Environmental Report

Asbestos Containing Materials and Lead Based Paint Inspection for

Pittsburgh IAP 911th Airlift Wing at

Visiting Quarters – Building 209

Prepared for:

Pittsburgh IAP Air Reserve Station Coraopolis, PA

Prepared for:

L.Robert Kimball and Associates Inc.

415 Moon Clinton Road Coraopolis, PA

November 2009 ©

Asbestos Containing Materials and Lead based Paint Inspection Report for

Visiting Quarters – Building 209

911th Airlift Wing Coraopolis, Pennsylvania

Prepared for:

Pittsburgh IAP Air Reserve Station

Coraopolis, Pennsylvania

Prepared by:

L. Robert Kimball & Associates, Inc.

415 Moon Clinton Road

Coraopolis, Pennsylvania 15108

November 2009

Prepared by:

Richard C. Mance, PG Environmental Scientist Civil & Environmental Division

Reviewed by:

Steven D. Stockton

Assistant Operations Manager Civil & Environmental Division

911th Airlift Wing – VQ Building 209 Coraopolis, Pennsylvania Environmental Inspection

K:\MOON_SHARED\CE\ENVIRON\911th Air Lift VQ Bldgs\Bldg. 209\ACM Report.doc

The following materials have been sampled and found to be ACM.

Friable ACM

• Pipe Fitting Insulation

• Pipe Insulation Debris - observed in the front portion of the crawlspace on soil crawlspace floor. Debris appears to be residual from previous removal of thermal system pipe insulation and may be mixed with soil flooring.

Non-Friable ACM

• Older Drywall Joint Compound

• Basement Window Caulking

• Older Roof Flashing

The following materials have been assumed to be ACM. These materials were not sampled due to inaccessibility to materials, or because sampling would have damaged the function of the component associated with the material:

• Fire Door Insulation

Table 1

Cost Estimate Asbestos-Containing Materials

ACM LOCATION APPROXIMATE

QUANTITY

COST

ESTIMATE

Older Drywall Joint Compound

Basement Walls and Ceilings 7,000 Sq. Ft. $70,000.00

Pipe Fitting Insulation Basement Mechanical Room 2 Fittings $500.00

Pipe Insulation Debris2 Basement Crawlspace 1,000 Sq. Ft. $7,000.00

Basement Window Caulking Exterior Windows 6 Windows $600.00

Older Roof Flashing Original Main Roof - Attic 450 Sq. Ft. $1,800.00

Fire Doors Throughout Building 65 Doors $6500.00

TOTAL $86,400.00

1 Cost includes the removal of drywall sheeting associated with the joint compound.

2 Cost includes the asbestos abatement contractor cleaning entire crawlspace soil floor and if necessary, the removal of soil where debris has been observed to be mixed with soil in the affected areas.

Note: Cost estimates reflect unit pricing averages from select Pittsburgh base asbestos abatement firms. Costs may vary based on the magnitude of materials removed, and whether competitive bidding is used.

3.0 LEAD BASED PAINT

Four (4) paint systems were sampled throughout the building. Three (3) of the four (4) samples collected were found to contain lead above the laboratory limit of detection, at concentrations

1035668990C Highlight

911th Airlift Wing – VQ Building 209 Coraopolis, Pennsylvania Environmental Inspection

K:\MOON_SHARED\CE\ENVIRON\911th Air Lift VQ Bldgs\Bldg. 209\ACM Report.doc ranging from 0.041% to 0.46% lead by weight, and is therefore considered regulated under the Occupational Safety and Health Administration (OSHA).

Table 2 Lead Based Paint Sample Results

Substrate / Component Color Results

% By Weight Parts Per Million (ppm)

North Exterior Emergency Stair Tower Gray over Red 0.041 41

Basement Stairwell Door Jamb Salmon over Green 0.46 460

First Floor Window Sill Pink <0.0082 <8.2

Exterior Building NW Stairs Brown over White 0.089 89

The OSHA Lead in Construction Standard (29 CFR 1926.62) requires all contractors performing demolition or renovation activities to notify and provide training for their employees involved in the alteration and/or repair of lead-containing building components. The contractor is also required to conduct an initial Employee Exposure Assessment. There are no requirements for removing lead based paint during renovation or demolition of buildings however means of minimizing the migration of lead dust must be implemented. In addition, waste stream sampling of renovation waste materials is required under the Resource Conservation and Recovery Act

(RCRA).

The sample was analyzed by International Asbestos Testing Laboratories, Inc. of Mt. Laurel, New Jersey, using ASTM D3335-85A Atomic Absorption Spectrophotometry (AAS). IATL is accredited by the American Industrial Hygiene Association (AIHI) for metals analysis. The paint chip sampling form and the laboratory analysis are found in Appendix D – Lead-based Paint Sample Results.

4.0 MISCELLANEOUS MATERIALS

During the course of Kimball’s asbestos inspection, several other environmental factors were observed:

• Fluorescent light tubes potentially containing mercury were found throughout the building;

• Refrigerators and vending machines possibly containing regulated chlorofluorocarbon refrigerant; and

• Suspect Polychlorinated biphenyl (PCB) containing light ballasts are also present throughout the building.

1035668990C Highlight

PAINT CHIP SAMPLING FORM

BUILDING NAME: Visiting Quarters – Building 209

ADDRESS: 911 Air Wing Coraopolis, PA

SAMPLED BY: Richard Mance/Amanda Neary

DATE: October 13 and 28, 2009

K:\MOON_SHARED\CE\ENVIRON\911TH AIR LIFT VQ BLDGS\BLDG. 209\BLDG 209 PAINT CHIP FORM.DOC

REVISED 01/2004

Sample

No.

TESTING COMBINATION RESULTS

Location

Substrate/

Component

Color

% By

Weight

PPM

0808-209-01P North Exterior Emergency Stair Tower North Exterior

Emergency Stair Tower

Gray over Red 0.041 41

0808-209-01P Basement Stairwell Door Jamb Basement Stairwell Door Jamb

Salmon over Green 0.46 460

0808-209-01P First Floor Window Sill First Floor Window Sill Pink <0.0082 <8.2

0808-209-01P Exterior Building NW Stairs Exterior Building NW Stairs

Brown over White 0.089 89

Appendix D

Lead-Based Paint Chip Laboratory Sample Results

Report Cover
ACM Report
1.0 INTRODUCTION
2.0 ASBESTOS INSPECTION
2.1 Asbestos Sampling
4.0 MISCELLANEOUS MATERIALS
5.0 SUMMARY
divider sheets
List of Homogenous Areas
HA#
YES
Bldg. 209 Bulk Sampling Form
SAMPLE
MATERIAL
HA #
Bldg 209 Paint Chip form
Location
ACM Photograph Log
ACM Photograph Information
IATL2
Certs