FA8125-13-Q-0057-0002.doc
DOC document 76 KB Posted
- Attached to
- Thermal Spray Coating Evaluation - Annual Federal contract opportunity
- Solicitation number
- FA8125-13-Q-0057
About this file
Amendment 0002 to solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA8125-13-Q-0057-0003.doc | DOC document | |
| 26Nov13(2)PWS_Thermal_Spray.docx | DOCX document | |
| FA8125-13-Q-0057-0001.doc | DOC document | |
| 27Aug13PWS_Thermal_Spray.docx | DOCX document | |
| Appendix_B_Scheduled_GFP_Thermal_Spray_Coating_Evaluation_PMXG.xlsx | XLSX spreadsheet | |
| APPENDIX_C_Thermal_Spray_Coating_Evaluation_PMXG.docx | DOCX document | |
| Thermal_Solicitation.doc | DOC document | |
| 2013_Wage_Determination.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SEE BELOW
FIRST: Solicitation FA8125-13-Q-0057 is hereby changed as follows: (only revised text indicated below—all other text remains as indicated in the original soliciation.)
From:
CLIN 0001
Period of Performance: 26 Sep 13 thru 25 Sep 14
Pricing: Pricing is for the annual evlauation of sixty-four (64) Government provided samples listed in table 1 of the Performance Work Statement (PWS).
All travel costs shall be reimbursed directly to the contractor in accordance with FAR 31.205-46 and the Joint Travel Regulations (JTR). The contractor Shall be reimbursed the current JTR Per Diem Rate (Lodging, Meals, and Incidentals) for Tinker AFB OK which is $147.00 per day. Airfare and Car Rental shall be reimbursed at cost and shall be supported by proof of payment (receipts).
This is a Firm Fixed Price (FFP) Line Item.
Total FFP $ ________________
CLIN 1001
Period of Performance: 26 Sep 14 thru 25 Sep 15
Pricing: Pricing is for the annual evlauation of sixty-four (64) Government provided samples listed in table 1 of the Performance Work Statement (PWS).
All travel costs shall be reimbursed directly to the contractor in accordance with FAR 31.205-46 and the Joint Travel Regulations (JTR). The contractor Shall be reimbursed the current JTR Per Diem Rate (Lodging, Meals, and Incidentals) for Tinker AFB OK which is $147.00 per day. Airfare and Car Rental shall be reimbursed at cost and shall be supported by proof of payment (receipts).
This is a Firm Fixed Price (FFP) Line Item.
Total FFP $ ________________
CLIN 2001
Period of Performance: 26 Sep 15 thru 25 Sep 16
Pricing: Pricing is for the annual evlauation of sixty-four (64) Government provided samples listed in table 1 of the Performance Work Statement (PWS).
All travel costs shall be reimbursed directly to the contractor in accordance with FAR 31.205-46 and the Joint Travel Regulations (JTR). The contractor Shall be reimbursed the current JTR Per Diem Rate (Lodging, Meals, and Incidentals) for Tinker AFB OK which is $147.00 per day. Airfare and Car Rental shall be reimbursed at cost and shall be supported by proof of payment (receipts).
This is a Firm Fixed Price (FFP) Line Item.
Total FFP $ ________________
CLIN 3001
Period of Performance: 26 Sep 16 thru 25 Sep 17
Pricing: Pricing is for the annual evlauation of sixty-four (64) Government provided samples listed in table 1 of the Performance Work Statement (PWS).
All travel costs shall be reimbursed directly to the contractor in accordance with FAR 31.205-46 and the Joint Travel Regulations (JTR). The contractor Shall be reimbursed the current JTR Per Diem Rate (Lodging, Meals, and Incidentals) for Tinker AFB OK which is $147.00 per day. Airfare and Car Rental shall be reimbursed at cost and shall be supported by proof of payment (receipts).
This is a Firm Fixed Price (FFP) Line Item.
Total FFP $ ________________
CLIN 4001
Period of Performance: 26 Sep 17 thru 25 Sep 18
Pricing: Pricing is for the annual evlauation of sixty-four (64) Government provided samples listed in table 1 of the Performance Work Statement (PWS).
All travel costs shall be reimbursed directly to the contractor in accordance with FAR 31.205-46 and the Joint Travel Regulations (JTR). The contractor Shall be reimbursed the current JTR Per Diem Rate (Lodging, Meals, and Incidentals) for Tinker AFB OK which is $147.00 per day. Airfare and Car Rental shall be reimbursed at cost and shall be supported by proof of payment (receipts).
This is a Firm Fixed Price (FFP) Line Item.
Total FFP $ ________________
To:
CLIN 0001
Period of Performance: 1 Dec 13 -30 Nov 14
BEQ Testing Unit Price
8 Bond Strength Testing $_______
24 Single Layer Aerospace Coating Analysis $_______
16 Dual Layer Aerospace Coating Analysis
8 Single Layer Aerospace Coating Analysis (include micro-hardness) $_____
4 Dual Layer Aerospace Coating Analysis (includes micro-hardness) $_______
4 Rockwell Hardness Testing $_______
This is a Firm Fixed Price (FFP) Unit Price Line Item.
Total FFP utilzing the BEQ provided: $______________
CLIN 1001
Period of Performance: 1 Dec 14 -30 Nov 15
BEQ Testing
This is a Firm Fixed Price (FFP) Unit Price Line Item.
Total FFP utilzing the BEQ provided: $______________
CLIN 2001
Period of Performance: 1 Dec 15 -30 Nov 16
BEQ Testing
This is a Firm Fixed Price (FFP) Unit Price Line Item.
Total FFP utilzing the BEQ provided: $______________
CLIN 3001
Period of Performance: 1 Dec 16 -30 Nov 17
BEQ Testing
This is a Firm Fixed Price (FFP) Unit Price Line Item.
Total FFP utilzing the BEQ provided: $______________
CLIN 4001
Period of Performance: 1 Dec 17 -30 Nov 18
BEQ Testing
This is a Firm Fixed Price (FFP) Unit Price Line Item.
Total FFP utilzing the BEQ provided: $______________
SECOND: Response date is changed:
FROM: 24 Sep 13
TO: 17 Oct 13
THIRD: All other terms and conditions remain unchanged and in full force and effect.
The following information is system generated and cannot be deleted or changed; Therefore the information above summarizes these changes.
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 13-Sep-2013 12:00 PM to 17-Oct-2013 03:00 PM.
SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from The Contractor shall provide all personnel, labor, equipment, supplies, facilities, transportation, tools, materials, supervision, and personal protective equipment necessary to evaluate thermal spray coatings at the Contractor's site. The Contractor shall be responsible for ensuring that all of the services provided under this contract are in accordance with the terms and conditions outlined herein and this Performance Work Statement (PWS). Period of Performance: 26 Sept 13 thru 25 Sept 14Pricing: Pricing is for the annual evalution of sixty-four (64) Government provided samples listed in table 1 of the Performance Work Statement (PWS). All travel costs shall be reimbursed directly to the contractor in accordance with FAR 31.205-46 and the Joint Travel Regulations (JTR). The contractor shall be reimbursed the current JTR Per Diem Rate (Lodging, Meals and Incidentals) for Tinker AFB OK which is $147.00 per day. Airfare and Car Rental shall be reimbursed at cost and shall be supported by proof of payment (receipts).This is a Firm Fixed Price (FFP) Line Item.Total FFP $___________CONTRACTOR IS SAM REGISTERED.REGISTRATION IS VALID UNTIL:CONTRACTOR SHALL SUBMIT INVOICES IN ARREARS OF SERVICES THROUGH WIDE AREA WORK FLOW (WAWF)SEE CLAUSE 252.232-7006 to The Contractor shall provide all personnel, labor, equipment, supplies, facilities, transportation, tools, materials, supervision, and personal protective equipment necessary to evaluate thermal spray coatings at the Contractor's site. The Contractor shall be responsible for ensuring that all of the services provided under this contract are in accordance with the terms and conditions outlined herein and this Performance Work Statement (PWS). Period of Performance: 1 Dec 13 -30 Nov 14BEQ Testing Unit Price8 Bond Strength Testing $_______ 24 Single Layer Aerospace Coating Analysis $_______16 Dual Layer Aerospace Coating Analysis $_______8 Single Layer Aerospace Coating Analysis (include micro-hardness) $_____ 4 Dual Layer Aerospace Coating Analysis (includes micro-hardness) $_______4 Rockwell Hardness Testing $_______This is a Firm Fixed Price (FFP) Unit Price Line Item.Total FFP utilzing the BEQ provided: $______________CONTRACTOR IS SAM REGISTERED.REGISTRATION IS VALID UNTIL:CONTRACTOR SHALL SUBMIT INVOICES IN ARREARS OF SERVICES THROUGH WIDE AREA WORK FLOW (WAWF)SEE CLAUSE 252.232-7006.
CLIN 1001
The CLIN extended description has changed from The Contractor shall provide all personnel, labor, equipment, supplies, facilities, transportation, tools, materials, supervision, and personal protective equipment necessary to evaluate thermal spray coatings at the Contractor's site. The Contractor shall be responsible for ensuring that all of the services provided under this contract are in accordance with the terms and conditions outlined herein and this Performance Work Statement (PWS). Period of Performance: 26 Sept 14 thru 25 Sept 15Pricing: Pricing is for the annual evalution of sixty-four (64) Government provided samples listed in table 1 of the Performance Work Statement (PWS). All travel costs shall be reimbursed directly to the contractor in accordance with FAR 31.205-46 and the Joint Travel Regulations (JTR). The contractor shall be reimbursed the current JTR Per Diem Rate (Lodging, Meals and Incidentals) for Tinker AFB OK which is $147.00 per day. Airfare and Car Rental shall be reimbursed at cost and shall be supported by proof of payment (receipts).This is a Firm Fixed Price (FFP) Line Item.Total FFP $___________CONTRACTOR IS SAM REGISTERED.REGISTRATION IS VALID UNTIL:CONTRACTOR SHALL SUBMIT INVOICES IN ARREARS OF SERVICES THROUGH WIDE AREA WORK FLOW (WAWF)SEE CLAUSE 252.232-7006 to The Contractor shall provide all personnel, labor, equipment, supplies, facilities, transportation, tools, materials, supervision, and personal protective equipment necessary to evaluate thermal spray coatings at the Contractor's site. The Contractor shall be responsible for ensuring that all of the services provided under this contract are in accordance with the terms and conditions outlined herein and this Performance Work Statement (PWS). Period of Performance: 1 Dec 14 thru 30 Nov 15BEQ Testing Unit Price8 Bond Strength Testing $_______ 24 Single Layer Aerospace Coating Analysis $_______16 Dual Layer Aerospace Coating Analysis $_______8 Single Layer Aerospace Coating Analysis (include micro-hardness) $_____ 4 Dual Layer Aerospace Coating Analysis (includes micro-hardness) $_______4 Rockwell Hardness Testing $______This is a Firm Fixed Price (FFP) Unit Price Line Item.Total FFP utilzing the BEQ provided: $______________CONTRACTOR IS SAM REGISTERED.REGISTRATION IS VALID UNTIL:CONTRACTOR SHALL SUBMIT INVOICES IN ARREARS OF SERVICES THROUGH WIDE AREA WORK FLOW (WAWF)SEE CLAUSE 252.232-7006.
CLIN 2001
The CLIN extended description has changed from The Contractor shall provide all personnel, labor, equipment, supplies, facilities, transportation, tools, materials, supervision, and personal protective equipment necessary to evaluate thermal spray coatings at the Contractor's site. The Contractor shall be responsible for ensuring that all of the services provided under this contract are in accordance with the terms and conditions outlined herein and this Performance Work Statement (PWS). Period of Performance: 26 Sept 15 thru 25 Sept 16Pricing: Pricing is for the annual evalution of sixty-four (64) Government provided samples listed in table 1 of the Performance Work Statement (PWS). All travel costs shall be reimbursed directly to the contractor in accordance with FAR 31.205-46 and the Joint Travel Regulations (JTR). The contractor shall be reimbursed the current JTR Per Diem Rate (Lodging, Meals and Incidentals) for Tinker AFB OK which is $147.00 per day. Airfare and Car Rental shall be reimbursed at cost and shall be supported by proof of payment (receipts).This is a Firm Fixed Price (FFP) Line Item.Total FFP $___________CONTRACTOR IS SAM REGISTERED.REGISTRATION IS VALID UNTIL:CONTRACTOR SHALL SUBMIT INVOICES IN ARREARS OF SERVICES THROUGH WIDE AREA WORK FLOW (WAWF)SEE CLAUSE 252.232-7006 to The Contractor shall provide all personnel, labor, equipment, supplies, facilities, transportation, tools, materials, supervision, and personal protective equipment necessary to evaluate thermal spray coatings at the Contractor's site. The Contractor shall be responsible for ensuring that all of the services provided under this contract are in accordance with the terms and conditions outlined herein and this Performance Work Statement (PWS). Period of Performance: 1 Dec 15 thru 30 Nov 16BEQ Testing Unit Price8 Bond Strength Testing $_______ 24 Single Layer Aerospace Coating Analysis $_______16 Dual Layer Aerospace Coating Analysis $_______8 Single Layer Aerospace Coating Analysis (include micro-hardness) $_____ 4 Dual Layer Aerospace Coating Analysis (includes micro-hardness) $_______4 Rockwell Hardness Testing $_______This is a Firm Fixed Price (FFP) Unit Price Line Item.Total FFP utilzing the BEQ provided: $______________CONTRACTOR IS SAM REGISTERED.REGISTRATION IS VALID UNTIL:CONTRACTOR SHALL SUBMIT INVOICES IN ARREARS OF SERVICES THROUGH WIDE AREA WORK FLOW (WAWF)SEE CLAUSE 252.232-7006.
CLIN 3001
The CLIN extended description has changed from The Contractor shall provide all personnel, labor, equipment, supplies, facilities, transportation, tools, materials, supervision, and personal protective equipment necessary to evaluate thermal spray coatings at the Contractor's site. The Contractor shall be responsible for ensuring that all of the services provided under this contract are in accordance with the terms and conditions outlined herein and this Performance Work Statement (PWS). Period of Performance: 26 Sept 16 thru 25 Sept 17Pricing: Pricing is for the annual evalution of sixty-four (64) Government provided samples listed in table 1 of the Performance Work Statement (PWS). All travel costs shall be reimbursed directly to the contractor in accordance with FAR 31.205-46 and the Joint Travel Regulations (JTR). The contractor shall be reimbursed the current JTR Per Diem Rate (Lodging, Meals and Incidentals) for Tinker AFB OK which is $147.00 per day. Airfare and Car Rental shall be reimbursed at cost and shall be supported by proof of payment (receipts).This is a Firm Fixed Price (FFP) Line Item.Total FFP $___________CONTRACTOR IS SAM REGISTERED.REGISTRATION IS VALID UNTIL:CONTRACTOR SHALL SUBMIT INVOICES IN ARREARS OF SERVICES THROUGH WIDE AREA WORK FLOW (WAWF)SEE CLAUSE 252.232-7006 to The Contractor shall provide all personnel, labor, equipment, supplies, facilities, transportation, tools, materials, supervision, and personal protective equipment necessary to evaluate thermal spray coatings at the Contractor's site. The Contractor shall be responsible for ensuring that all of the services provided under this contract are in accordance with the terms and conditions outlined herein and this Performance Work Statement (PWS). Period of Performance: 1 Dec16 thru 30 Nov 17BEQ Testing Unit Price8 Bond Strength Testing $_______ 24 Single Layer Aerospace Coating Analysis $_______16 Dual Layer Aerospace Coating Analysis $_______8 Single Layer Aerospace Coating Analysis (include micro-hardness) $_____ 4 Dual Layer Aerospace Coating Analysis (includes micro-hardness) $_______4 Rockwell Hardness Testing $_______This is a Firm Fixed Price (FFP) Unit Price Line Item.Total FFP utilzing the BEQ provided: $______________CONTRACTOR IS SAM REGISTERED.REGISTRATION IS VALID UNTIL:CONTRACTOR SHALL SUBMIT INVOICES IN ARREARS OF SERVICES THROUGH WIDE AREA WORK FLOW (WAWF)SEE CLAUSE 252.232-7006.
CLIN 4001
The CLIN extended description has changed from The Contractor shall provide all personnel, labor, equipment, supplies, facilities, transportation, tools, materials, supervision, and personal protective equipment necessary to evaluate thermal spray coatings at the Contractor's site. The Contractor shall be responsible for ensuring that all of the services provided under this contract are in accordance with the terms and conditions outlined herein and this Performance Work Statement (PWS). Period of Performance: 26 Sept 17 thru 25 Sept 18Pricing: Pricing is for the annual evalution of sixty-four (64) Government provided samples listed in table 1 of the Performance Work Statement (PWS). All travel costs shall be reimbursed directly to the contractor in accordance with FAR 31.205-46 and the Joint Travel Regulations (JTR). The contractor shall be reimbursed the current JTR Per Diem Rate (Lodging, Meals and Incidentals) for Tinker AFB OK which is $147.00 per day. Airfare and Car Rental shall be reimbursed at cost and shall be supported by proof of payment (receipts).This is a Firm Fixed Price (FFP) Line Item.Total FFP $___________CONTRACTOR IS SAM REGISTERED.REGISTRATION IS VALID UNTIL:CONTRACTOR SHALL SUBMIT INVOICES IN ARREARS OF SERVICES THROUGH WIDE AREA WORK FLOW (WAWF)SEE CLAUSE 252.232-7006 to The Contractor shall provide all personnel, labor, equipment, supplies, facilities, transportation, tools, materials, supervision, and personal protective equipment necessary to evaluate thermal spray coatings at the Contractor's site. The Contractor shall be responsible for ensuring that all of the services provided under this contract are in accordance with the terms and conditions outlined herein and this Performance Work Statement (PWS). Period of Performance: 1 Dec17 thru 30 Nov 18BEQ Testing Unit Price8 Bond Strength Testing $_______ 24 Single Layer Aerospace Coating Analysis $_______16 Dual Layer Aerospace Coating Analysis $_______8 Single Layer Aerospace Coating Analysis (include micro-hardness) $_____ 4 Dual Layer Aerospace Coating Analysis (includes micro-hardness) $_______4 Rockwell Hardness Testing $_______This is a Firm Fixed Price (FFP) Unit Price Line Item.Total FFP utilzing the BEQ provided: $_____________CONTRACTOR IS SAM REGISTERED.REGISTRATION IS VALID UNTIL:CONTRACTOR SHALL SUBMIT INVOICES IN ARREARS OF SERVICES THROUGH WIDE AREA WORK FLOW (WAWF)SEE CLAUSE 252.232-7006.
DELIVERIES AND PERFORMANCE
The following Delivery Schedule item for CLIN 0001 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 26-SEP-2013 TO
25-SEP-2014
| N/A |
| F3YCEB |
KELLI MUNTZ
76 MXW/OBWK
3001 STAFF DR STE S69
TINKER AFB OK 73145
405-736-7540
FOB: Destination
F3YCEB
To:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 01-DEC-2013 TO
30-NOV-2014
| N/A |
| F3YCEB |
KELLI MUNTZ
76 MXW/OBWK
3001 STAFF DR STE S69
TINKER AFB OK 73145
405-736-7540
F3YCEB
The following Delivery Schedule item has been added to CLIN 1001:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 01-DEC-2014 TO
30-NOV-2015
| N/A |
| N/A |
The following Delivery Schedule item has been added to CLIN 2001:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 01-DEC-2015 TO
30-NOV-2016
| N/A |
| N/A |
The following Delivery Schedule item has been added to CLIN 3001:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 01-DEC-2016 TO
30-NOV-2017
| N/A |
| N/A |
The following Delivery Schedule item has been added to CLIN 4001:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 01-DEC-2017 TO
30-NOV-2018
| N/A |
| N/A |
(End of Summary of Changes)
File details come from the government source that posted it. Updated .