WagesAttachment1_Security_Fence_4.3.2019.pdf
PDF 115 KB Posted
- Attached to
- Construct New Ramp Security Fence, Charlie Ramp Federal contract opportunity
- Solicitation number
- FA6712-19-B-A003
About this file
Attachment 1, Wage Determination dated 2/15/2019 - FA6712-19-B-A003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A_15_Amendment_(2)_FA671219BA0030002_SF_30_(1).pdf | ||
| A15__Amendment_One__FA671219BA0030001_SF_30.pdf | ||
| Revised_Specifications_JLSS_17-0025R1_Construct_New_Ramp_Security_Fence,_Charlie_Ramp.pdf | ||
| Revised__Drawings_JLSS_17-0025_Construct_New_Ramp_Security_Fence,_Charlie_Ramp.pdf | ||
| QAs_Security_Ramp_Fencing.docx | DOCX document | |
| Attachment_1_to_QAs.docx | DOCX document | |
| Attachment_2_to_QAs.docx | DOCX document | |
| Entry_Authority_List_Requirements_-_bid_opening_-_fence_project.pdf | ||
| Site_Visit_Agenda_and_Attendees.pdf | ||
| Specifications_JLSS_17-0025R1_.pdf | ||
| Solicitation_-_FA671219BA003.pdf | ||
| Attachment_6_Question_Submission_Form.pdf | ||
| Drawings_JLSS_17-0025.pdf | ||
| FA671219BA003Atch4ResQues.pdf | ||
| Attachment_5_Entry_Authority_List_Requirements.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA6712-19-B-A003 Attachment 1 Page 1
General Decision Number: PA190002 02/15/2019 PA2
Superseded General Decision Number: PA20180004
State: Pennsylvania
Construction Types: Heavy and Highway
Counties: Allegheny, Armstrong, Beaver, Bedford, Blair, Butler, Cambria, Cameron, Centre, Clarion, Clearfield, Clinton, Crawford, Elk, Erie, Fayette, Forest, Franklin, Fulton, Greene, Huntingdon, Indiana, Jefferson, Lawrence, McKean, Mercer, Mifflin, Potter, Somerset, Venango, Warren, Washington and Westmoreland Counties in Pennsylvania.
HEAVY AND HIGHWAY CONSTRUCTION PROJECTS (excluding sewer grouting projects and excluding sewage and water treatment plant projects)
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/04/2019 1 01/11/2019 2 02/15/2019
BOIL0013-005 03/01/2018
CENTRE, FRANKLIN, POTTER, CLINTON, FULTON, HUNTINDON AND MIFFLIN COUNTIES
Rates Fringes
BOILERMAKER......................$ 45.89 33.39
BOIL0154-004 01/01/2017
ALLEGHENY, ARMSTRONG, BEAVER, BEDFORD, BLAIR, BUTLER, CAMBRIA, CAMERON,
CLARION, CLEARFIELD, CRAWFORD, ELK, FAYETTE, FOREST, GREENE, INDIANA,
FA6712-19-B-A003 Attachment 1 Page 2
JEFFERSON, LAWRENCE, MCKEAN, MERCER, SOMERSET, VENANGO, WARREN, WASHINGTON
AND WESTMORELAND COUNTIES
BOILERMAKER......................$ 40.90 27.27
BOIL0744-003 07/01/2008
ERIE COUNTY
Rates Fringes
BOILERMAKER......................$ 35.34 18.48
* BRPA0005-033 05/01/2018
MIFFLIN COUNTY
Rates Fringes
Bricklayer, Stonemason...........$ 31.36 17.73
BRPA0005-046 05/01/2016
FRANKLIN COUNTY
Rates Fringes
Bricklayer, Stonemason...........$ 32.21 14.18
* BRPA0005-071 05/01/2018
CLINTON COUNTY
Rates Fringes
BRICKLAYER.......................$ 33.16 16.31
BRPA0009-004 12/01/2018
BEDFORD, BLAIR,CAMBRIA, CENTRE COUNTY (Halfmoon, Houston, Patton, Rush,Taylor and Worth Townships),FULTON, HUNTINGDON, and SOMERSET COUNTIES
Bricklayer, Stonemason & Marble Setter....................$ 29.46 19.58
BRPA0009-006 12/01/2018
CLEARFIELD, FOREST, JEFFERSON, VENANGO, AND CLARION (Except Brady, Madison, Perry, Porter, Redbank, and Toby Townships) COUNTIES
FA6712-19-B-A003 Attachment 1 Page 3
Bricklayer, Stonemason...........$ 29.90 19.91 Marble mason.....................$ 29.90 19.91
BRPA0009-023 06/01/2018
BEAVER COUNTY
Rates Fringes
BRICKLAYER.......................$ 30.16 21.41
BRPA0009-025 12/01/2018
BUTLER, LAWRENCE, AND MERCER COUNTIES
Rates Fringes
BRICKLAYER.......................$ 30.11 21.64
BRPA0009-032 06/01/2017
FAYETTE (Jefferson & Washington Twps), GREENE (Except Cumberland, Dunkirk, Greene, Monongahelia Twps), INDIANA, AND WESTMORELAND (Rostraver Twp)
COUNTIES
BRICKLAYER.......................$ 31.00 20.66
BRPA0009-033 12/01/2018
ARMSTRONG, CLARION (Brady, Madison, Perry, Tobe, Porter, Redbank Twps), FAYETTE (Except Jefferson & Washington Twps), GREENE (Cumberland, Dunkirk, Greene, Monongahelia Twps), INDIANA, AND WESTMORELAND (Except Rostrave Twp)
BRICKLAYER.......................$ 31.95 21.96
BRPA0009-034 11/01/2017
ERIE COUNTY
Rates Fringes
BRICKLAYER.......................$ 27.55 19.76
BRPA0009-058 12/01/2017
ALLEGHENY, WASHINGTON (Cross Creek, Hanover, Jefferson, Mt. Pleasant, Nottingham, Peters, Robinson, Smith, Union Twps) COUNTIES
FA6712-19-B-A003 Attachment 1 Page 4
BRICKLAYER.......................$ 31.69 21.27
BRPA0009-059 12/01/2018
CAMERON, ELK, McKEAN, POTTER AND WARREN COUNTIES
Rates Fringes
BRICKLAYER.......................$ 27.66 19.67
CARP2235-005 01/01/2019
Rates Fringes
PILEDRIVERMAN
Piledriverman (welder)......$ 35.25 19.30 Piledriverman...............$ 34.30 19.30
CARP2235-006 01/01/2019
Rates Fringes
Diver............................$ 51.45 19.30 Tender...........................$ 34.30 19.30
CARP2274-001 01/01/2019
Rates Fringes
CARPENTER (ALLEGHENY,
ARMSTRONG, BEAVER, BUTLER,
ERIE, FAYETTE, GREENE,
LAWRENCE, MERCER, WASHINGTON,
AND WESTMORELAND COUNTIES)
Carpenters (Welders)........$ 34.97 18.42 Carpenters..................$ 34.02 18.42
CARPENTER (BEDFORD, BLAIR,
CAMBRIA, CAMERON, CENTRE,
CLARION, CLINTON, CLEARFIELD,
CRAWFORD, ELK, FOREST,
FRANKLIN, FULTON, HUNTINGDON,
INDIANA, JEFFERSON, MCKEAN,
MIFFLIN, POTTER, SOMERSET,
VENANGO, AND WARREN COUNTIES)
Carpenters (Welders)........$ 34.72 18.42 Carpenters..................$ 33.77 18.42
ELEC0005-006 12/21/2018
ALLEGHENY, ARMSTRONG, BEDFORD, BLAIR, BUTLER CAMBRIA, CAMERON, CENTRE
(Remainder), CLARION, CLEARFIELD, ELK, FAYETTE, FULTON, GREENE, HUNTINGDON, INDIANA, JEFFERSON, MCKEAN, SOMERSET, VENANGO, WASHINGTON, AND WESTMORELAND
FA6712-19-B-A003 Attachment 1 Page 5
ELECTRICIAN......................$ 40.76 26.34
ELEC0056-004 06/05/2017
ERIE, FOREST AND WARREN COUNTIES
Rates Fringes
ELECTRICIAN......................$ 32.43 3%+22.65
ELEC0126-005 05/28/2018
ALLEGHENY, ARMSTRONG, BEAVER, BEDFORD, BLAIR, CAMBRIA, CENTRE, CLARION,
CLEARFIELD, FAYETTE, FULTON, GREENE, HUNTINGDON, INDIANA, JEFFERSON,
SOMERSET, WASHINGTON AND WESTMORELAND
Line Construction:
Cable Splicer...............$ 46.29 29.25%+11.25 Groundman...................$ 27.77 29.25%+11.25 Lineman.....................$ 46.29 29.25%+11.25 Truck Driver................$ 30.09 29.25%+11.25 Winch Truck Operator........$ 32.40 29.25%+11.25
ELEC0126-007 05/28/2018
FRANKLIN AND MIFFLIN COUNTIES
Rates Fringes
Line Construction:
Cable Splicer...............$ 45.25 29.25%+11.25 Groundman...................$ 27.15 29.25%+11.25 Lineman.....................$ 45.25 29.25%+11.25 Truck Driver................$ 29.41 29.25%+11.25 Winch Truck Operator........$ 31.68 29.25%+11.25
ELEC0143-007 06/01/2018
FRANKLIN and MIFFLIN COUNTIES
Rates Fringes
ELECTRICIAN......................$ 30.60 23.34
ELEC0712-003 01/01/2018
CRAWFORD, BEAVER, LAWRENCE AND MERCER COUNTIES
ELECTRICIAN......................$ 37.55 22.95
FA6712-19-B-A003 Attachment 1 Page 6
ELEC0812-008 06/01/2017
CLINTON COUNTY
Rates Fringes
ELECTRICIAN......................$ 33.59 18.61
ELEC0812-009 06/01/2017
POTTER COUNTY
Rates Fringes
ELECTRICIAN......................$ 34.60 18.64
ELEC0812-011 06/01/2017
CENTRE COUNTY (Burnside, Curtin, Liberty, Howard, Marion, Walker, Miles, Haines Townships)
ELECTRICIAN......................$ 33.59 18.61
ELEC1319-004 09/02/2018
BUTLER, CAMERON, CLINTON, CRAWFORD, ELK, ERIE, FOREST, LAWRENCE, MCKEAN,
MERCER, VENANGO, WARREN AND POTTER COUNTIES
Line Construction:
Equipment Operator..........$ 56.43 19.84 Groundmen...................$ 34.99 11.28 Linemen.....................$ 56.43 22.84 Truck Driver................$ 36.68 11.41
ENGI0066-016 01/01/2019
Rates Fringes
Power equipment operators:
(ALLEGHENY, ARMSTRONG,
BEAVER, BLAIR, BUTLER,
CAMBRIA, CENTRE, CLARION,
CLEARFIELD, CRAWFORD, ERIE,
ELK, FAYETTE, GREENE,
INDIANA, JEFFERSON, LAWRENCE,
MCKEAN, MERCER, SOMERSET,
VENANGO, WARREN, WASHINGTON,
AND WESTMORELAND COUNTIES)
GROUP 1.....................$ 31.89 21.68
GROUP 2.....................$ 31.63 21.68
FA6712-19-B-A003 Attachment 1 Page 7
GROUP 3.....................$ 27.98 21.68
GROUP 4.....................$ 27.52 21.68
GROUP 5.....................$ 27.27 21.68
Power equipment operators:
(BEDFORD, CAMERON, CLINTON,
FOREST, FRANKLIN, FULTON,
HUNTINGDON, MIFFLIN, AND
POTTER COUNTIES)
GROUP 1.....................$ 31.60 21.68
GROUP 2.....................$ 31.32 21.68
GROUP 3.....................$ 27.68 21.68
GROUP 4.....................$ 27.19 21.68
GROUP 5.....................$ 26.98 21.68
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1 - Asphalt Paving Machine (Spreader), Autograde (C.M.I. and similar); Backfiller, Compactor with Blade, Backhoe - 360 and 180 degree Swing; Cableway; Caisson Drill (similar to Hugh Williams), Central Mix Plant; Cooling Plant; Concrete Paving Mixer, Concrete Pump (self-propelled); Cranes; Cranes (boom or mast over 101ft.$.50 per each additional 50 feet inclusive of jib), Cranes (Tower Stationary- Climbing Tower Crane); Derrick; Derrick Boat; Dozer(greater than 25,000 lbs.); Dragline; Dredge;
Dredge Hydraulic; Elevating Grader; Franki Pile Machine;
Gradall (remote control or otherwise),Grader (power-fine grade); Hllift (4 cy. and over); Hoist 2 Drums or more (in one unit); Hydraulic Boom Truck with pivotal cab (single motor-Pitman or similar), (Boom and Mast over 101 feet will be paid an additional 50 feet inclusive of jib if used;)
Kocal; Mechanic, Locomotive (std. Gauge); Metro-chip Harvester or similar; Milling Machine (Roto Mill or similar); Mix Mobile; Mix Mobile (with Self Loading Attachment), Mucking Machine (tunnel); Pile Driver Machine;
Pipe Extrusion Machine; Prespliter Drill (self contained);
Refrigeration Plant (soil Stablization) Rough Terrain Crane (25 ton over) (Boom and Mast over 101 feet will be paid an additional 50 feet inclusive of jib if used); Rough Terrain Crane (under 25 ton), Scrapers; Shovel-Power; Slip form Paver (C.M.I. and similar); Trenching Machine (30,000 lbs.
and over), Trenching Machine (under 30,000 lb.), Tunnell Machine (Mark XXI Jarva or similar), Vermeer Saw, Whirley, Mechanic, Compactor with blade
GROUP 2: Asphalt plant operator; auger (tractor mtd.); auger (truck mtd.); belt loader (euclid or similar); boring machine; cable placer or layer; Directional drill over 3,000 lbs thrust; concrete batch plant (electronically synchronized); concrete belt placer (C.M.I. and similar);
concrete finishing machine and spreader, concrete mixer (over 1 cy.) concrete pump (stationary); core drill (truck or skid mtd. - similar to penn drill), dozer (25,000 lbs or less); Ditch Witch Saw, force feedloader; fork lift (lull or similar); grader - power; grease unit opertor (head);
guard rail post driver (truck mounted) guard rail post driver (skid type); hilift (under 4 cy.); skid steer
FA6712-19-B-A003 Attachment 1 Page 8 loader; hydraulic boom truck (non-pivotal cab); job work boat (powered), jumbo operator; locomotive (narrow guage);
minor equipment operator (accumulative four units); mucking machine; multi-head saw (groover); overhead crane; roller -power- asphalt; ross carrier; side boom or tractor mounted boom; shuttle buggy (asphalt), stone crusher (screening-washing plants); stone spreader (self propelled) truck mounted drill (davey or similar); welder and repairman; well point pump operator; bidwell concrete finishing machine (or similar).
GROUP 3: Broom Finisher (C.M.I. or similar);
Compactors/Rollers (static or vibratory (Self-propelled) on dirt or stone; Curb Builder; Minor Equipment Opertor (two or three units); Multi-head Tie Tamper; Pavement Breaker (self-propelled or ridden); Soil Stablizer Machine; Tire Repairman; Tractor (snaking and hauling); Well Driller and Horizontal: Winch or "A" Frame Truck (when hoisting and lowering).
GROUP 4: Ballast Regulator; Compressor; Concrete Mixer (1
cy. & under with skip); Concrete Saw (Ridden or selp-propelled); Conveyor; Elevator (Material hauling only); Fork-lift (Ridden or self-propelled); Form Line Machine; Generator; Groute Pump; Heater (Machinical); Hoist (single Drum); Ladavator, Light Plant; Mulching Machine;
Personnel Boat (Powered), Pulverizer, Pumps, Seeding Machine, spray Cure Machine (powered Driven); Subgrader;
Tie Puller; Tugger; Welding Machine (Gas or Diesel).
GROUP 5: Deck Hand; Farm Tractor; Fireman on Boiler; Oiler;
Power Broom; Side Delivery Shoulder Spreader (attachment);
IRON0003-001 06/01/2018
ALLEGHENY, FAYETTE, WESTMORELAND, CAMBRIA, INDIANA, ARMSTRONG, BUTLER,
BEAVER, CLARION, AND WASHINGTON COUNTIES
IRONWORKER.......................$ 34.49 30.71
IRON0003-007 06/01/2018
BLAIR, CAMERON, CENTRE, CLEARFIELD, CLINTON, ELK, JEFFERSON, MCKEAN, AND
POTTER COUNTIES
IRONWORKER.......................$ 28.97 28.65
IRON0003-011 06/01/2018
CRAWFORD, ERIE, FOREST, AND WARREN COUNTIES
FA6712-19-B-A003 Attachment 1 Page 9
IRONWORKER.......................$ 29.95 28.59
IRON0207-002 06/01/2018
LAWRENCE, MERCER, AND VENANGO COUNTIES
Rates Fringes
IRONWORKER.......................$ 28.92 24.90
IRON0404-008 07/01/2018
FRANKLIN (Remainder), HUNTINGDON (Remainder), AND MIFFLIN COUNTIES
IRONWORKER, STRUCTURAL...........$ 32.03 29.13
IRON0549-002 12/01/2012
GREENE COUNTY
Rates Fringes
IRONWORKER.......................$ 30.45 16.04
IRON0568-004 05/01/2018
BEDFORD, FRANKLIN (Southwest 1/3), FULTON, HUNTINGDON (Western
2/3), AND SOMERSET COUNTIES
IRONWORKER
Structural, Ornamental, Reinforcing, Machinery Mover, Rigger & Machinery Erector, Welder, Fence Erector.....................$ 28.56 20.61
LABO1058-001 01/01/2019
Rates Fringes
LABORER (BEDFORD, CAMERON,
CENTRE, CLINTON, CRAWFORD,
FOREST, FRANKLIN, FULTON,
HUNTINGDON, JEFFERSON,
MIFFLIN, AND POTTER COUNTIES)
GROUP 1.....................$ 25.35 23.25
GROUP 2.....................$ 25.51 23.25
GROUP 3.....................$ 26.00 23.25
FA6712-19-B-A003 Attachment 1 Page 10
GROUP 4.....................$ 26.45 23.25
GROUP 5.....................$ 26.86 23.25
GROUP 6.....................$ 23.70 23.25
GROUP 7.....................$ 26.35 23.25
GROUP 8.....................$ 27.85 23.25
Laborers: (ALLEGHENY, ARMSTRONG, BEAVER, BLAIR, BUTLER, CAMBRIA, CLARION, CLEARFIELD, ELK, ERIE, FAYETTE, GREENE, INDIANA, LAWRENCE, MCKEAN, MERCER, SOMERSET, VENANGO, WARREN, WASHINGTON, AND WESTMORELAND
COUNTIES)
GROUP 1.....................$ 25.45 23.25
GROUP 2.....................$ 25.61 23.25
GROUP 3.....................$ 26.00 23.25
GROUP 4.....................$ 26.45 23.25
GROUP 5.....................$ 26.86 23.25
GROUP 6.....................$ 23.70 23.25
GROUP 7.....................$ 26.45 23.25
GROUP 8.....................$ 27.95 23.25
LABORERS CLASSIFICATIONS
GROUP 1: Asphalt curb sealer; Asphalt tamper; Batcherman (weigh) Blaster,Boatman, Brakeman, Change house attendant, Coffer dam, Concrete curing pitman, Puddler, Drill Runner's helper (Includes Drill Mounted on Truck, Track, or similar and Davey Drill Spots, Clean up, helps to maintain), Electric Brush and or Grinder, Fence Construction (Including Fence Machine Operator) Form stripper and Mover, Gabion (Erectors and Placers) Hydro jet blaster nozzleman;
Landscape laborer, Manually moved emulusion sprayer, Radio actuated traffic control operator Rip rap work, scaffolds and Runways, Sheeters and Shorers (includes lagging) structural concrete Top Surfacer, Walk Behind Street Sweeper, and Wood Chipper; water boy
GROUP 2: Air tool operator (all types); Asphalt, batch & concrete plant operator (manually operated) Burner, Caisson; men (open air); Carryable pumps; Chain saw operator including attachments, Cribbing, (concrete or steel); Curb machine operator (asphalt or concrete walk behind); Diamond head Core Drller, Drill runner's helper (tunnel) Fork Lift, (walk behind), Form Setter (Road Forms Line man) Highway Slab reinforcement placers (including joint and Basket Setters) Hydraulic pipe pusher; Liner plates (Tile or Vitrified Clay) Mechanical compacting equipment operators, Mechanical joint sealer, Dope pot and Tar Kettle, Mortar mixer (hand or machine) Muckers, Brakemen & all other Labor, (Includes installation of utility lines) Pipe Layers /Fusion /Heating Iron (Regardless of materials) Portable Single Unit Conveyor, Post Hole Auger, (2 or 4 cycle hand operated) Power wheelbarrows and buggies, Rail porter or similar; Sand blaster;Signal Man,Vibrator operator, All RAILROAD TRACK
FA6712-19-B-A003 Attachment 1 Page 11
WORK TO INCLUDE THE FOLLOWING: adzing machine, ballast Router, Bolting Machine, Power Jacks, Rail Drills, Railroad Brakeman,Rail Saws, Spike Drivers (Manually or hand held tool) Spike Pullers Tamping Machine, Thermitweld
GROUP 3: Asphalt Luteman/Raker,Blacksmith, Blaster, Brick, stone and block pavers and block cutters (wood, belgian and asphalt); Cement mortar lining car pusher; Cement mortar mixer (pipe relining); Cement mortar pipe reliners;
concrete saw operator (walk behind); Curb cutters and setters; Elevated roadway drainage construction; erector of overhead signs, Form setter (road forms-lead man); Grout machine operator; Gunite or dry pack gun (nozzle and machine man); Manhole or catch basin builder (Brick block concrete or any prefabrication) Miners and drillers (including lining, supporting and form workmen, setting of shields, miscellaneous equipment and jumbos); Multi-plate pipe (aligning and securing); Placing wire mesh on gunite projects; Wagon drill operators (air track or similar);
Walk behind ditching machine (trencher or similar);crown screed adjuster and welder
GROUP 4: Reinforcing Steel Placer (Bending, aligning, and securing, Cadweld)
GROUP 5:High Burner, (Any burning not done from deck), Welder (Pipeline)
GROUP 6: Uniformed Flagperson, Watchman
GROUP 7: Toxic/Hazardous Waste Removal Laborer Levels C & D
GROUP 8: Toxic/Hazardous Waste Removal Laborer Levels A & B
PAIN0021-019 05/01/2018
CLINTON COUNTY
Rates Fringes
Painters:
Bridge......................$ 36.67 18.80 Brush & Roller..............$ 27.67 18.80 Spray.......................$ 28.67 18.80
PAIN0021-024 05/01/2018
FRANKLIN COUNTY
Rates Fringes
PAINTER
Brush.......................$ 23.92 14.23
PAIN0057-014 06/01/2018
FA6712-19-B-A003 Attachment 1 Page 12
ALLEGHENY, FAYETTE, GREENE, WASHINGTON COUNTIES
Painters:
Bridge......................$ 34.60 19.12 Brush & Roller..............$ 28.00 19.12 Spray.......................$ 28.00 19.12
PAIN0057-015 06/01/2018
ARMSTRONG, BEAVER, BEDFORD, BLAIR, BUTLER,CAMBRIA, CENTRE, CLARION,
CLEARFIELD, ELK, FULTON, HUNTINGTON, INDIANA, JEFFERSON, LAWRENCE, MERCER,
MIFFLIN, SOMERSET, VENANGO AND WESTMORELAND COUNTIES
Painters:
Bridge......................$ 34.60 19.12 Brush and Roller............$ 28.00 19.12 Spray.......................$ 28.00 19.12
PAIN0057-022 05/01/2017
Rates Fringes
Painters: (ERIE, McKEAN, AND WARREN (Including Columbus and Freehold twps) COUNTIES) Bridges,Stacks,Towers.......$ 24.37 17.22 Brush and Roller............$ 21.87 17.22 Spray and Sandblasting......$ 22.62 17.22
PAIN0057-027 06/01/2016
CAMERON, CRAWFORD, POTTER, WARREN, (Excluding Columbus and Freehold twps)
PAINTER
Brush and Roller............$ 25.99 16.67
PLAS0526-002 01/01/2019
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 31.94 20.50
PLUM0027-001 06/01/2017
ALLEGHENY, ARMSTRONG, GREENE (Except extreme Eastern portion), WASHINGTON (Except extreme Eastern portion) and WESTMORELAND (City of Arnold and City of New Kensington Only) COUNTIES
FA6712-19-B-A003 Attachment 1 Page 13
Plumbers and Pipefitters (Bridge Drain Pipe)..............$ 39.20 21.27
PLUM0047-005 05/01/2013
BEAVER, BUTLER, MCKEAN, MERCER, VENANGO, CLARION, LAWRENCE, FOREST, WARREN,
CRAWFORD, AND ERIE COUNTIES
(Bridge Drain Pipe)..............$ 38.52 20.11
PLUM0354-005 06/01/2012
BEDFORD, BLAIR, CAMBRIA, CAMERON, CLEARFIELD, ELK, FAYETTE, GREENE (Extreme Eastern portion), HUNTINGDON, INDIANA, JEFFERSON, SOMERSE, WASHINGTON (Extreme Eastern portion), AND WESTMORELAND COUNTIES
(Bridge Drain Pipe)..............$ 35.54 19.97
TEAM0040-001 01/01/2019
Rates Fringes
TRUCK DRIVER (ALLEGHENY,
ARMSTRONG, BEAVER, BLAIR,
BUTLER, CAMBRIA, CENTRE,
CLARFIELD, CRAWFORD, ERIE,
FAYETTE, GREENE, INDIANA,
JEFFERSON, LAWRENCE, MCKEAN,
MERCER, SOMERSET, VENANGO,
WARREN, WASHINGTON, AND
WESTMORELAND)
GROUP 1.....................$ 28.99 19.43
GROUP 2.....................$ 29.13 19.51
GROUP 3.....................$ 29.59 19.82
Truck drivers: (BEDFORD, CAMERON, CLAIRON, CLINTON, ELK, FOREST, FRANKLIN, FULTON, HUNTINGDON, MIFFLIN, AND POTTER COUNTIES)
GROUP 1.....................$ 28.83 19.32
GROUP 2.....................$ 28.99 19.43
GROUP 3.....................$ 29.45 19.73
FOOTNOTES: A. Hazardous/toxic waste material/work level A & B receive additional $2.50 per hour above classification rate
FA6712-19-B-A003 Attachment 1 Page 14
B. Hazardous/toxic waste materials/Work level C & D receive $1.00 per hour above classification
TRUCK DRIVERS CLASSIFICATIONS
GROUP 1 - Single Axle (2 axles including steering axle);
Includes partsman and warehoueman
GROUP 2 - Tandem - Tri-Axle - Semi-Tractor Trailer (combination) (3 axles or more including steering axle)
GROUP 3 - Specialty Vehicles; Heavy equipment whose capacity exceeds that for which state licenses are issued specifically refers to units in excess of eight (8) feet width (such as Euclids, Atley Wagon, Payloder, Tournawagons, and similar equipment when not self loaded);
Tar and Asphalt Distributors Trucks, Heavy Duty Trailer, such as Low Boy, High Boy
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
FA6712-19-B-A003 Attachment 1 Page 15
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number,005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
FA6712-19-B-A003 Attachment 1 Page 16
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION