Attachment_4.pdf
PDF 373 KB Posted
- Attached to
- Repair Chiller #5 Federal contract opportunity
- Solicitation number
- FA8101-17-Q-0012
About this file
1354 Checklist
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA8101-17-Q-001201_Amendment02.pdf | ||
| FA8101-17-Q-0012_Q&A_Responses.pdf | ||
| FA8101-17-Q-001201_Amendment01.pdf | ||
| FA8101-17-Q-0012.pdf | ||
| Attachment_2.pdf | ||
| Attachment_3.pdf | ||
| Attachment_1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1354 Checklist
Introduction
The Real Property Officer (RPO) or their representative should be included in the personnel who attend the final inspection of any MCP or other construction project. If the RPO has any questions, the construction agent or contractor will be able to answer them. The RPO should take this checklist along and annotate the items that should be included in the DD 1354, Transfer of Military Real Property, which the construction agent will prepare.
This checklist should be valuable to the Air Force Regional Civil Engineer
Office and to the Army of Navy Construction Agencies because it gives them a general idea of the information that should be included on a DD 1354. Air Force category codes are included for all related items. Category codes for the building or facility should be found on the DD 1391, Military construction Project Data. If it is not, the
Real Property Officer can always furnish it. The RPO should furnish the agent a copy of the BEAMS CAT File, PCN SF 100-551, which can be requested at any time.
It is suggested that the RPO and construction agent work together in the preparation of the DD 1354. The construction agent should either go to the RPO before they begin the DD 1354 and ask what is needed for the record, or construction agent can create a rough draft and take it to the Real Property Office so before before it is finalized and typed.
This checklist may be modified by the Real Property Officer or Construction
Agent to meet the requirement in their geographical or climatic areas; however, most of the “related facilities” will be applicable everywhere.
DD Form 1354 Checklist
Facility
Number Building Name
Number of
Floors
Gross SF Net SF
1. Building Dimensions and Construction Material
Building Outside Dimensions Legnth (LF) Width (LF)
Main Building
Wings
Offsets
Basement
Attic
Porches, Covered
Roof
Foundation
Other Bulding Data Feet
Ceiling Height Main Bldg
Ceiling Height Basement
Door Height
Door With
Code
Fire Rating Code
Construction Materials Type
Principal Struct Material
Secondary Struct Material
Exterior Wall Mateial
Interior Wall Material
Floor Surface Material
Sub-Floor Material
Construction Materials
(Pavements) Type
Surface Course Materials
Base Course Materials
2. Utility Connection, Information, and Fuel Data:
Utility
Connections
Number of
Pipes
Diameter of
Each Pipe
Capacity of
All Inlet
Pipes
Available or
Connected?
(Yes / No)
Water
Gas
Sewer Pipe
Storm Sewer
Pipe
Steam
Condensate
Comm.
System Energy Type
Source
Location
Fuel
Description
Air
Circulation
Heating
Air
Conditioning
Hot Water
Steaam
Electric
Electric
Phase/
Voltage Wire Size
Connected
Load – Amps
Connected
Load - KVA
3. Installed Real Propoerty
a. Building Systems:
(1) Fire Protection System:
Category
Nomenclature
Unit of
Measure
Qty
Cost
Serial Number /
880-211 Closed Head Auto Sprinklers SF
HD
880-212 Open Head Deluge System SF
HD
880-221 Auto Fire Detection System SF
EA
880-222 Manual Fire Alarm System EA
880-231 CO2 Fire System EA
880-232 Foam Fire System EA
880-233 Other Fire System EA
880-234 Halon 1301 Fire System EA
(2) Security System:
872-841 Secuirty Alarm System EA
(3) Heating System:
821-115 Heating Plant 750/3500 MB MB
821-116 Heating Plant Over 3500 MB MB
Storage Tank for Heating GA
Or Generator Fuel TYPE
FUEL
(4) Air Conditioning System:
890-126 A/C Window Units TN
SF
890-125 A/C Plant Less than 5 TN TN
SF
890-121 A/C Plant 5 to 25 TN TN
826-122 A/C Plant 25 to 100 TN TN
826-123 A/C Plant Over 100 TN TN
(5) Electrical System:
811-147 Electric Emergency Power
Generator KW
Storage Tank for Heating GA
b. Real Property Installed Equipment:
Item
Size/
Qty Units
Model
Evaporative Coolers CFM
Hot Water Heater GA
Exhaust Fan CFM
Wash Basin EA
Water Closet EA
Urinal EA
Utility Sink EA
Refrigerated Drinking Fountain EA
Heating Plant under 750 MB MB
Forced Air Heating BTU
Other Heating BTU
Dehumidifiers GPM
Elevators Lbs &
PN
Theater-Type Seats Secured To Floor PN
Other
c. Related Facilities Added:
812-223 Prim Distr Line OH LF
Transformers KVA
Power Poles LF
812-224 Sec Distr Line OH LF
812-225 Prim Distr Line UG LF
812-226 Sec Distr Line UG LF
821-926 Exterior Street Lighting EA or Parking area lights
824-464 Gas Mains LF
831-169 Sewage Septic Tank KG
832-266 Sanitary Sewer LF
812-245 Water Distr Mains LF
843-315 Fire Hydrants EA
851-143 Curbs & Gutters LF
851-145 Driveway SY
851-147 Road SY
LF
852-262 Vehicle Parking SY
871-183 Storm Drain LF
872-247 Fence, Security LF
872-248 Fence, Interior LF
852-289 Sidewalk SY
890-187 Utility Vault SF
(4 or more transformers)
135-583 Tel Duct Facilty LF
135-586 Tel Pole Facilty LF
d. Specialized Facilities/RPIE Added:
(1) Shops:
Amount
Serial Number
Air Compressors HP
Hoists, Cranes (fixed) TN
Hydraulic Lifts TN
Emergency Shower EA
Fixed Spray Paint Booth EA
890-158 Load and Unload Platform SF
832-255 Industrial Waste Main LF
890-144 Compressed Air Dist LF
(2) Chapel:
Pews EA
Altars EA
Lecterns EA
Pulpit EA
(3) Theater:
Theater Seats Secured To:
Floor EA
Fire Screens EA
(4) Billeting Buildings:
Built-in Household EA
Dishwasher
Garbage Disposals EA
Built-in Domestic Ranges EA
And Ovens
Range Canopy w/Exhaust Fan EA
Water Softener, EA
Household Type
(5) MWR Buildings:
Dishwashers, Built-in EA
Walk-in Refrigerators EA
Built-in
Garbage Disposal Unit EA
Range Canopy w/Exhaust EA
System
PA System, Built-in EA
Vault, Built-in EA
Stage and Auditorium
Playground Equipment EA
Permanently Affixed
Bowling Alley Lanes, LA
Approaches, Ball Returns
Load & Unload Platforms SF
(6) Post Office:
Post office lock boxes EA
(7) List any other items installed, but not listed above. Please indicate size, square footage, amount, number of units, etc. as applicable.
4. Removed Real Property
a. Building Systems:
(1) Fire Protection System:
880-211 Closed Head Auto Sprinklers SF
HD
880-212 Open Head Deluge System SF
HD
880-221 Auto Fire Detection System SF
EA
880-222 Manual Fire Alarm System EA
880-231 CO2 Fire System EA
880-232 Foam Fire System EA
880-233 Other Fire System EA
880-234 Halon 1301 Fire System EA
(2) Security System:
872-841 Secuirty Alarm System EA
(3) Heating System:
821-115 Heating Plant 750/3500 MB MB
821-116 Heating Plant Over 3500 MB MB
Storage Tank for Heating GA
(4) Air Conditioning System:
890-126 A/C Window Units TN
SF
890-125 A/C Plant Less than 5 TN TN
SF
890-121 A/C Plant 5 to 25 TN TN
826-122 A/C Plant 25 to 100 TN TN
826-123 A/C Plant Over 100 TN TN
(5) Electrical System:
811-147 Electric Emergency Power
Generator KW
Storage Tank for Heating GA
b. Real Property Installed Equipment:
Item
Size/
Qty Units
Model
Evaporative Coolers CFM
Hot Water Heater GA
Exhaust Fan CFM
Wash Basin EA
Water Closet EA
Urinal EA
Utility Sink EA
Refrigerated Drinking Fountain EA
Heating Plant under 750 MB MB
Forced Air Heating BTU
Other Heating BTU
Dehumidifiers GPM
Elevators Lbs &
PN
Theater-Type Seats Secured To Floor PN
Other
c. Related Facilities Added:
812-223 Prim Distr Line OH LF
Transformers KVA
Power Poles LF
812-224 Sec Distr Line OH LF
812-225 Prim Distr Line UG LF
812-226 Sec Distr Line UG LF
821-926 Exterior Street Lighting EA or Parking area lights
824-464 Gas Mains LF
831-169 Sewage Septic Tank KG
832-266 Sanitary Sewer LF
812-245 Water Distr Mains LF
843-315 Fire Hydrants EA
851-143 Curbs & Gutters LF
851-145 Driveway SY
851-147 Road SY
LF
852-262 Vehicle Parking SY
871-183 Storm Drain LF
872-247 Fence, Security LF
872-248 Fence, Interior LF
852-289 Sidewalk SY
890-187 Utility Vault SF
(4 or more transformers)
135-583 Tel Duct Facilty LF
135-586 Tel Pole Facilty LF
d. Specialized Facilities/RPIE Added:
(1) Shops:
Air Compressors HP
Hoists, Cranes (fixed) TN
Hydraulic Lifts TN
Emergency Shower EA
Fixed Spray Paint Booth EA
890-158 Load and Unload Platform SF
832-255 Industrial Waste Main LF
890-144 Compressed Air Dist LF
(2) Chapel:
Pews EA
Altars EA
Lecterns EA
Pulpit EA
(3) Theater:
Theater Seats Secured To:
Floor EA
Fire Screens EA
(4) Billeting Buildings:
Built-in Household EA
Dishwasher
Garbage Disposals EA
Built-in Domestic Ranges EA
And Ovens
Range Canopy w/Exhaust Fan EA
Water Softener, EA
Household Type
(5) MWR Buildings:
Dishwashers, Built-in EA
Walk-in Refrigerators EA
Built-in
Garbage Disposal Unit EA
Range Canopy w/Exhaust EA
System
PA System, Built-in EA
Vault, Built-in EA
Stage and Auditorium
Playground Equipment EA
Permanently Affixed
Bowling Alley Lanes, LA
Approaches, Ball Returns
Load & Unload Platforms SF
(6) Post Office:
Post office lock boxes EA
(7) List any other items installed, but not listed above. Please indicate size, square footage, amount, number of units, etc. as applicable.
e. List products and materials that can be recovered and remanufactured into a new product. Recyclable materials include, but are not limited to, the following:
1. Metals (ferrous and non-ferrous), including banding, metal studs, ductwork and piping.
2. Aspaltic concrete paving
3. Portland cement concrete
4. Land clearing debris including trees and plant materials
5. Native rock and granular fill
6. Gypsum products
7. Paper and cardboard
8. Wood products, including structural, finish, crates and pallets
9. Brick and masonry
10. Plastics
11. Copper wiring
12. Mechanical and electrical products and equipment
These recyclable products shall be reported by weight to the Contracting
Officer.
File details come from the government source that posted it. Updated .