08-5001_NAF-APF_Addendum_02_Rev0.pdf

PDF 19 KB Posted

Attached to
Amendment 2-FA7000-15-R-0009 Federal contract opportunity
Solicitation number
FA7000-15-R-0009
Issued by
Department of the Air Force Headquarters Air Force Academy

About this file

Addendum 02dated 29 Jun 15

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum No. 2 NAF Project: XQPZ 08-5001 ‘Const New Golf Course Clubhouse’

APF Project: XQPZ 08-5001B ‘APF Infrastructure for NAF Major Construction’

08-5001 naf-apf addendum 02 rev0.docx

Revision 0: Original, 29 Jun 2015

Project Manager: Jeff Young, RA/LEED AP

10 CES/CENMP

8120 Edgerton Drive USAF Academy, CO 80840 Phone: Office: (719) 333-2241 / Mobile: (719) 896-6785

Construction Project Manager: Jeth Fogg, P.E.

10 CES/CECE

8120 Edgerton Drive USAF Academy, CO 80840 Phone: Office: (719) 333-8397

A. With regards to Appropriated Funds (APF) Project 2 XQPZ08-5001B APF

INFRASTRUCTURE SUPPORT FOR MAJOR NAF CONSTRUCTION:

a) Referring to SPECIFICATIONS 100% Submittal Golf Clubhouse APF Project, Construct Utilities to Site of New Clubhouse, USAFA Project Number XQPZ 08- 5001B:

REGARDING DIVISION 01

a. Remove specification section 00 01 15

b. Remove specification section text 01 11 00, 1.3 SUBMITTALS, SD-01:

“Upon receipt of Government Furnished Equipment, the Contractor shall submit records in accordance with paragraph entitled, “Government Furnished Property,” of this section.”

c. Remove specification section 01 11 00, PART 1 GENERAL, 1.4 WORK

COVERED BY CONTRACT DOCUMENTS.

d. Remove specification section 01 11 00, PART 1 GENERAL, 1.5 CONTRACT

DRAWINGS.

e. Remove specification section 01 11 00, PART 1 GENERAL, 1.6 WORK

RESCHEDULING.

f. Remove specification section 01 11 00, PART 1 GENERAL, 1.7 PROJECT

ENVIRONMENTAL GOALS.

g. Remove specification section 01 11 00, PART 1 GENERAL, 1.8

OCCUPANCY OF PREMISES.

h. Remove specification section 01 22 00.00 10, PART 1 GENERAL, 1.2.2 Removal of Hazardous Materials.

i. Remove specification section 01 22 00.00 10, PART 1 GENERAL, 1.3.1 Hazardous Materials Overages.

j. Remove specification section 01 30 00, PART 1 GENERAL, 1.1

SUBMITTALS, 1.2 VIEW LOCATION MAP, 1.3 PROGRESS AND

COMPLETION PICTURES, 1.5 CONTRACTOR SPECIAL REQUIREMENTS,

1.6 SUPERVISION, 1.7 SUPERVISION, 1.9 FACILITY TURNOVER

PLANNING MEETINGS (NAVFAC Red Zone – NRZ) and 1.10

PARTNERING.

k. Remove specification section 01 32 01.00 10, PART 1 GENERAL, 1.1

REFERENCES, 1.2 SUBMITTALS.

l. Remove multiple sub-sections within section 01 32 01.00 10, PART 3 GENERAL, 3.1.3 through 3.11.

Addendum No. 2 NAF Project: XQPZ 08-5001 ‘Const New Golf Course Clubhouse’

APF Project: XQPZ 08-5001B ‘APF Infrastructure for NAF Major Construction’

08-5001 naf-apf addendum 02 rev0.docx

m. Remove specification section 01 32 16.00 20, PART 1 GENERAL, CONSTRUCTION PROGRESS DOCUMENTATION, 1.1 SUBMITTALS and

1.3 SCHEDULE FLOAT and 1.16 PROGRESS SCHEDULE.

n. Remove specification section 01 33 00 SUBMITTAL PROCEDURES.

o. Remove specification section 01 35 40.00 20 ENVIRONMENTAL

MANAGEMENT.

p. Remove specification section 01 50 00 TEMPORARY CONSTRUCTION

FACILITIES AND CONTROLS.

q. Remove specification section 01 57 23 TEMPORARY STORM WATER

POLLUTION CONTROL.

r. Remove specification section 01 74 19 CONSTRUCTION WASTE

MANAGENMENT AND DISPOSAL.

REGARDING DIVISION 02

s. Remove DIVISION 02.

B. With regards to Non-Appropriated Funds (NAF) Project 1 XQPZ08-5001 USAFA

GOLF COURSE CLUBHOUSE:

a) Referring to Specification Section 23 09 00, PART 2 – PRODUCTS, 2.2 CONTROL SYSTEM add a paragraph D. which states the following:

“Provide two emergency shutoff switches (one (1) per floor) in the HVAC control system that can immediately shut down the air distribution and exhaust systems throughout the building and close all dampers leading to the outside. Each switch must be capable of shutting down all required systems and closing all required dampers, even if the local hand/off/auto switch is in the hand position, within 30 seconds of switch activation. Locate the Upper Level shutoff switch in Circulation 102 near door 102. Locate Lower Level switch in Circulation 001 near door 017-2 such that the travel distance to the nearest shutoff switch not be in excess of 200 feet. Ensure that the shutoff switches activate a light at the switch and is well labeled with a sign of a different color than fire alarm pull stations that states ”GOLF

STAFF ONLY – EMERGENGY AIR DISTRIBUTION SHUT-OFF SWITCH”.

END OF ADDENDUM 02

File details come from the government source that posted it. Updated .