Amendment_0001_Gear_Crane_(FA8125-17-Q-0107).pdf
PDF 125 KB Posted
- Attached to
- Gear Shop Crane Replacement Federal contract opportunity
- Solicitation number
- FA812517Q0107
About this file
Amendment 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Question_and_Answers_9.22.2017.pdf | ||
| Gear_Crane_SOW_Revised_19_Sept_2017.pdf | ||
| Amendment_3_FA8125-17-Q-0107.pdf | ||
| Amendment_0002.pdf | ||
| Gear_Crane_SOW_Revision_01.pdf | ||
| FA812517Q0107_Gear_Shop_Crane_Replacement.pdf | ||
| FA812517Q0107_Gear_Crane_SOW.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F3YCEB7179A104
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to incorporate revised Statement of Work and modify/update FAR Clause 52.212-2 Evaluation--Commerical Items w ith revised Technical Evaluation Review .
1. CONTRACT ID CODE PAGE OF PAGES
J 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Aug-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA812517Q0107
X 9B. DATED (SEE ITEM 11)
11-Jul-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Aug-2017
CODE
AFSC/PZIMA
ANDREA L GREENE/405-739-5514
3001 STAFF DRIVE
TINKER AFB OK 73145
FA8125 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA812517Q0107
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT
The purpose of this amendment is as follows:
FIRST: Statement of Work is hereby update and attached as follows:
FROM: Statement of Work
TO: Rev 01 Statement of Work date 3 August 2017.
SECOND: The following have been modified:
52.212-2 EVALUATION—COMMERICAL ITEMS (OCT 2014) –see summary of changes (below).
THIRD: All other terms and conditions remain unchange and in full force and effect.
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
CONTRACTOR NOTE
1. CONTRACT HOLIDAYS
(a) The prices/costs in Section B of the contract holiday observances; accordingly, the Government will not be billed for such holidays, except when services are required by the Government and are actually performed on a holiday. Holidays in addition to those reflected in this contract, which are designated by the Government, will be billable provided the assigned Contractor employee was available for performance and was precluded from such performance.
(b) The following days are contract holidays: New Years Day, Martin Luther King, Jr. Day, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas Day.
2. “TRUCK ENTRY GATE” NOTICE
IMPORTANT DELIVERY INFORMATION
Tinker Air Force Base has constructed a “Truck Entry Gate” (Gate 33), which is located at the corner of 59th Street and Air Depot Blvd (southwest corner of the base).
Gate 33 shall be used for all deliveries by truck to this base. Any commercial vehicle traffic after the standard Truck Gate hours (0600-1600) or on weekends will be expected to utilize Piazza Gate. Adjust travel or delivery plans to the installation accordingly.
To access Piazza Gate from the Truck Entry Gate, proceed south on South Air Depot Blvd. to SE 74th St., turn east and proceed to S. Midwest Blvd., turn north, and proceed to Piazza Gate.
(Trucks will not be allowed to gain access through any other gate.)
Since your firm’s delivery on this order is affected, please advise your delivery carrier to use the new gate. This should minimize the impact of your delivery.
DELIVERIES TO BUILDING 3001 (B / 3001)
Be advised that delivery vehicles destined for B / 3001 are prohibited from using “Staff Drive”.
Delivery vehicles may make deliveries only in designated unloading areas.
Since your firm’s delivery may be affected, ensure that your delivery carrier receives proper instructions on delivery / unloading requirements for B / 3001. Unloading in designated unloading areas will minimize any inconvenience, and, attendant ramifications, which may accrue, to your delivery / delivery carrier for failure to adhere to this requirement.
3. CONTRACTOR ID BADGE REQUIREMENTS
Contractors working on Tinker AFB shall comply with all procedures outlined in TAFBI 31-101, AFI 10-245 and TAFBP 31-101. OF SPECIAL NOTE, in accordance with TAFBI 31-101 para 5.3, all contractors/contractor personnel will be assessed a charge of $50.00 for each badge lost, willfully damaged, or not surrendered to Pass and Registration. No charge will be made on a replacement required due to normal wear. Personnel will report to Accounting and Finance, Accounts Receivable Unit and a DD Form 1131, Cash Collection Voucher, will be prepared and presented to Pass and Registration prior to issuing a replacement identification. Identification will be surrendered to Security Forces personnel upon demand for the purpose of identification, investigation, abuse, misuse, or for any other reason necessary. Civilian and military retirees who conduct commercial business on base must obtain a badge through their place of employment. ALSO OF SPECIAL NOTE, in accordance with TAFBI 31-101 para 7, all contractors/contractor personnel shall be subject to background checks as deemed necessary.
4. LIST OF ATTACHMENTS
FORM NR DESCRIPTION DATE NR OF PAGES
Statement of Work Rev 01 3 Aug 2017 04 Item Description 21 Jun 2017 01
52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
1. Basis for Contract Award:
This acquisition will utilize Lowest Price Technically Acceptable (LPTA) source selection procedures in accordance with FAR 15.101-2 <http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/15.htm#P25_3834> , as supplemented. Technical tradeoffs will not be made and no additional credit will be given for exceeding acceptability. Award will be made to the acceptable offeror with the lowest evaluated cost or price, which is deemed responsible in accordance with the Federal Acquisition Regulation and whose proposal conforms to the solicitation requirements. The solicitation requirements include all stated terms, conditions, representations, certifications, and all other information required by FAR 52.212-1 of this solicitation. The Government reserves the right to award without discussions. Therefore, each initial offer should contain the offeror’s best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if determined necessary by the Contracting Officer.
2. Number of Contracts to be Awarded:
The Government intends to select one contractor for the award. However, the Government reserves the right to award no contract at all, depending on the quality of the proposals and prices submitted and the availability of funds.
3. Rejection of Unreasonable Offers:
The Government may reject any proposal that is evaluated to be unrealistic in terms of program commitments, including contract terms and conditions, or unrealistically high or low in cost/price when compared to Government estimates, such that the proposal is deemed to reflect an inherent lack of competence or failure to comprehend the complexity and risks of the program.
4. Correction Potential of Proposals:
The Government will consider, throughout the evaluation, the "correction potential" of any proposal uncertainty.
The judgment of such "correction potential" is within the sole discretion of the Government. If an aspect of an offeror's proposal not meeting the Government's requirements is not considered correctable, the offeror may be eliminated from the competitive range.
5. Evaluation Factors Factor 1—Technical Proposal Factor 2—Cost/Price
a. Evaluation Methodology:
The Government will evaluate all technical factors concurrently for the three (3) lowest priced proposals. Should one of those three (3) proposals not be found technically acceptable, the next one (1) lowest priced offeror will be reviewed for technical acceptance. Then, price will be evaluated and the proposals will be listed from lowest to highest price based on the total evaluated price either initially or as a result of discussions.
Award will be made to the lowest evaluated priced proposal meeting the acceptability standards for the non-cost factors.
b. Technical Factor:
Acceptable – The proposal meets specified minimum technical evaluation requirements necessary for acceptable contract performance.
Unacceptable – The proposal fails to meet specified minimum technical eavluation requirements necessary for contract performance. Proposals with an unacceptable rating are not awardable.
Technical acceptability will be based on an evaluation of proposals against the criteria stated below and other technical specifications in the Item Description. Offerors are required to present all the information as stated in the Instructions to Offerors, FAR 52.212-1. The minimum technical evaluation requirement is met when the Offeror’s proposal thoroughly substantiates all the following essential criteria:
“CONTRACTOR MUST PROVIDE A WRITTEN STATEMENT TO EXPLAIN HOW THEY ARE
MEETING THE TECHNICAL EVALUATION CRITERIA LISTED BELOW. A STATEMENT OF “I
CONCUR” OR “CONCUR” WILL NOT BE ACCEPTED. THE WRITTEN STATEMENT IS ESSENTIAL
FOR YOUR QUOTE TO BE RESPONSIVE AND BE REFERRED FOR TECHNICAL REVIEW.”
SPECIFIC REQUIREMENT
ACCEPTABLE
NON-
ACCEPTABLE
REMARKS
Replace 2-ton air hoist and trolley with a new 2-ton electric wire rope hoist
• Shall be at least 12-foot lift
• Trolley shall have variable frequency drive motor
• Trolley shall have a speed of at least 65 feet per minute.
Replace air bridge drive motor with dual drive bridge 3-phase variable frequency drive motor
• Shall have speed of at least 120 feet per minute
• Bridge and hoist controller
Install 3-phase buss bar system/power
• Shall be 460 volt 3-phase.
Provide HP rating, and current draw.
Installation shall include startup and load testing, as stated in the Statement of Work (SOW)
c. Cost/Price Factor:
Cost/Price Evaluation: The offeror’s cost/price proposal will be evaluated for award purposes by adding the total price for basic requirements (basic award).
Total Evaluated Price: Price analysis will be performed to determine the reasonableness of the offeror’s price proposal. Reasonableness will be based on the total evaluated price. The total evaluated price will be calculated as the sum of the Contract Line Item Numbers (CLINs) unit/extended prices plus other associated factors such as: first article testing cost, transportation cost, price evaluation adjustments for Small Disadvantaged Business Concerns, and application of labor hours to labor hour rates, etc.
Unreasonably Low Costs or Prices: Unreasonably low proposed costs or prices, initially or subsequently, may be grounds for eliminating a proposal from competition either on the basis that the offeror does not understand the requirement or the offeror has made an unrealistic proposal.
Unbalanced Pricing: Offerors are cautioned against submitting an offer that contains unbalance pricing.
Unbalanced pricing may increase performance risk and could result in payment of unreasonably high prices.
Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly over or understated as indicated by the application of cost or price analysis techniques. The Government shall analyze offers to determine whether they are unbalanced with respect to separately priced line items or subline items. Offers that are determined to be unbalanced may be rejected if the contracting officer determines that the lack of balance poses an unacceptable risk to the Government.
6. Determination of Contractor Responsibility
To be eligible for award, an offeror must be determined responsible. A Determination of Contractor Responsibility will be conducted in accordance with FAR 9.1 (CCR, EPLS and ORCA). Past performance information may be gathered from both Government (such as PPIRS, CPARS) and commercial sources. Offerors will not be penalized if no past performance information is available. Past performance will either be satisfactory, neutral, or unsatisfactory.
Offerors rated as satisfactory or neutral equals a determination of responsibility. Offerors rated as unsatisfactory equals a determination of non-responsibility. Any unsatisfactory rating given to a small business will be referred to the Small Business Administration pursuant to FAR 15.101-2(b) and 19.6 for resolution. An offeror who receives a determination of non-responsibility will not be eligible to receive the contract award.
7. Past Performance:
Past performance information may be gathered from both Government (such as PPIRS, CPARS) and commercial sources. Offerors will not be penalized if no past performance information is available. Past performance will either be satisfactory, neutral, or unsatisfactory where satisfactory equals a neutral or determination of responsibility, and unsatisfactory equals a determination of non-responsibility. Any unsatisfactory rating given to a small business will be referred to the Small Business Administration pursuant to FAR 15.101-2(b) and 19.6 for resolution.
8. Discussions:
It is the Government’s intent to award without discussions; therefore, it is imperative that offerors submit their best terms initially. However, if during the evaluation period, it is determined to be in the best interest of the Government to hold discussions, offeror responses to Evaluation Notices (ENs), and the Final Proposal Revisions (FPRs) will be considered in making the source selection decision. If a request for FPR is issued, offeror responses to EN notices must be included in the FPR in order to be consider in the final evaluation.
9. SOLICITATION REQUIREMENTS, TERMS AND CONDITIONS
Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or sub-factors, and all technical specifications of the item description. Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. In the case that a discrepancy exist between the Instruction To Offerors (ITO) and the evaluation factors for award, the evaluation criteria in 52.212-2 will take precedence
(b) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of provision)
(End of Summary of Changes)
File details come from the government source that posted it. Updated .