Performance Plan FA7012-08-R-0001.docx
DOCX document 46 KB Posted
- Attached to
- Remove and Install Floor Coverings Basewide
- Solicitation number
- FA7012-08-R-0001
About this file
Performance Plan
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site visit question answers.doc | DOC document | |
| SOW BASE FLOORING.docx | DOCX document | |
| Base Flooring Site Visit.doc | DOC document | |
| Past Performance Questionnaire.docx | DOCX document | |
| FA7012-08-R-0001 Base Flooring.rtf | RTF text file | |
| BID SCHEDULE BASE FLOORING.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE PLAN
FOR
REMOVAL & INSTALLATION OF
FLOOR COVERINGS
BASEWIDE
COORDINATION REVIEW (Sign and Date):
Functional Commander: _________________________
Contracting Officer: _________________________
Quality Assurance Program Coordinator: _________________________________
BOLLING AFB, D.C.
JULY 2008
ATTACHMENT 3
TABLE OF CONTENTS
Para. No. Para. Title Page No.
| 1. Introduction | 2 | ||||
| 2. Performance Objectives | 2 | 3. Surveillance | 3 | ||
| 4. Standards | 3 | ||||
| 5. Customer Training | 4 | ||||
| 6. | Procedures | 4 |
Attachments:
1. Customer Training Letter
2. Inspection Results Letter
PERFORMANCE PLAN
FOR
REMOVAL & INSTALLATION
OF
FLOOR COVERINGS BASEWIDE
1. INTRODUCTION. This Performance Plan has been developed to evaluate contractor actions while implementing the Performance Work Statement (PWS). It is designed to provide an effective surveillance method of monitoring contractor performance for each listed objective in paragraph 2, Service Summary (SS) in the floor covering contract.
1.1. This Performance Plan provides a systematic method to evaluate the services the contractor is required to furnish.
1.2. This Performance Plan is based on the premise that the government desires to maintain a quality standard in operating, maintaining, and repairing facilities and that a service contract to provide the service is the best means of achieving that objective.
1.3. The contractor, and not the government, is responsible for management and quality control actions to meet the terms of the contract. The role of the government is quality assurance to ensure contract standards are achieved.
1.4. In this contract the quality control program is the driver for product quality. The contractor is required to develop a quality control program. The first major step to ensuring a “self-correcting” contract is to ensure that the quality control program approved at the beginning of the contract provides the measures needed to lead the contractor to success.
1.5. Once the quality control program is accepted, careful application of the process and standards presented in the remainder of this document will ensure a robust quality assurance program.
2. PERFORMANCE OBJECTIVES.
| Performance Objective |
| PWS |
Para
| Performance Threshold |
| Method of Surveillance |
| Remove Existing Floor Covering. |
| 1.2 |
| All existing floor covering shall be removed 100%. No more than 1 validated customer complaints per work requirement. |
| Customer Complaint/ |
Periodic Inspection
| Install New Carpet. |
| 1.4 |
| The contractor shall install new carpet to industrial standards 100% of the time. No more than 1 validated customer complaints per work requirement. |
| Customer Complaint/ Periodic Inspection |
| Install New Vinyl/Linoleum Flooring. |
| 1.5 |
1.6
| The contractor shall install new resilient flooring to industrial standards 100% of the time. No more than 1 validated customer complaints per work requirement. |
| Customer Complaint/ Periodic Inspection |
| Install New Ceramic/Quarry Tile Flooring. |
| 1.7 |
| The contractor shall install new ceramic or quarry tile flooring to industrial standards 100% of the time. No more than 1 validated customer complaints per work requirement. |
| Customer Complaint/ |
Periodic Inspection
| Install New Hardwood Floor Flooring. |
| 1.8 |
| The contractor shall install new hardwood flooring to industrial standards 100% of the time. No more than 1 validated customer complaints per work requirement. |
| Customer Complaint/ |
Periodic Inspection
| Install New Rubber Flooring. |
| 1.2 |
| The contractor shall install new rubber flooring to industrial standards 100% of the time. No more than 1 validated customer complaints per work requirement. |
| Customer Complaint/ |
Periodic Inspection
| Install New Accessories for new flooring,(cove base, transition pieces, etc.). |
| 1.2 |
1.4.5 1.5.6 1.6.2
| The contractor shall install new accessories pieces for flooring to industrial standards 100% of the time. No more than 2 validated customer complaints per work requirement. |
| Customer Complaint/ |
Periodic Inspection
| Lift Modular Furniture |
| 1.12.1 |
| The contractor shall lift all modular furniture without damage. No more than 2 validated customer complaints per work requirement. |
| Customer Complaint/ |
Periodic Inspection
| Site Clean up Accomplished |
| 1.17 |
| 0 Deficiencies permitted |
| Customer Complaint/ |
Periodic Inspection
3. SURVEILLANCE: The government Quality Assurance Personnel (QAP) will receive complaints from facility managers and pass them to the contractor's Quality Control Inspector (QCI) for correction.
4. STANDARDS: Defect are not recorded against the contractor’s performance. However, once the contractor exceeds the number of defects allowed on the performance objectives/standard listed under the performance threshold a discrepancy report is prepared by the QAP and provided to the contractor. Recurring defects are recorded and reported to the Contracting Officer for appropriate action in accordance with FAR 52.212-4, Contract Terms and Conditions-Commercial Items (Feb 2007).
5. CUSTOMER TRAINING: Upon award of the contract, the QAP will conduct customer training with the facility managers by using the attached letter, when an area in the facility is scheduled for floor covering replacement.
6. PROCEDURES: Any facility occupant that observes unacceptable services, either incomplete or not performed, for any of the above performance objectives should immediately contact the facility manager. The facility manager will evaluate the complaints by reviewing the Performance Work Statement (PWS). The facility manager will contact the QAP for coordination with the contractor. The QAP will validate the customer complaint upon receipt from the customer. The QAP should inform the customer of the approximate time the unacceptable performance will be corrected and advise the customer to contact the QAP if not corrected. The QAP will consider the customer complaints as resolved unless notified otherwise by the customer. The QAP will complete the appropriate documentation to record the complaint. The QAP will verbally notify the Contractor’s Quality Control Inspector (QCI) to pick up the written customer complaint. If the QCI disagrees with the complaint after investigation of the site and challenges the validity of the complaint, the QCI will notify the QAP. The QAP will conduct an investigation to determine the validity of the complaint. If the QAP determines the complaint as invalid, the written complaint of the findings will be documented. The QAP will retain the annotated copy of the written complaint for their files. If after investigation, the QAP determines the complaint as valid, the QAP will inform the QCI and the QCI will be given additional time to correct the defect. A defect will not be recorded if proper and timely correction of the unacceptable condition(s) is accomplished. The QCI will return the written customer complaint document, properly completed with actions taken, to the QAP, who will file the complaint for monitoring future recurring performance. If a repeat customer complaint is received indicating the same deficiency during the service period (month, quarter, etc.), the QAP shall contact the Contracting Officer for appropriate action. All customer complaint records, including negative reports, will be forwarded to the Contracting Officer on a monthly basis.
DEPARTMENT OF THE AIR FORCE
11th WING
MEMORANDUM FOR _____________________
(Facility Manager)
FROM: 11 CES/CEOSS
SUBJECT: Customer Training for Base Floor Covering Services
1. Your facility or a section of your facility is scheduled for new floor covering under the subject contract within the terms and conditions of the Performance Work Statement (PWS).
2. If you feel the contractor has performed in an unacceptable manner, you should evaluate the discrepancy by reviewing the Performance Work Statement (PWS). If after reviewing the Performance Work Statement (PWS) you feel that the contractor has indeed performed in an unacceptable manner, please contact the Quality Assurance Personnel (QAP) immediately at the telephone number listed below for correction of the discrepancy.
3. The QAP for the subject contract is __________________, telephone no. _______________.
4. Questions concerning this matter should be directed to _____________________, telephone no. _______________. Please acknowledge receipt of this training by signing this letter in the space provided below.
CARL BUONO, GS-11, DAF
Quality Assurance Personnel
Attachments:
1. Performance Work Statement (PWS)
I acknowledge receipt of this training.
(Printed Name and Signature) (Date)
DEPARTMENT OF THE AIR FORCE
11th WING
MEMORANDUM FOR 11 CONS/LGCF
FROM: 11 CES/CEOSS
SUBJECT: Inspection Results for Base Floor Covering Contract
1. Attached are the copies of the Customer Complaint Records and Surveillance Activity Checklist for the Base Floor Covering Service Contract for the month of:
2. Questions should be directed to Carl Buono, 11CES/CEOSS at (202) 767-8620.
| CARL BUONO, GS-11, DAF |
| Quality Assurance Personnel |
| ANTHONY RILEY, MAJ, USAF |
| Functional Commander |