FA5685-15-R-0006 Attachment 5 - INC Form 1106
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A7.pdf | ||
| A7.dwg | DWG drawing | |
| FA5685-15-R-0006_Amendment_0002.pdf | ||
| FA5685-15-R-0006-0001_Proposal_Due_Date_Extension.pdf | ||
| LJYC_10-6001-Untabulated_Submittal_Cost.xls | XLS spreadsheet | |
| 15-R-0006_(LJYC_10-6001)_Questions-Answers.docx | DOCX document | |
| FA5685-15-R-0006_Attachment_4_-_INC_Form_1101.xls | XLS spreadsheet | |
| FA5685-15-R-0006_Attachment_2_-_Drawings_(PDF).pdf | ||
| FA5685-15-R-0006_Attachment_3_-_CAD_Drawings.zip | ZIP file | |
| FA5685-15-R-0006_Attachment_1_-_Project_Specifications.pdf | ||
| FA5685-15-R-0006_Construct_EOD_Facility.pdf | ||
| Pre-Solicitation_Notice.docx | DOCX document | |
| Site_Visit_Reservation_Form.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL
| SCHEDULE OF MATERIAL SUBMITTALS | |||||||||||||||
| (INC Form 1106) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | ||||||||||||
| LJYC 10-6001 | CNS EOD FACILITY | ||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||||||||||||||
| NO. OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | |||||||||||||
| AND CLOSEOUT (2) | SHOP DRAWINGS (6) | SAMPLES (2) | COLOR SELECTION (2) | MANUFACTURER'S RECOMMENDATIONS (6) | MANUFACTURER'S WARRANTY (3) | CATALOG DATA (6) | OTHER MATERIAL or DATA (6) | LEED SUBMITTALS (4) | OPERATING INSTRUCTIONS (3) | FIELD QUALITY-CONTROL |
TEST REPORTS (2)
REQUIRED SUBMITTAL
DATE
DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | ||||
| APPROVAL | REMARKS | |||||||
| GENERAL | APPROVED | DISAPPROVED | ||||||
| GENERAL | 3 | |||||||
| 1 | SUBMITTAL SCHEDULE | NTP +10 D |
See Note 1
| 2 | SAFETY PLAN | 3 | |||
| 3 | QUALITY CONTROL PLAN | 3 | |||
| 4 | KEY PERSONNEL LIST | 3 | |||
| 5 | PROGRESS SCHEDULE | 3 | |||
| 6 | EQUIPMENT DELIVERY SCHEDULE | 3 | |||
| 7 | NOTICES FOR PROJECT COMPLETION AND FINAL INSPECTION | 3 | |||
| 8 | OPERATION AND MAINTENANCE MANUALS (Hardcopy: 1 original, 2 copies and 1 CD) | 3 | |||
| 9 | AS BUILT DATA (1 Original, 1 Red Line) | 3 | See Note 2 | ||
| 10 | HAZARDOUS MATERIAL LIST IN AF FORM 3952 | 3 | |||
| 11 | PHASING PLAN | 3 | |||
| 12 | CERTIFICATION AND CALIBRATION DOCUMENTS | ||||
| 13 | CONSTRUCTION DEBRIS TALLY SHEET | ||||
| 14 | EXECUTION PLAN | 3 | |||
| 15 | POWER OUTAGE PLAN | 3 | |||
| NTP - NOTICE TO PROCEED | |||||
| TD - TEST DATE | |||||
| Note 1. Contractor must get submittal schedule approved by CO, before work begins. Contractor's proposed submittal dates for all items on INC-1106 must be on schedule. |
Note 2. Contractor will update road location map with all visible features in accordance with SDSFIE standards.
Update shall be based on field survey, using total station, nivo and/or GPS equipment. Datum shall be in WGS 84 36N format.
&7Page &P of &N
CIVIL
| SCHEDULE OF MATERIAL SUBMITTALS | |||||||||||||||
| (INC Form 1106) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | ||||||||||||
| LJYC 10-6001 | CNS EOD FACILITY | ||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||||||||||||||
| NO. OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | |||||||||||||
| AND CLOSEOUT (2) | SHOP DRAWINGS (6) | SAMPLES (2) | COLOR SELECTION (2) | MANUFACTURER'S RECOMMENDATIONS (6) | MANUFACTURER'S WARRANTY (3) | CATALOG DATA (6) | OTHER MATERIAL or DATA (6) | LEED SUBMITTALS (4) | OPERATING INSTRUCTIONS (3) | FIELD QUALITY-CONTROL |
TEST REPORTS (2)
REQUIRED SUBMITTAL
DATE
DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | |||||||||
| APPROVAL | REMARKS | ||||||||||||
| ELECTRICAL | APPROVED | DISAPPROVED | |||||||||||
| CIVIL | 3 | 3 | 3 | 3 | 3 | ||||||||
| 1 | HDPE WATER PIPES AND FITTINGS, Sec 33 11 00. Item 1.3 | ||||||||||||
| 3 | 3 | 3 | 3 | 3 | |||||||||
| 2 | VALVE AND VALVE BOX 22 33 30.00 10 Sec 3.1.3.4 | 3 | 3 | 3 | 3 | 3 | |||||||
| 3 | MANHOLE FRAMES AND COVERS | ||||||||||||
| DWG C18, C26 | 3 | ||||||||||||
| 4 | HDPE SANITARY PIPES AND FITTINGS, Sec 33 30 00 İtem 1.3 | 3 | 3 | 3 | 3 | 3 | 3 | ||||||
| 5 | BASE COURSE 03 31 00.00 10 Sec 3.1.1.1 | 3 | 3 | 3 | 3 | 3 | |||||||
| 6 | CONCRETE CURING MATERIALS | ||||||||||||
| 03 31 00.00 10 Sec 3.15.2 | 3 | 3 | 3 | 3 | 3 | ||||||||
| 7 | STEEL REINFORCING BARS 04 20 00 Sec 1.3.2 | 3 | 3 | ||||||||||
| 8 | BORROW SITE TESTING | ||||||||||||
| 31 23 00.00 20 | 3 | ||||||||||||
| 9 | FILL AND BACKFILLTEST | ||||||||||||
| 31 23 00.00 20, Sec 3.17.2.1 | 3 | ||||||||||||
| 10 | SELECT MATERIAL TEST | ||||||||||||
| 31 23 00.00 20, Sec 3.17.2.2 | 3 | ||||||||||||
| 11 | DENSITY TESTS | ||||||||||||
| 31 23 00.00 20, Sec 3.17.2.4 | 3 | ||||||||||||
| 12 | STEEL WIRE MESH | ||||||||||||
| 04 20 00 Sec 2.8.1 | 3 | ||||||||||||
| 13 | SWING TYPE CRASH BARRIER, DWG C22 | 3 | 3 | 3 | 3 | 3 | 3 | ||||||
| 14 | HDPE STORM WATER PIPES AND FITTINGS, Sec 33 40 01. Item 1.2 | ||||||||||||
| 3 | 3 | 3 | 3 | 3 | |||||||||
| 15 |
ARCHITECTURAL
| SCHEDULE OF MATERIAL SUBMITTALS | |||||||||||||||
| (INC Form 1106) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | ||||||||||||
| LJYC 10-6001 | CNS EOD FACILITY | ||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||||||||||||||
| NO. OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | |||||||||||||
| AND CLOSEOUT (2) | SHOP DRAWINGS (6) | SAMPLES (2) | COLOR SELECTION (2) | MANUFACTURER'S RECOMMENDATIONS (6) | MANUFACTURER'S WARRANTY (3) | CATALOG DATA (6) | OTHER MATERIAL or DATA (6) | LEED SUBMITTALS (4) | OPERATING INSTRUCTIONS (3) | FIELD QUALITY-CONTROL |
TEST REPORTS (2)
REQUIRED SUBMITTAL
DATE
DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | |||||||
| APPROVAL | REMARKS | ||||||||||
| ELECTRICAL | APPROVED | DISAPPROVED | |||||||||
| ARCHITECTURAL | 3 | 3 | 3 | 3 | 3 | ||||||
| 1 | GYPSUM BOARD & WATER RESISTANT TYPE GYPSUM BOARD WALL COVERING C/W STEEL STUDS & RUNNERS, 09 29 00 Sec 2.1.1 | 3 | 3 | 3 | 3 | 3 | |||||
| 2 | SHOP DRAWINGS FOR GYPSUM BOARD WALLS | 3 | |||||||||
| 3 | EXTERIOR STEEL DOORS AND FRAMES W/ LOUVER, | ||||||||||
| 08 11 13 Sec 2.1 | 3 | 3 | 3 | 3 | 3 | ||||||
| 4 | COIL COATED GALVANIZED CLAMPED TYPE SHEET METAL ROOF PANELS, 0.7 mm thick |
07 61 14.00 20 Sec 3.3.1
| 5 | DOOR CLOSER 08 71 00 Sec 2.5 | 3 | 3 | 3 | 3 | |||||
| 6 | DOOR STOP | |||||||||
| 08 71 00 Sec 2.5 | 3 | 3 | 3 | 3 | ||||||
| 7 | DOOR LOCK 08 71 00 Sec 2.3.2 | 3 | 3 | 3 | 3 | |||||
| 8 | CORE WOOD INTERIOR DOOR 08 14 00 Sec 2.1.2.2 | 3 | 3 | 3 | 3 | 3 | ||||
| 9 | METAL THRESHOLD FOR EXTERIOR DOOR 08 71 00 Sec 3.1.3 | 3 | 3 | 3 | 3 | 3 | ||||
| 10 | STEEL WINDOW C/W HARDWARE AND ALL REQUIRED ACCESSORIES 08 51 23 | 3 | 3 | 3 | 3 | |||||
| 11 | SHOP DRW. FOR STEEL WINDOWS AND DOORS | 3 | ||||||||
| 12 | STEEL DOORS C/W HARDWARE AND ALL REQUIRED ACCESSORIES 08 11 13 | 3 | 3 | 3 | 3 | |||||
| 13 | STEEL LOUVER | |||||||||
| 08 11 13 Sec 2.4.2 | 3 | 3 | 3 | 3 | ||||||
| 14 | FIRE EXTINGUISHER CABINET | 3 | 3 | 3 | 3 | 3 | ||||
| 15 | GYPSUM PUTTY 08 81 00 Sec 2.4.1 | 3 | 3 | 3 | ||||||
| 16 | NON-SKID GRANITE CERAMIC FLOOR TILE 09 30 00 Sec 3.4 | 3 | 3 | 3 | 3 | 3 | ||||
| 17 | CERAMIC WALL TILE 09 30 00Sec 2.1 | 3 | 3 | 3 | 3 | 3 | ||||
| 18 | READY MIXED JOINT GROUT FOR FLOOR AND WALL TILES | |||||||||
| 04 20 00 Sec 2.7 | 3 | 3 | 3 | 3 | 3 | |||||
| 19 | SYNTHETIC PAINT & PRIMER FOR GALVANIZED METAL SURFACE | 3 | 3 | 3 | 3 | 3 | ||||
| 20 | SILICONE BASED EXTERIOR PAINTS, AND PRIMER | |||||||||
| 09 90 00 | 3 | 3 | 3 | 3 | 3 | 3 | ||||
| 21 | WATER BASED INTERIOR PAINTS, AND PRIMER | |||||||||
| 09 90 00 3.15.2 | 3 | 3 | 3 | 3 | 3 | |||||
| 22 | READY MIXED COLORED PLASTER | |||||||||
| 09 90 00 | 3 | 3 | 3 | 3 | 3 | |||||
| 23 | NATURAL GRANITE COUNTER TOP | 3 | 3 | 3 | 3 | 3 | 3 | |||
| 24 | HIGH PRESSURE LAMINATE KITCHEN TOP & BOTTOM CABINETS, C/W SHELVES, DRAWERS & ALL ACC. | 3 | 3 | 3 | 3 | 3 | 3 | |||
| 25 | ELECTROSTATIC PAINTED ALUMINUM & PLEXIGLASS BATHTUB/SHOWERTUB CABINET WITH SLIDING DOORS 10 28 13 Sec 2.2.3.1 | 3 | 3 | 3 | 3 | |||||
| 26 | MIRROR 08 81 00 Sec 2.1.8 | 3 | 3 | 3 | 3 | |||||
| 27 | ACOUSTICAL AND 90% HUMIDITY RESISTANT TYPE, ACOUSTICAL SUS. CEILING SYS., C/W RUNNERS, HANGERS & ACC. 09 51 00 | 3 | 3 | 3 | 3 | |||||
| 28 | SHOP DRAWINGS FOR ACOUSTICAL SUSPENDED CEILING TILES, AND HUMIDITY RESISTANT TYPE, C/W RUNNERS, HANGERS AND ACCESSORIES, DWG A11, A12 | 3 |
FIRE PROTECTION
| SCHEDULE OF MATERIAL SUBMITTALS | |||||||||||||||
| (INC Form 1106) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | ||||||||||||
| LJYC 10-6001 | CNS EOD FACILITY | ||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||||||||||||||
| NO. OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | |||||||||||||
| AND CLOSEOUT (2) | SHOP DRAWINGS (6) | SAMPLES (2) | COLOR SELECTION (2) | MANUFACTURER'S RECOMMENDATIONS (6) | MANUFACTURER'S WARRANTY (3) | CATALOG DATA (6) | OTHER MATERIAL or DATA (6) | LEED SUBMITTALS (4) | OPERATING INSTRUCTIONS (3) | FIELD QUALITY-CONTROL |
TEST REPORTS (2)
REQUIRED SUBMITTAL
DATE
DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | |||||||||||
| APPROVAL | REMARKS | ||||||||||||||
| FIRE PROTECTION | APPROVED | DISAPPROVED | |||||||||||||
| FIRE PROTECTION | |||||||||||||||
| 1 | FIRE PUMP | ||||||||||||||
| Sheet No: FP7 | 3 | 3 | 3 | 3 | 3 | 3 | |||||||||
| 2 | JOCKEY PUMP | ||||||||||||||
| Sheet No: FP7 | 3 | 3 | 3 | 3 | 3 | 3 | |||||||||
| 3 | HYDRAULIC CALCULATIONS | ||||||||||||||
| 21 13 13 0010 - 1.6 | 3 | At completion | |||||||||||||
| 4 | TESTING ADJUSTING & BALANCING | ||||||||||||||
| 21 13 13 0010 - 3.9 | 3 | ||||||||||||||
| 5 | FLOW SWITCH | 3 | 3 | 3 | 3 | 3 | 3 | ||||||||
| 6 | FIRE PROTECTION PIPING & ACCESSORIES | ||||||||||||||
| 21 13 13 0010 - 2.4 | 3 | 3 | 3 | 3 | 3 | ||||||||||
| 7 | SPRINKLER HEADS & ACCESSORIES | ||||||||||||||
| 21 13 13 0010 - 2.9 | 3 | 3 | 3 | 3 | 3 | 3 | |||||||||
| 8 | SUPPORTS & HANGERS | ||||||||||||||
| 21 13 13 0010 - 2.4.2 | 3 | ||||||||||||||
| 9 | PRELIMINARY TEST REPORT | ||||||||||||||
| 21 13 13 0010 - 3.8 | 3 | ||||||||||||||
| 10 | FINAL ACCEPTANCE TEST REPORT | ||||||||||||||
| 21 13 13 0010 - 3.9 | At completion | ||||||||||||||
| 11 | SHOP DRAWINGS OF FIRE PROTECTION SYSTEMS | ||||||||||||||
| SHEET NO. FP7 | 4 | ||||||||||||||
| 12 | VALVES | ||||||||||||||
| (GATE, CHECK, BALL, GLOBE ETC.) 21 13 13 0010 - 2.4.3 | 3 | 3 | 3 | 3 | 3 | 3 | |||||||||
| 13 | ALARM CHECK VALVE ASSEMBLY 21 13 13 0010 - 2.5 | 3 | 3 | 3 | 3 | 3 | 3 |
HVAC
| SCHEDULE OF MATERIAL SUBMITTALS | |||||||||||||||
| (INC Form 1106) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | ||||||||||||
| LJYC 10-6001 | CNS EOD FACILITY | ||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||||||||||||||
| NO. OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | |||||||||||||
| AND CLOSEOUT (2) | SHOP DRAWINGS (6) | SAMPLES (2) | COLOR SELECTION (2) | MANUFACTURER'S RECOMMENDATIONS (6) | MANUFACTURER'S WARRANTY (3) | CATALOG DATA (6) | OTHER MATERIAL or DATA (6) | LEED SUBMITTALS (4) | OPERATING INSTRUCTIONS (3) | FIELD QUALITY-CONTROL |
TEST REPORTS (2)
REQUIRED SUBMITTAL
DATE
DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | ||||||||
| APPROVAL | REMARKS | |||||||||||
| ELECTRICAL | APPROVED | DISAPPROVED | ||||||||||
| HVAC | ||||||||||||
| 1 | PACKAGED ROOF TYPE A/C UNITS | |||||||||||
| 23 82 02.00 10, Sec 2.4 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | |||||
| 2 | AIR HANDLING UNITS (OAPU, VRF) | |||||||||||
| M7 | 3 | 3 | 3 | 3 | 3 | 3 | ||||||
| 3 | OUTSIDE UNIT-HEAT PUMP, HEAT REC. (VRF) | |||||||||||
| M7 | 3 | 3 | 3 | 3 | 3 | 3 | ||||||
| 4 | VRF INTERNAL UNITS | |||||||||||
| M7 | 3 | 3 | 3 | 3 | 3 | 3 | ||||||
| 5 | SOLAR PANELS | |||||||||||
| 22 33 30 00 10, Sec 2.4 | 3 | 3 | 3 | 3 | 3 | 3 | ||||||
| 6 | AXIEL FANS | |||||||||||
| 23 00 00 Sec 2.10.1 | 3 | 3 | 3 | 3 | ||||||||
| 7 | INLINE TYPE FANS | |||||||||||
| 23 00 00 Sec 2.10.1 | 3 | 3 | 3 | 3 | ||||||||
| 8 | DUCTWORK | |||||||||||
| 23 00 00, Sec 2.9 | 3 | 3 | ||||||||||
| 9 | DUCT ACCESSORIES (GRILLES, DAMPERS ETC.) | |||||||||||
| 23 00 00, Sec.2.9.2 | 3 | 3 | 3 | 3 | ||||||||
| 10 | VIBRATION ISOLATORS | 3 | 3 | |||||||||
| 11 | INSULATION (DUCT, PIPE, EQUIPMENT ETC.) | |||||||||||
| 23 07 00 | 3 | 3 | 3 | 3 | ||||||||
| 12 | VRF HVAC SYSTEM | |||||||||||
| M3, M4 | 3 | |||||||||||
| 13 | CIRCULATION PUMPS | |||||||||||
| 22 00 00 | 3 | 3 | 3 | 3 | ||||||||
| 14 | DOMESTIC HOT WATER GENERATOR, | |||||||||||
| 22 00 00 | 3 | 3 | 3 | 3 | 3 | 3 | ||||||
| 15 | COPPER PIPES & FITTINGS | |||||||||||
| 23 82 02.00 10, Sec 2.4.3 | 3 | 3 | ||||||||||
| 16 | SUPPORTS & HANGERS | 3 | ||||||||||
| 17 | TESTING ADJUSTING & BALANCING | |||||||||||
| 23 08 00 00 20 | 3 | |||||||||||
| 18 | VALVES ( GATE, BALL, CHECK, GLOBE ETC.) | |||||||||||
| 22 00 00 | 3 | 3 | 3 | 3 | 3 | |||||||
| 19 | EXPANSION TANK | |||||||||||
| 22 33 30 00 10, Sec 2.7.4 | 3 | 3 | 3 | 3 | 3 | 3 | ||||||
| 20 | DDC CONTROL PAMEL WITH INTEGRATED DESICO CONTROLS | |||||||||||
| 3 | 3 | 3 | 3 | 3 | 3 | 3 | ||||||
| 21 | SHOP DRAWINGS FOR DDC CONTROL PAMEL WITH INTEGRATED DESICO CONTROLS | |||||||||||
| 3 |
PLUMBING
| SCHEDULE OF MATERIAL SUBMITTALS | |||||||||||||||
| (INC Form 1106) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | ||||||||||||
| LJYC 10-6001 | CNS EOD FACILITY | ||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||||||||||||||
| NO. OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | |||||||||||||
| AND CLOSEOUT (2) | SHOP DRAWINGS (6) | SAMPLES (2) | COLOR SELECTION (2) | MANUFACTURER'S RECOMMENDATIONS (6) | MANUFACTURER'S WARRANTY (3) | CATALOG DATA (6) | OTHER MATERIAL or DATA (6) | LEED SUBMITTALS (4) | OPERATING INSTRUCTIONS (3) | FIELD QUALITY-CONTROL |
TEST REPORTS (2)
REQUIRED SUBMITTAL
DATE
DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | ||||||||
| APPROVAL | REMARKS | |||||||||||
| ELECTRICAL | APPROVED | DISAPPROVED | ||||||||||
| PLUMBING | ||||||||||||
| 1 | PP PIPES & ACCESSORIES | |||||||||||
| 22 00 00, Sec 2.1 | 3 | 3 | 3 | 3 | 3 | |||||||
| 2 | LAVATORY | |||||||||||
| 22 00 00, Sec. 2.4.4 | 3 | 3 | 3 | 3 | 3 | 3 | ||||||
| 3 | WATER CLOSET | |||||||||||
| 22 00 00, Sec 2.4.3 | 3 | 3 | 3 | 3 | 3 | 3 | ||||||
| 4 | URINAL | |||||||||||
| 22 00 00, Sec 2.4.2 | 3 | 3 | 3 | 3 | 3 | 3 | ||||||
| 5 | SHOWER TUBS | |||||||||||
| 22 00 00, Sec 2.7 | 3 | 3 | 3 | 3 | 3 | 3 | ||||||
| 6 | MIXING FAUCET | |||||||||||
| 22 00 00, Sec 2.4 | 3 | 3 | 3 | 3 | 3 | 3 | ||||||
| 7 | SHOWER MIXING VALVE | |||||||||||
| 22 00 00, Sec 2.4 | 3 | 3 | 3 | 3 | 3 | 3 | ||||||
| 8 | SHOWER HEADS | |||||||||||
| 22 00 00, Sec 2.4 | 3 | 3 | 3 | 3 | 3 | 3 | ||||||
| 9 | TRAPS | |||||||||||
| 22 00 00, Sec 2.8 | 3 | 3 | 3 | 3 | 3 | |||||||
| 10 | FLOOR DRAIN | |||||||||||
| 22 00 00, Sec. 2.6 | 3 | 3 | 3 | 3 | 3 | 3 | ||||||
| 11 | CLEAN OUT | 3 | 3 | 3 | 3 | 3 | 3 | |||||
| 12 | FLUSH VALVES | |||||||||||
| 22 00 00, Sec.2.4.2 | 3 | 3 | 3 | 3 | 3 | 3 | ||||||
| 13 | PVC WASTE PIPE AND VENT PIPES AND FITTINGS, | |||||||||||
| 22 00 00, Sec 2.1 | 3 | 3 | 3 | 3 | 3 | 3 | ||||||
| 14 | SHOP DRAWING OF PLUMBING SYSTEMS | |||||||||||
| 22 00 00, Sec.1.1 | 3 | |||||||||||
| 15 | TESTING ADJUSTING & BALANCING |
22 00 00, Sec 3.2
| 16 | INSULATION | ||||||
| 23 07 00, Sec 3.2.1.4 | 3 | 3 | 3 | 3 | 3 | 3 | |
| 17 | VALVES ( GATE, BALL, CHECK, GLOBE ETC.) | ||||||
| 22 00 00, Sec 2.3 | 3 | 3 | 3 | 3 | 3 | 3 | |
| 18 | SUPPORTS & HANGERS | ||||||
| 22 00 00, Sec 2.2 | 3 | ||||||
| 19 | WATER HAMMER ARRESTOR | ||||||
| 22 00 00, Sec 2.1.1 | 3 | 3 | 3 | 3 | 3 | 3 | |
| 20 | BACK FLOW PREVENTER | ||||||
| 22 00 00, Sec 2.5 | 3 | 3 | 3 | 3 | 3 | ||
| 21 | SOLAR PANEL | ||||||
| DWG M9 | 3 | 3 | 3 | 3 | 3 |
STRUCTURAL
| SCHEDULE OF MATERIAL SUBMITTALS | |||||||||||||||
| (INC Form 1106) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | ||||||||||||
| LJYC 10-6001 | CNS EOD FACILITY | ||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||||||||||||||
| NO. OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | |||||||||||||
| AND CLOSEOUT (2) | SHOP DRAWINGS (6) | SAMPLES (2) | COLOR SELECTION (2) | MANUFACTURER'S RECOMMENDATIONS (6) | MANUFACTURER'S WARRANTY (3) | CATALOG DATA (6) | OTHER MATERIAL or DATA (6) | LEED SUBMITTALS (4) | OPERATING INSTRUCTIONS (3) | FIELD QUALITY-CONTROL |
TEST REPORTS (2)
REQUIRED SUBMITTAL
DATE
DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | |||||||
| APPROVAL | REMARKS | ||||||||||
| ELECTRICAL | APPROVED | DISAPPROVED | |||||||||
| STRUCTURAL | |||||||||||
| 1 | FORM MATERIAL, 03 11 13.00 10 Sec 2.1 | 3 | 1 | 3 | |||||||
| 2 | REINFORCING STEEL, 03 20 01.00 10 Sec 2.3 | 3 | 3 | ||||||||
| 3 | WELDED STEEL WIRE FABRIC, 03 20 01.00 10 Sec 2.4 | 3 | 3 | ||||||||
| 4 | READY MIXED CONCRETE, | ||||||||||
| 03 31 00.00 10 Sec 3.2 | 3 | 3 | |||||||||
| 5 | CONCRETE ADMIXTURES, | ||||||||||
| 03 31 00.00 10 Sec 3.2 | 3 | 3 | 3 | ||||||||
| 6 | NON-SHRINK GROUT, 03 31 00.00 10 Sec 2.6 | 3 | 3 | ||||||||
| 7 | JOINT FILLER, 03 31 00.00 10 Sec 2.14.1 | 3 | 3 | ||||||||
| 8 | EXPANSION AND CONSTRUCTION JOINT DEVICES, 03 15 13.00 10 Sec 3.1 | 3 | 3 | ||||||||
| 9 | SEALANT, 03 15 13.00 10 Sec 2.3 | 3 | 3 | 3 | |||||||
| 10 | STEEL SECTIONS SEC 05 50 14 | 3 | 3 | 3 | |||||||
| 11 | SHOP AND TOUCH-UP PRIMER, DWG S01 | 3 | 3 | ||||||||
| 12 | SHOP DRAWINGS FOR STEEL SECTIONS | 6 | |||||||||
| 13 | FASTENERS, | ||||||||||
| 07 61 14.00 20, Sec 2.4.2 | 3 | 3 | |||||||||
| 14 | BOLTS, NUTS AND WASHERS, | ||||||||||
| 07 61 14.00 20, Sec 2.4.2 | 3 | 3 |
ELECTRICAL
| SCHEDULE OF MATERIAL SUBMITTALS | |||||||||||||||
| (INC Form 1106) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | ||||||||||||
| LJYC 10-6001 | CNS EOD FACILITY | ||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||||||||||||||
| NO. OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | |||||||||||||
| AND CLOSEOUT (2) | SHOP DRAWINGS (6) | SAMPLES (2) | COLOR SELECTION (2) | MANUFACTURER'S RECOMMENDATIONS (6) | MANUFACTURER'S WARRANTY (3) | CATALOG DATA (6) | OTHER MATERIAL or DATA (6) | LEED SUBMITTALS (4) | OPERATING INSTRUCTIONS (3) | FIELD QUALITY-CONTROL |
TEST REPORTS (2)
REQUIRED SUBMITTAL
DATE
DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | |||||||||
| APPROVAL | REMARKS | ||||||||||||
| ELECTRICAL | APPROVED | DISAPPROVED | |||||||||||
| ELECTRICAL | |||||||||||||
| 1 | ALL KINDS OF ELECTRICAL METALLIC TUBING, GRSC PIPE AND FITTINGS | ||||||||||||
| Sheet No. E9, E10, E11 | 3 | 3 | 3 | ||||||||||
| 2 | ALL KINDS OF CABLE TRAY Sheet No. E1, E21, E22 | 3 | 3 | 3 | |||||||||
| 3 | ALL KINDS OF JUNCTION BOXES Sheet No. E1 | 3 | 3 | 3 | |||||||||
| 4 | ALL KINDS OF WALL SWITCHES Sheet No. E1, E4, E5 | 3 | 3 | 3 | 3 | ||||||||
| 5 | ALL KINDS OF RECEPTACLES Sheet No. E1, E7, E8 | 3 | 3 | 3 | 3 | ||||||||
| 6 | ALL KINDS OF BUILDING WIRE AND CABLE 26 05 19 - 2.1 | 3 | 3 | 3 | |||||||||
| 7 | ALL KINDS OF CIRCUIT BREAKERS 26 24 16 - 2.2 | 3 | 3 | 3 | 3 | ||||||||
| 8 | ALL KINDS OF PANELBOARDS 26 24 16 - 2.1 | 3 | 3 | 3 | |||||||||
| 9 | SHOP DRAWINGS FOR BRANCH CIRCUIT PANELBOARDS | 3 | |||||||||||
| 10 | ALL KINDS OF LIGHTING FIXTURES 26 51 00 - 2.1 | 3 | 3 | 3 | |||||||||
| 11 | SHOP DRAWINGS FOR LIGHTING FIXTURES INSTALLATION | 3 | |||||||||||
| 12 | SHOP DRAWINGS FOR EMERGENCY LIGHTING UNITS INSTALLATION LOCATION AND ILLUMINATION CALCULATION | 3 | |||||||||||
| 13 | ALL KINDS OF EXIT LIGHTS 26 53 00 - 2.1 | 3 | 3 | 3 | 3 | ||||||||
| 14 | ALL KINDS OF ADDRESSABLE FIRE ALARM STATION 28 31 64 - 2.4 | 3 | 3 | 3 | |||||||||
| 15 | ALL KINDS OF COMBINED FIRE ALARM EQUIPMENT | ||||||||||||
| Sheet No. E1, E16, E17, E18 | 3 | 3 | 3 | ||||||||||
| 16 | ALL KINDS OF ADDRESSABLE FIRE ALARM SMOKE DETECTOR 28 31 64 - 2.5.1 | 3 | 3 | 3 | |||||||||
| 17 | ALL KINDS OF ADDRESSABLE FIRE ALARM DUCT TYPE SMOKE DETECTOR. 28 31 64 - 2.5.1.1 | 3 | 3 | 3 | |||||||||
| 18 | ADDRESSABLE FIRE ALARM CONTROL PANEL AND MNS SYSTEM 28 31 64 - 2.1 | 3 | 3 | 3 | 3 | 3 | |||||||
| 19 | SHOP DRAWINGS FIRE ALARM CONTROL PANEL AND MNS SYSTEM INSTALLATION | 3 | |||||||||||
| 20 | MNS AND FIRE ALARM CABLE | ||||||||||||
| Sheet No. E18 | 3 | 3 | 3 | ||||||||||
| 21 | TELEPHONE CABLE Sheet No. E1, E23, E24 | 3 | 3 | 3 | |||||||||
| 22 | ALL KINDS OF DATA/VOIP OUTLET Sheet No. E1, E21, E22, E23 | 3 | 3 | 3 | |||||||||
| 23 | ALL KINDS OF TV OUTLET Sheet No. E1, E21, E22, E24 | 3 | 3 | 3 | |||||||||
| 24 | NON METALLIC CABLE RACK Sheet No. E28 | 3 | 3 | 3 | 3 | ||||||||
| 25 | METALLIC CABLE RACK Sheet No. E28 | 3 | 3 | 3 | 3 | ||||||||
| 26 | PE 500 CABLE Sheet No. E24 | 3 | 3 | 3 |