3_12_2019_Firing_Range_Cleaning_Site_Visit_Questions_and_Answers.docx
DOCX document 14 KB Posted
- Solicitation number
- FA6712RANGECLEAN
About this file
Questions and Answers Site
View the file
Other files
| File | Type | Posted |
|---|---|---|
| site_visit_sign-in_sheet_3_12_2019.pdf | ||
| site_visit_sign_in_sheet_3_4_2019.pdf | ||
| AF-179-02-01_Firing_Range_Complex_1995Oct.pdf | ||
| 3_04_2019_Firing_Range_Cleaning_Site_Visit_Questions_and_Answers.docx | DOCX document | |
| Firing_Range_SOW_-_September_2018_Rev.docx | DOCX document | |
| DZAQ_15-0001AB_Repair_Firing_Range_Complex,_Bldg_701.pdf | ||
| Firing_Range_SOW_-_September_2018.docx | DOCX document | |
| Firing_Range_SOW_-_September_2018.docx | DOCX document | |
| Wage_Determination.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
03/12/2019 Firing Range Cleaning Site Visit Questions and Answers Q1. I reviewed the mechanical drawings. There is not sufficient information to determine the LF of ducting. We would need the shop drawings. Can the unit of measure for the ventilation system cleaning be changed to a EACH or Lump Sum?
For exhaust ductwork 28”x28” = 5.5 LF per unit, multiply by 11 units = 60.5 LF.
For exhaust ductwork 22”x20”= 8 LF per unit, multiply by 11 units = 88 LF.
For supply ductwork 28”x28” = 9 Linear inches per unit, multiply by 11 units = 8.25 LF.
For supply ductwork 24”x28” = 7 LF per unit, Multiply by 1 unit = 7LF. (Supply ductwork under the platform)
Q2. Are you posting a sign in sheet from the second site visit?
A2. Yes
File details come from the government source that posted it.