Amendment_3_FA8125-17-Q-0107.pdf

PDF 204 KB Posted

Attached to
Gear Shop Crane Replacement Federal contract opportunity
Solicitation number
FA812517Q0107
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to Gear Shop Crane Replacement, newest first.
File Type Posted
Question_and_Answers_9.22.2017.pdf PDF
Gear_Crane_SOW_Revised_19_Sept_2017.pdf PDF
Amendment_0002.pdf PDF
Gear_Crane_SOW_Revision_01.pdf PDF
Amendment_0001_Gear_Crane_(FA8125-17-Q-0107).pdf PDF
FA812517Q0107_Gear_Shop_Crane_Replacement.pdf PDF
FA812517Q0107_Gear_Crane_SOW.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F3YCEB7179A104

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to extend the response date, update the SOW and answ er contractor questions.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Sep-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA812517Q0107

X 9B. DATED (SEE ITEM 11)

11-Jul-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Sep-2017

CODE

AFSC/PZIMA

NATALIE GREEN/405-852-5732

3001 STAFF DR 2S76

TINKER AFB OK 73145

FA8125 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA812517Q0107

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

MOD TEXT

The purpose of this Amendment is to extend the response date, update the SOW, and answer contractor questions.

FIRST: Extend the solicitation response date as follows:

FROM: 2:00 PM CDT 19 September 2017 TO: 2:00 PM CDT 27 September 2017

SECOND: Contractor questions are hereby answered as follows:

Question 1: The current air hoist is chain, the SOW has requested a wire rope hoist, which offers less lift height. Is an electric chain hoist acceptable?

Answer 1: Yes, an electric chain hoist is acceptable.

Question 2: The existing hoist has a max hook height of 10'3", 12' is requested in the SOW. Is 10'3" acceptable?

Answer 2: Yes, 10'3" is acceptable and should have been the original height requested in the

SOW.

Question 3: Will the shop still be working during the retrofit?

Answer 3: Yes, part of the shop will still be working during the retrofit, but production located underneath the hoist/crane will cease until retrofit completed.

Question 4: What is the linear footage, including rise and fall from the electrical panel location to the landing gear shop. (overall footage of conduit required)? Shop layout drawing available?

Answer 4: Total length including rise and fall from power panel to the closest gantry leg is approximately 38 to 40 feet. Shop drawings shall not be provided.

Question 5: Is the technical information for the existing crane available (factory specifications)?

Answer 5: The hoist is a Chester Hoist, Model ALP0200S. It can be found on the manufactuer’s website: chesterhoist.com.

Question 6: Due to the short runway and asset being lifted, 120 fpm is an unsafe travel speed, is this correct?

Answer 6: Government does not know the safe speed, but a motor with a variable speed up to 120 fpm would be acceptable, especially if maximum limits can be set during installation and usage.

Question 7: Due to the positioning required to place asset in fixture is 65 fpm correct for trolley speed?

Answer 7: A motor with a variable speed up 65 fpm shall be acceptable, especially if maximum limits can be set during installation and usage.

THIRD: Statement of Work (SOW) is hereby updated and attached as follows

FROM: Statement of Work Revision 01 Dated 03 August 2017 TO: Statement of Work Revision 02 Dated 19 September 2017

FOURTH: All other terms and conditions remain unchanged and in full force and effect.

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 19-Sep-2017 02:00 PM to 27-Sep-2017 02:00 PM.

The following have been modified:

CONTRACTOR NOTE

1. CONTRACT HOLIDAYS

(a) The prices/costs in Section B of the contract holiday observances; accordingly, the Government will not be billed for such holidays, except when services are required by the Government and are actually performed on a holiday. Holidays in addition to those reflected in this contract, which are designated by the Government, will be billable provided the assigned Contractor employee was available for performance and was precluded from such performance.

(b) The following days are contract holidays: New Years Day, Martin Luther King, Jr. Day, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas Day.

2. “TRUCK ENTRY GATE” NOTICE

IMPORTANT DELIVERY INFORMATION

Tinker Air Force Base has constructed a “Truck Entry Gate” (Gate 33), which is located at the corner of 59th Street and Air Depot Blvd (southwest corner of the base).

Gate 33 shall be used for all deliveries by truck to this base. Any commercial vehicle traffic after the standard Truck Gate hours (0600-1600) or on weekends will be expected to utilize Piazza Gate. Adjust travel or delivery plans to the installation accordingly.

To access Piazza Gate from the Truck Entry Gate, proceed south on South Air Depot Blvd. to SE 74th St., turn east and proceed to S. Midwest Blvd., turn north, and proceed to Piazza Gate.

(Trucks will not be allowed to gain access through any other gate.)

Since your firm’s delivery on this order is affected, please advise your delivery carrier to use the new gate. This should minimize the impact of your delivery.

DELIVERIES TO BUILDING 3001 (B / 3001)

Be advised that delivery vehicles destined for B / 3001 are prohibited from using “Staff Drive”.

Delivery vehicles may make deliveries only in designated unloading areas.

Since your firm’s delivery may be affected, ensure that your delivery carrier receives proper instructions on delivery / unloading requirements for B / 3001. Unloading in designated unloading areas will minimize any inconvenience, and, attendant ramifications, which may accrue, to your delivery / delivery carrier for failure to adhere to this requirement.

3. CONTRACTOR ID BADGE REQUIREMENTS

Contractors working on Tinker AFB shall comply with all procedures outlined in TAFBI 31-101, AFI 10-245 and TAFBP 31-101. OF SPECIAL NOTE, in accordance with TAFBI 31-101 para 5.3, all contractors/contractor personnel will be assessed a charge of $50.00 for each badge lost, willfully damaged, or not surrendered to Pass and Registration. No charge will be made on a replacement required due to normal wear. Personnel will report to Accounting and Finance, Accounts Receivable Unit and a DD Form 1131, Cash Collection Voucher, will be prepared and presented to Pass and Registration prior to issuing a replacement identification. Identification will be surrendered to Security Forces personnel upon demand for the purpose of identification, investigation, abuse, misuse, or for any other reason necessary. Civilian and military retirees who conduct commercial business on base must obtain a badge through their place of employment. ALSO OF SPECIAL NOTE, in accordance with TAFBI 31-101 para 7, all contractors/contractor personnel shall be subject to background checks as deemed necessary.

4. LIST OF ATTACHMENTS

FORM NR DESCRIPTION DATE NR OF PAGES

Statement of Work Rev 02 19 Sept 2017 04 Item Description 21 Jun 2017 01

(End of Summary of Changes)

File details come from the government source that posted it. Updated .