STATEMENT OF WORK
RVKQ 17-0715 - Renovate Building 924
15 May 2018
1. SUMMARY OF WORK: The Contractor shall furnish and install all material, equipment, components, parts, tools, labor, transportation, hauling, disposal/recycling, cleaning, inspection, testing, commissioning, training, reporting, etc., necessary to perform this project as described in the contract-delivery order, including this Statement of Work and any / all applicable federal, state and local law, regulation, standards. Unless otherwise stated, any / all requirement for contractor to remove and properly dispose of / recycle off base, and to furnish and install / incorporate any / all new materials / equipment / components needed to properly complete the work item; any Government furnished property and / or reinstallation of existing materials / equipment /components shall be as stated / specified herein. Contractor shall submit materials / methods for approval prior to ordering and / or incorporation into the work; as a minimum, submittals shall include product literature, MSDS, standard color, texture and style samples / swatches / boards, and place of origin / manufacture. Demolished materials, waste / debris is property of the contractor, unless otherwise stated herein; contractor is responsible for proper disposal / recycling of such materials off base; such materials shall be promptly removed from the installation and shall not be stored / stockpiled unless submitted and approved for such. Contractor is responsible for verification of all details, measurement, etc., prior to ordering materials and execution of work. This building will be occupied during renovation. The contractor must coordinate/ reduce any disruption to occupants during demolition/ build of this project.
2. Install roof reinforcing steel to building adjacent to 924 (B920).
a. Remove/reinstall all electrical, water piping, sprinklers, pneumatics to allow the reinforcing steel to be installed. Note, some alteration of layout is required to go around new steel.
b. Remove/reinstall ductwork as required to allow the reinforcing steel to be installed.
c. Fabricate all required steel to complete the reinforcing steel shown in the Army Corp of Engineers sketches page 1-8 dated 12-2-15. To
914 MSG / CEC
Niagara Falls Air Reserve Station 2405 Franklin Drive Niagara Falls, New York 14304-5063
RVKQ 17-0715 – Renovate Building 924 include all channel columns, channel support beams, web splice plates for the government furnished W21 beams
d. Clean and repaint existing reinforcing steel being stored in the POL yard. See Government Furnished Equipment below.
e. Make all concrete reinforcing as shown in the ACoE sketches for the installation of the reinforcing steel.
f. Install all reinforcing steel as shown on ACoE sketches. Contractor is responsible to verify dimensions and fabricate steel to make all modifications show in the ACoE sketches.
g. All electrical/mechanical is to be rerouted/installed after the steel is erected. Note; there will need to be changes to existing layout of electrical/mechanical items.
h. Paint all steel, walls, and others items that were disturbed during the construction.
i. Any blasting, painting, welding, cutting has environmental and safety requirements. All requirements will be submitted to the contractor prior to work being performed.
3. A submittal of intended materials is requested for the following items for review before installation: steel fabrication drawings, paint colors, electrical/mechanical/plumbing equipment, insulation, exterior siding. Also, see Environmental section below for required submittal documentation.
4. All installation of materials will be per manufacturer’s recommendations and local, state and federal building code requirements. All materials must meet NFPA Fire ratings and IAW current standards.
5. The Contractor shall be responsible for the proper disposal of all materials removed and shall ensure that the facility is secure and available for use at the end of each duty day.
6. Government Furnished Equipment
a. The following reinforcing steel beams are being furnished by the government.
i. Qty 4, W21x44 with WT6 @ 22’-10 3/8”
ii. Qty 4, Flange splice plates @ 1”x8”x48 ½”
7. Environmental Management and Protection
a. A Demolition Plan meeting the requirements of environmental specification section 01 57 20, must be submitted for review prior to any work.
b. A Storm Water Pollution Prevention Plan (for disturbance less than 1 acre) meeting the requirements of environmental specification section 01 57 20, must be submitted for review prior to any work.
RVKQ 17-0715 – Renovate Building 924
c. The contractor must also prepare and submit the U.S. EPA Notification of Demolition for review by 914 MSG/CEV. Upon review and approval, the contractor must submit the completed notification form to the U.S. EPA in accordance with applicable regulations.
d. Demolition materials to be listed on the Waste / Recycle Materials Log for Contractors
e. The contractor is to remove all lamps, ballasts, thermometers, batteries (typically found in exit signs) and any other mercury containing devices and turn over to the 914 MSG/CEV for proper disposal.
8. Green Purchasing
a. Contractor shall comply with the Green Purchasing requirements of the contract. Known / possible EPA Comprehensive Procurement Guideline, USDA Biobased, Green Seal Energy Star, etc., items.
Recycled materials must be used to fullest extent in accordance with Executive Order 13101. The EPA web-site, http://www.epa.gov/cpg, can be accessed for further instruction on what is an EPA-designated material.