RFI_Responses-V3.pdf

PDF 39 KB Posted

Attached to
Building 1654 Renovation Federal contract opportunity
Solicitation number
FA667519RA005
Issued by
Department of the Air Force Reserve Command

About this file

RFI Responses-V3

View the file

Other files for this federal contract opportunity

Other files attached to Building 1654 Renovation, newest first.
File Type Posted
RFI_Responses-V5.pdf PDF
RFI_Responses-V4.pdf PDF
B1654_Asbestos_and_Lead-Based_Paint_Sampling_Report_(April_18,_2017).pdf PDF
RFI_Responses-V2.pdf PDF
RFI_Responses.pdf PDF
RFI_Responses.pdf PDF
B1654_Pre-bid_Site_Visit_Sign-in_Sheet.pdf PDF
NASJRB_B1654_SubmittalRegister.xls XLS spreadsheet
NASJRB-1654Renovation_Drawings_27July2018.pdf PDF
RFI_-RFC_FORM.pdf PDF
SPEC_SECT_12_59_00_FURNITURE_SPECS_(A001).pdf PDF
Solicitation_-_FA667519RA005.pdf PDF
DOL_Wage_Determination.pdf PDF
B1654_Past_Perf_Questionnaire.pdf PDF
SPEC_SECT_12_24_13_WINDOW_SHADES_(A001).pdf PDF
NASJRB-1654Renovation_Specifications_27July2018.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA667519RA005 – B1654 RENOVATION

RFI Submissions and Responses

Submission-1: The Corian Aqualite spec'd on AF001 is a discontinued product. There does not appear to be "equal to" from any manufacturer. Is there another color/type you would like price instead?

Response-1: Corian "Juniper" color or "equal to from another manufacturer" will be suitable.

Submission-2: AD102 mentions abating all existing asbestos tile in the facility. Is there an asbestos report available?

Response-2: Yes. See attachment labelled “Asbestos Survey and Lead-Based Paint Sampling Report (April 18, 2017)” now posted.

Submission-3: Is it acceptable to submit completed CCASS/CPARS in lieu of the Past Performance Questionnaire (PPQ) document provided?

Response-3: No, CCASS/CPARS report is not an acceptable alternative to the PPQ.

Submission-4: Subgrade Stabilization, Drawing Reference/Detail C2/C- 501 - We would like to substitute the 8” Lime Treatment with 8” of Flex Base. Such a small area and Lime would really make a mess.

Response-4: Disapproved. All work will be completed as designed and according to specifications.