RFI_Responses-V3.pdf
PDF 39 KB Posted
- Attached to
- Building 1654 Renovation Federal contract opportunity
- Solicitation number
- FA667519RA005
About this file
RFI Responses-V3
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI_Responses-V5.pdf | ||
| RFI_Responses-V4.pdf | ||
| B1654_Asbestos_and_Lead-Based_Paint_Sampling_Report_(April_18,_2017).pdf | ||
| RFI_Responses-V2.pdf | ||
| RFI_Responses.pdf | ||
| RFI_Responses.pdf | ||
| B1654_Pre-bid_Site_Visit_Sign-in_Sheet.pdf | ||
| NASJRB_B1654_SubmittalRegister.xls | XLS spreadsheet | |
| NASJRB-1654Renovation_Drawings_27July2018.pdf | ||
| RFI_-RFC_FORM.pdf | ||
| SPEC_SECT_12_59_00_FURNITURE_SPECS_(A001).pdf | ||
| Solicitation_-_FA667519RA005.pdf | ||
| DOL_Wage_Determination.pdf | ||
| B1654_Past_Perf_Questionnaire.pdf | ||
| SPEC_SECT_12_24_13_WINDOW_SHADES_(A001).pdf | ||
| NASJRB-1654Renovation_Specifications_27July2018.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA667519RA005 – B1654 RENOVATION
RFI Submissions and Responses
Submission-1: The Corian Aqualite spec'd on AF001 is a discontinued product. There does not appear to be "equal to" from any manufacturer. Is there another color/type you would like price instead?
Response-1: Corian "Juniper" color or "equal to from another manufacturer" will be suitable.
Submission-2: AD102 mentions abating all existing asbestos tile in the facility. Is there an asbestos report available?
Response-2: Yes. See attachment labelled “Asbestos Survey and Lead-Based Paint Sampling Report (April 18, 2017)” now posted.
Submission-3: Is it acceptable to submit completed CCASS/CPARS in lieu of the Past Performance Questionnaire (PPQ) document provided?
Response-3: No, CCASS/CPARS report is not an acceptable alternative to the PPQ.
Submission-4: Subgrade Stabilization, Drawing Reference/Detail C2/C- 501 - We would like to substitute the 8” Lime Treatment with 8” of Flex Base. Such a small area and Lime would really make a mess.
Response-4: Disapproved. All work will be completed as designed and according to specifications.