1_SOW UFATS_3Sep2024_Redacted.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q & A s : U F A T S P a g e 1 | 3

DEPARTMENT OF THE AIR FORCE

AIR FORCE SUSTAINMENT CENTER (AFSC)

TINKER AIR FORCE BASE OKLAHOMA

QUESTIONS & ANSWERS

FA8125-25-Q-0037, UNIVERSAL FUEL ACCESSORIES TEST STAND

Q1. Are the following documents available? They are listed in the appendix notes.

Appendix F Note –

1. MXG-6-670-1

Appendix G Note -

1. FATS General Test Station, D-3035-000 thru D-3035-013 2. FATS TS04-02 Test Station, D-3035-001-0402 thru D-3035-013-0402 3. FATS Original Test Station, H0305901 thru H0305918

A1. These documents are compiled in Appendix F and G. Documents could be named differently.

Q2. We noticed that there is a component missing from the solicitation that was included in the ROM.

We wanted to make sure that component wasn't dropped accidentally. Should this be included or was it excluded intentionally?

F16 Cooler 1583M13 6J15-7-56-3

A2. This component is still in the solicitation. The original ROM had the component listed with the wrong TO number, the correct TO number is 7J1-96-3.

Q3. Would you please confirm that for the coolers (heat exchangers), only testing with MIL-PRF-7024 (“fuel”) is required?

12 F16 Cooler 9338M23P04 7J1-91-3 13 F16 Cooler 1583M13 7J1-96-3 14 B2 Cooler UA538973-3 15A4-122-3 16 RC135 Cooler 301-779-401-0, 301-779-402-0 7J1-85-13 17 B1 Cooler UA538411-3 7J1-84-3 18 WC135 Cooler 794589 2J-TF33-53-11 WP18 19 RC135 Cooler 301-779-502-0 6J24-10-13

A3. For this project, the listed end items only require tests and the portions of tests that use MIL-PRF-7024 or are stated in the T.O. to be operable with either oil or solvent. The required test paragraphs are listed below for reference.

a. 7J1-91-3:

i. 7.2.c (Proof Pressure)

ii. 7.2.d (Pressure Drop, Oil circuit tested using solvent)

b. 7J1-96-3:

i. 7.2.h (Fuel Circuit Pressure Drop)

Q & A s : U F A T S P a g e 2 | 3

ii. 7.2.i (Fuel Circuit Proof Pressure)

c. 7J1-85-13:

i. Paragraph 3.D (Fuel Pressure Drop)

ii. Paragraph 3.E (Fuel Pressure Relief Valve Operation)

iii. Paragraph 3.F (Fuel System Pressure)

iv. Paragraph 3.G (Oil Pressure, performed with solvent per T.O.)

d. 7J1-84-3:

i. 7.2.4 (Fuel Circuit Pressure Drop)

ii. 7.2.5 (Fuel Circuit Proof Pressure)

iii. 7.2.7 (Oil Circuit Proof Pressure, performed with solvent)

e. 6J24-10-13:

i. Paragraph 3.B (Fuel Side Proof Pressure)

ii. Paragraph 3.C (Oil Side Proof Pressure, performed with solvent per T.O.)

iii. Paragraph 3.D (Fuel Side Pressure Drop)

f. 15A4-122-3:

i. 7.6.5.1 (Proof Pressure)

ii. 7.6.5.2, Steps f-l (Pressure Drop, fuel side only)

Q4. Also, the SOW states only a sample of components will be available for factory acceptance (FAC). They want to perform FAC using only:

• F101 IGVA

• F110 IGVA

• F110 VSVA

• F108 Main Fuel Nozzle

• F110 Main Fuel Nozzle

They also want to perform full correlation at Tinker on this same group of UUTs. They also want to do what they are calling a “functional correlation” (single test run), on all the remaining UTs. This means that we will not have the opportunity to verify TPS’ work correctly prior to shipment and running the majority of the UUTs for the first time at Tinker.

While it will make for a longer FAC phase, I would ask if Tinker can provide ALL listed UUTs so that we can verify proper testing PRIOR to shipment.

A4. We will not be able to send items other than those listed to the contractor’s facility for TPS proofing, as that would require borrowing/removing an end item from the supply chain side and those parts would be needed for aircraft. The parts listed are CMXG-owned gold units we can send without any issue.

Q5. Referencing 14, B2, AMAD Heat Exchanger, UA538973-3, 15A4-122-3:

7.6.5.1 Proof Pressure Test requires the use of a hydrostatic test stand to provide water pressure up to 1555 PSIG. Can you please confirm this test is not to be performed on the UFATS?

A5. The end item will need to be run using the above listed tests. In our context, the “hydrostatic” test stand used for the testing uses solvent and not water, so this test will be required on the new stand.

Q & A s : U F A T S P a g e 3 | 3

Q6. SOW section 3.2: the new UFATS should be equivalent or superior in construction to the existing FATS. Does the government have documentation that describes the existing FATS in sufficient detail such that we can make sure our UFATS rig design would meet this SOW stipulation?

A6. All information about the existing test equipment is found in the SOW appendices. As a note, 3.2 specifically states that the quality of materials used in construction of the UFATS shall be equivalent or superior, not the UFATS itself. It might be a semantic issue, but I want to make sure there’s a distinction between using equivalent and superior materials in construction and having the stand itself be equivalent or superior. The new design must not be a carbon copy of the old one.

Q7. In section 3.7.2, all utilities are run within 25 ft. except the electrical. With the price of copper so high, it is critical to know how far away the electrical service is so that we can accurately price it. Can they please provide this information.

3.7.2 Utilities Interconnection: The Government will provide the required utilities, except for the electrical, to within twenty-five (25) feet of test stand location.

A7. The electrical lines are in the catwalk bay above the test stands, coincidentally around 25ft from where the top of the stand would likely be.