RFI_Responses-V4.pdf

PDF 43 KB Posted

Attached to
Building 1654 Renovation Federal contract opportunity
Solicitation number
FA667519RA005
Issued by
Department of the Air Force Reserve Command

About this file

Updated RFI responses (version 4)

View the file

Other files for this federal contract opportunity

Other files attached to Building 1654 Renovation, newest first.
File Type Posted
RFI_Responses-V5.pdf PDF
B1654_Asbestos_and_Lead-Based_Paint_Sampling_Report_(April_18,_2017).pdf PDF
RFI_Responses-V3.pdf PDF
RFI_Responses-V2.pdf PDF
RFI_Responses.pdf PDF
RFI_Responses.pdf PDF
B1654_Pre-bid_Site_Visit_Sign-in_Sheet.pdf PDF
DOL_Wage_Determination.pdf PDF
B1654_Past_Perf_Questionnaire.pdf PDF
RFI_-RFC_FORM.pdf PDF
SPEC_SECT_12_59_00_FURNITURE_SPECS_(A001).pdf PDF
Solicitation_-_FA667519RA005.pdf PDF
SPEC_SECT_12_24_13_WINDOW_SHADES_(A001).pdf PDF
NASJRB-1654Renovation_Specifications_27July2018.pdf PDF
NASJRB_B1654_SubmittalRegister.xls XLS spreadsheet
NASJRB-1654Renovation_Drawings_27July2018.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA667519RA005 – B1654 RENOVATION

RFI Submissions and Responses

Submission-1: The Corian Aqualite spec'd on AF001 is a discontinued product. There does not appear to be "equal to" from any manufacturer. Is there another color/type you would like price instead?

Response-1: Corian "Juniper" color or "equal to from another manufacturer" will be suitable.

Submission-2: AD102 mentions abating all existing asbestos tile in the facility. Is there an asbestos report available?

Response-2: Yes. See attachment labelled “Asbestos Survey and Lead-Based Paint Sampling Report (April 18, 2017)” now posted.

Submission-3: Is it acceptable to submit completed CCASS/CPARS in lieu of the Past Performance Questionnaire (PPQ) document provided?

Response-3: No, CCASS/CPARS report is not an acceptable alternative to the PPQ.

Submission-4: Subgrade Stabilization, Drawing Reference/Detail C2/C- 501 - We would like to substitute the 8” Lime Treatment with 8” of Flex Base. Such a small area and Lime would really make a mess.

Response-4: Disapproved. All work will be completed as designed and according to specifications.

Submission-5: Sheet AE401 indicates that the kitchen appliances are GFCI. Specification 11 31 13 lists appliances and submittal requirements for those. Are we to include the cost of purchasing the appliances in our proposal?

Response-5: The appliances with the GFCI note shall be provided by the government and installed by the contractor. The contractor does not need to provide a submittal for materials.

The contractor needs to account for the labor and material cost to install the specified appliances.

Per sheet M-102, the contractor shall provide and install stainless steel hood over range.

Submission-6: Is there an existing SCADA system in the facility that needs to be removed and re-installed?

FA667519RA005 – B1654 RENOVATION

RFI Submissions and Responses

Response-6: There is no SCADA involved in the project, but HVAC controls are to be demo'd and new controls included with the new HVAC systems per design/spec. Utility metering and Fire Alarm monitoring systems shall be installed and connected per design/ spec.