XLS spreadsheet 159 KB Posted
- Attached to
- Construct EOD Facility Federal contract opportunity
- Solicitation number
- FA5685-15-R-0006
About this file
FA5685-15-R-0006 Attachment 4 - INC Form 1101
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA5685-15-R-0006_Amendment_0002.pdf | ||
| A7.pdf | ||
| A7.dwg | DWG drawing | |
| FA5685-15-R-0006-0001_Proposal_Due_Date_Extension.pdf | ||
| LJYC_10-6001-Untabulated_Submittal_Cost.xls | XLS spreadsheet | |
| 15-R-0006_(LJYC_10-6001)_Questions-Answers.docx | DOCX document | |
| FA5685-15-R-0006_Attachment_5_-_INC_Form_1106.xlsx | XLSX spreadsheet | |
| FA5685-15-R-0006_Attachment_2_-_Drawings_(PDF).pdf | ||
| FA5685-15-R-0006_Attachment_3_-_CAD_Drawings.zip | ZIP file | |
| FA5685-15-R-0006_Attachment_1_-_Project_Specifications.pdf | ||
| FA5685-15-R-0006_Construct_EOD_Facility.pdf | ||
| Pre-Solicitation_Notice.docx | DOCX document | |
| Site_Visit_Reservation_Form.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF3052
| FOR OFFICIAL USE ONLY | |||||||||||
| 20.0 | ENGINEER'S FINAL | ||||||||||
| 1.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 1 | OF | 20 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS EOD FACILITY | 0.00 | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| 0.00 | LJYC 10-6001 | 39th SUPPORT GROUP, INCIRLIK, ADANA, TURKEY | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| R E C A P I T U L A T I O N | |||||||||||
| 1 | CIVIL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 2 | ARCHITECTURAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||
| 3 | STRUCTURAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 4 | MECHANICAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 5 | ELECTRICAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||
| 0 | |||||||||||
| 0 | |||||||||||
| T O T A L | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| AF Form 3052, AUG 85 | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| ENGINEER'S FINAL | |||||||||||
| 2.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 2 | OF | 20 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS EOD FACILITY | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| 0.00 | LJYC 10-6001 | 39th SUPPORT GROUP, INCIRLIK, ADANA, TURKEY | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| CIVIL | 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 1 | DEMOLITION OF EXISTING BUILDING, OPEN SHED, PAVEMENTS AND EXISTING UTILITIES C/W ALL CONNECTIONS | LS | 0.00 | 0.00 | |||||||
| 2 | EXCAVATION FOR PAVEMENTS, INCLUDING UTILITY LINES AND SUBGRADE COMPACTION AND BACKFILL | CM | 0.00 | 0.00 | |||||||
| 3 | CONSTRUCTION OF COMPACTED BASE COURSE FOR ROADS AND WALKWAYS | CM | 0.00 | 0.00 | |||||||
| 4 | CONSTRUCT 20 CM THICK CONCRETE PAVEMENT | SM | 0.00 | 0.00 | |||||||
| 5 | CONSTRUCT SEWER MENHOLE | EA | 0.00 | 0.00 | |||||||
| 6 | PROVIDE AND INSTALL CAST IRON MANHOLE COVER | EA | 0.00 | 0.00 | |||||||
| 7 | PROVIDE AND INSTALL AT/FP WALL | CM | 0.00 | 0.00 | |||||||
| 8 | PROVIDE AND INSTALL NEW f 200 CORRUGATED HDPE PIPE FOR SEWER LINE | LM | 0.00 | 0.00 | |||||||
| 9 | PROVIDE AND INSTALL NEW f 100 PVC SEWER LINE | LM | 0.00 | 0.00 | |||||||
| 10 | PROVIDE AND INSTALL NEW 2'' HDPE WATER LINE | LM | 0.00 | 0.00 | |||||||
| 11 | PROVIDE AND INSTALL NEW 6'' HDPE PIPE | LM | 0.00 | 0.00 | |||||||
| 12 | PROVIDE AND INSTALL NEW 2'' GATE VALVE AND VALVE BOX | EA | 0.00 | 0.00 | |||||||
| 13 | PROVIDE AND INSTALL 6'' POST INDICATOR VALVE | LS | 0.00 | 0.00 | |||||||
| 14 | PROVIDE AND INSTALL NEW f 150 HDPE PIPE FOR WATER LINE | LM | 0.00 | 0.00 | |||||||
| 15 | PROVIDE AND INSTALL 6'' BACK FLOW PREVENTER | LS | 0.00 | 0.00 | |||||||
| 17 | CONSTRUCT 2 M AND 1.2 M WIDE 0.15 M THICK CONCRETE WALKWAY | CM | 0.00 | 0 | |||||||
| AF Form 3052, AUG 85 | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| ENGINEER'S FINAL | |||||||||||
| 3.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 3 | OF | 20 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS EOD FACILITY | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| 0.00 | LJYC 10-6001 | 39th SUPPORT GROUP, INCIRLIK, ADANA, TURKEY | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| 18 | SAND BEDDING FOR UTILIY LINES | 0.00 | 0.00 | ||||||||
| 19 | PROVIDE AND INSTALL BOLLARDS | 0.00 | 0.00 | ||||||||
| 20 | PROVIDE AND INSTALL NEW f 600 CONCRETE PIPE CULVERT | 0.00 | 0.00 | ||||||||
| 21 | PROVIDE AND INSTALL NEW f 300 HDPE DRAINAGE PIPE | 0.00 | 0.00 | ||||||||
| 22 | PROVIDE AND INSTALL NEW f 200 HDPE DRAINAGE PIPE | 0.00 | 0.00 | ||||||||
| 23 | CONSTRUCT STORM MENHOLE | 0.00 | 0.00 | ||||||||
| 24 | PROVIDE AND INSTALL STORM MANHOLE COVER | 0.00 | 0.00 | ||||||||
| 25 | CONSTRUCT HEAD WALL | 0.00 | 0.00 | ||||||||
| 26 | PROVIDE AND INSTALL CATCH BASIN | 0.00 | 0.00 | ||||||||
| 27 | GRADING AND LANDSCAPING | 0.00 | 0.00 | ||||||||
| 28 | CONSTRUCT 30 CM THICK GRAVEL SHOULDER | 0.00 | 0.00 | ||||||||
| 29 | CONSTRUCT HORIZONTAL BORING | 0.00 | 0.00 | ||||||||
| 30 | PROVIDE AND INSTALL SWING TYPE BARRIER | 0.00 | 0.00 | ||||||||
| 31 | CONSTRUCT DRAINAGE MANHOLE | 0.00 | 0.00 | ||||||||
| 32 | PROVIDE AND INSTALL NEW f 160 CORRUGATED DRAINAGE PIPE C/W GEOTEXTILE AND GRAVEL | 0.00 | 0.00 | ||||||||
| 33 | SITE CLEANUP | 0.00 | 0.00 | ||||||||
| 34 | LANDSCAPE ITEMS | 0.00 | 0.00 | ||||||||
| T O T A L | 0.00 | 0.00 | |||||||||
| AF Form 3052, AUG 85 | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| ENGINEER'S FINAL | |||||||||||
| 4.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 4 | OF | 20 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS EOD FACILITY | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| 0.00 | LJYC 10-6001 | 39th SUPPORT GROUP, INCIRLIK, ADANA, TURKEY | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| ARCHITECTURAL | |||||||||||
| 1 | CONSTRUCT HOLLOW CONCRETE MASONRY UNIT WALL, 19x19x39 CM REBAR AND GROUT | SM | 0.00 | ||||||||
| 2 | CONSTRUCT HOLLOW CONCRETE MASONRY UNIT WALL, 15x19x39 CM REBAR AND GROUT | SM | 0.00 | ||||||||
| 3 | PROVIDE AND APPLY EXTERIOR AND READY MIXED COLORED PLASTER | SM | 0.00 | ||||||||
| 4 | PROVIDE AND APPLY INTERIOR PLASTER | SM | 0.00 | ||||||||
| 5 | PROVIDE PAINT AND PAINT EXTERIOR WALLS ONE COAT OF PRIMER AND TWO COATS OF SILICON-BASED PAINT | SM | 0.00 | ||||||||
| 6 | PROVIDE PAINT AND PAINT INTERIOR WALLS ONE COAT OF PRIMER AND TWO COATS OF WATER BASED SATIN PAINT | SM | 0.00 | ||||||||
| 7 | PROVIDE AND INSTALL GYPSUM PANELING ON INSIDE WALLS C/W 3 CM RIGID TYPE GLASSWOOL INSULATION, VAPOR BARRIER AND 12.5 MM GYPSUM BOARD | SM | 0.00 | ||||||||
| 8 | PROVIDE AND INSTALL GYPSUM PANELING ON INSIDE WALLS C/W 5 CM RIGID TYPE GLASSWOOL INSULATION | SM | 0.00 | ||||||||
| 9 | PROVIDE AND INSTALL GALVANIZED STEEL DOWNSPOUT (DIA 100 MM) | LM | 0.00 | ||||||||
| 10 | PROVIDE AND INSTALL GUTTER | LM | 0.00 | ||||||||
| 11 | PROVIDE AND INSTALL COIL COATED GALVANIZED SANDWICH PANEL ROOF PANEL | SM | 0.00 | ||||||||
| 12 | PROVIDE AND INSTALL NON-SKID CERAMIC FLOOR TILES C/W COVEBASE ( 30x30 CM ) | SM | 0.00 | ||||||||
| 13 | PROVIDE AND INSTALL HELICOPTER POLISHED CONCRETE WITH QUARTZ TOPPING | SM | 0.00 | ||||||||
| 14 | PROVIDE AND INSTALL CERAMIC WALL TILE ( 20x20 CM ) | SM | 0.00 | ||||||||
| 15 | PROVIDE AND INSTALL CARPET FLOOR COVERING C/W WERZALITE COVEBASE | SM | 0.00 | ||||||||
| 16 | PROVIDE AND INSTALL WERZALITE WALLGUARD, 14.5 CM HIGH | LM | 0.00 | ||||||||
| 17 | PROVIDE AND INSTALL VINYL FLOORING C/W BASEBOARD | SM | 0.00 | ||||||||
| AF Form 3052, AUG 85 | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| ENGINEER'S FINAL | |||||||||||
| 5.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 5 | OF | 20 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS EOD FACILITY | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| 0.00 | LJYC 10-6001 | 39th SUPPORT GROUP, INCIRLIK, ADANA, TURKEY | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| 18 | PROVIDE AND INSTALL GYPSUM BOARD PANEL C/W PROFILES AND ROCKWOOL INSULATION (20 cm THICK) | SM | 0.00 | ||||||||
| 19 | PROVIDE AND INSTALL DOUBLE STEEL DOOR C/W FRAME, FINISH AND ALL HARDWARE (D1) | EA | 0.00 | ||||||||
| 20 | PROVIDE AND INSTALL SINGLE STEEL DOOR C/W FRAME, FINISH AND ALL HARDWARE (D2) | EA | 0.00 | ||||||||
| 21 | PROVIDE AND INSTALL ROLL-UP DOOR C/W WINDOWS (D3) | EA | 0.00 | ||||||||
| 22 | PROVIDE AND INSTALL DOUBLE STEEL DOOR C/W FRAME, FINISH AND ALL HARDWARE (D4) | EA | 0.00 | ||||||||
| 23 | PROVIDE AND INSTALL DOUBLE STEEL DOOR C/W FRAME, FINISH AND ALL HARDWARE (D5) | EA | 0.00 | ||||||||
| 24 | PROVIDE AND INSTALL SINGLE WOOD DOOR C/W FRAME, FINISH AND ALL HARDWARE (D6) | EA | 0.00 | ||||||||
| 25 | PROVIDE AND INSTALL SINGLE WOOD DOOR C/W FRAME, FINISH AND ALL HARDWARE (D7) | EA | 0.00 | ||||||||
| 26 | PROVIDE AND INSTALL SINGLE WOOD DOOR C/W FRAME, FINISH AND ALL HARDWARE (D7A) | EA | 0.00 | ||||||||
| 27 | PROVIDE AND INSTALL SINGLE STEEL DOOR C/W FRAME, FINISH AND ALL HARDWARE (D8) | EA | 0.00 | ||||||||
| 28 | PROVIDE AND INSTALL DOUBLE STEEL DOOR C/W FRAME, FINISH AND ALL HARDWARE (D9) | EA | 0.00 | ||||||||
| 29 | PROVIDE AND INSTALL SINGLE STEEL VAULT DOOR C/W FRAME, FINISH AND ALL HARDWARE (D10) | EA | 0.00 | ||||||||
| 30 | PROVIDE AND INSTALL SINGLE STEEL DOOR C/W FRAME, FINISH AND ALL HARDWARE (D11) | EA | 0.00 | ||||||||
| 31 | PROVIDE AND INSTALL SINGLE STEEL DOOR C/W FRAME, FINISH AND ALL HARDWARE (D12) | EA | 0.00 | ||||||||
| 32 | PROVIDE AND INSTALL SINGLE ACOUSTICAL WOOD DOOR C/W FRAME, FINISH AND ALL HARDWARE (D13) | EA | 0.00 | ||||||||
| 33 | PROVIDE AND INSTALL SINGLE STEEL DOOR C/W FRAME, FINISH AND ALL HARDWARE (D14) | EA | 0.00 | ||||||||
| 34 | PROVIDE AND INSTALL DOUBLE STEEL DOOR C/W FRAME, FINISH AND ALL HARDWARE (D15) | EA | 0.00 | ||||||||
| 35 | PROVIDE AND INSTALL STEEL WINDOW C/W GLAZING, FRAME, FINISH AND ALL HARDWARE (W1) | EA | |||||||||
| AF Form 3052, AUG 85 | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| ENGINEER'S FINAL | |||||||||||
| 6.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 6 | OF | 20 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS EOD FACILITY | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| 0.00 | LJYC 10-6001 | 39th SUPPORT GROUP, INCIRLIK, ADANA, TURKEY | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| 36 | PROVIDE AND INSTALL STEEL WINDOW C/W GLAZING, FRAME, FINISH AND ALL HARDWARE (W2) | EA | 0.00 | ||||||||
| 37 | PROVIDE AND INSTALL LAMINATED PARTITION C/W GLAZING, FRAME, FINISH AND ALL HARDWARE (P1) | EA | 0.00 | ||||||||
| 38 | PROVIDE AND INSTALL LAMINATED PARTITION C/W GLAZING, FRAME, FINISH AND ALL HARDWARE (P2) | EA | 0.00 | ||||||||
| 39 | PROVIDE AND INSTALL LAMINATED PARTITION C/W GLAZING, FRAME, FINISH AND ALL HARDWARE (P3) | EA | 0.00 | ||||||||
| 40 | PROVIDE AND INSTALL LAMINATED PARTITION C/W GLAZING, FRAME, FINISH AND ALL HARDWARE (P4) | EA | 0.00 | ||||||||
| 41 | PROVIDE AND APPLY WATER INSULATION | SM | 0.00 | ||||||||
| 42 | PROVIDE AND INSTALL COMPACT LAMINATE TOILET CUBICLES C/W SUPPORTS, HARDWARE AND ALL REQUIRED ACCESSORIES | EA | 0.00 | ||||||||
| 43 | PROVIDE AND INSTALL TISSUE HOLDER | EA | 0.00 | ||||||||
| 44 | PROVIDE AND INSTALL SOAP DISPANSER | EA | 0.00 | ||||||||
| 45 | PROVIDE AND INSTALL FLUSH MOUNTED, RECESSED PAPER TOWEL HOLDER AND GARBAGE CAN | EA | 0.00 | ||||||||
| 46 | PROVIDE AND INSTALL MIRROR | EA | 0.00 | ||||||||
| 47 | PROVIDE AND INSTALL HOOK | EA | 0.00 | ||||||||
| 48 | PROVIDE AND INSTALL ACOUSTICAL SUSPENDED CEILING C/W SUSPENSION SYSTEM (60x60 CM) | SM | 0.00 | ||||||||
| 49 | PROVIDE AND INSTALL SHOWER CURTAIN | EA | 0.00 | ||||||||
| 50 | PROVIDE AND INSTALL HUMIDITY RESISTANT SUSPENDED CEILING C/W SUSPENSION SYSTEM (60x60 CM) | SM | 0.00 | ||||||||
| 51 | PROVIDE AND INSTALL UPPER AND BASE CABINETS C/W LAMINATED COUNTER AND ALL ACCESSORIES | LS | 0.00 | ||||||||
| 52 | PROVIDE AND INSTALL DECORATIVE BRICK WALL C/W CONCRETE COLUMNS, DOOR FOR PACKAGE A/C UNIT | LS | |||||||||
| 53 | PROVIDE AND INSTALL MEETING ROOM CEILING C/W STEEL BOX , HOT DIPPED GALVANIZED MESH, ACOUSTICAL FOAM AND SEALANT | LS | 0.00 | ||||||||
| AF Form 3052, AUG 85 | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| ENGINEER'S FINAL | |||||||||||
| 7.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 7 | OF | 20 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS EOD FACILITY | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| 0.00 | LJYC 10-6001 | 39th SUPPORT GROUP, INCIRLIK, ADANA, TURKEY | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| 54 | PROVIDE AND INSTALL LEVELING CONCRETE | SM | 0.00 | ||||||||
| 55 | PROVIDE AND INSTALL TRAPEZOIDAL SANDWICH WALL PANEL WITH MINERAL FIBER INSULATION AND ACCESSORIES | SM | 0.00 | ||||||||
| 56 | PROVIDE AND INSTALL COIL COATED TRAPEZOIDAL SHEET METAL ROOF PANEL C/W ALL ACCESSORIES FOR OPEN SHED | SM | 0.00 | ||||||||
| 57 | PROVIDE AND INSTALL AQUSTICAL WALL PAPER | SM | 0.00 | ||||||||
| 58 | PROVIDE AND INSTALL TERRAZZO TILE (30CMX30CM) C/W BASEBOARD | SM | 0.00 | ||||||||
| 59 | PROVIDE AND INSTALL LOCKERS | EA | 0.00 | ||||||||
| 60 | |||||||||||
| T O T A L | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| AF Form 3052, AUG 85 | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| ENGINEER'S FINAL | |||||||||||
| 8.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 8 | OF | 20 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS EOD FACILITY | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| 0.00 | LJYC 10-6001 | 39th SUPPORT GROUP, INCIRLIK, ADANA, TURKEY | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| STRUCTURAL | 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 1 | EXCAVATION C/W BACKFILLING AND COMPACTION OF SUBGRADE | CM | 0.00 | ||||||||
| 2 | CONSTRUCT AGGREGATE BASE COURSE AND COMPACT | CM | 0.00 | ||||||||
| 3 | CONSTRUCT COMPACTED GRANULAR FILL | CM | 0.00 | ||||||||
| 4 | CONCRETE C/W RE-BARS St IIIb OR WIRE MESH Q 131, CONCRETE C25 WITH FORMWORK | CM | 0.00 | ||||||||
| 5 | 0.5 MM THICK POLYETHYLENE SHEET | SM | 0.00 | ||||||||
| 6 | LEAN CONCRETE C15 | CM | 0.00 | ||||||||
| 7 | CONSTRUCT COMPOSITE FLOOR C/W CONCRETE C25, Q503/503 WIRE MESH, STUDS AND STEEL DECK | SM | 0.00 | ||||||||
| 8 | STRUCTURAL STEEL C/W WELDING, BOLTS AND PAINTING INCLUDING INTERIOR, EXTERIOR STAIR AND PLATFORM | KG | 0.00 | ||||||||
| 9 | SLAB ON GRADE C/W RE-BARS St IIIb OR WIRE MESH Q 221, CONCRETE C30 | CM | 0.00 | ||||||||
| 10 | CONSTRUCT SIDEWALK | CM | 0 | ||||||||
| 11 | SELECTED BACKFILL FOR GRADING | CM | 0 | ||||||||
| 12 | STRIPPING EXCAVATION UNDER GRADED AREAS | CM | 0 | ||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| T O T A L | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| AF Form 3052, AUG 85 | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| ENGINEER'S FINAL | |||||||||||
| 9.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 9 | OF | 20 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS EOD FACILITY | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| 0.00 | LJYC 10-6001 | 39th SUPPORT GROUP, INCIRLIK, ADANA, TURKEY | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| MECHANICAL | 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 1 | PROVIDE AND INSTALL PPRC DOMESTIC COLD WATER PIPE C/W FITTINGS, 1/2" | LM | 0.00 | ||||||||
| 2 | PROVIDE AND INSTALL PPRC DOMESTIC COLD WATER PIPE C/W FITTINGS, 3/4" | LM | 0.00 | ||||||||
| 3 | PROVIDE AND INSTALL PPRC DOMESTIC COLD WATER PIPE C/W FITTINGS, 1" | LM | 0.00 | ||||||||
| 4 | PROVIDE AND INSTALL PPRC DOMESTIC COLD WATER PIPE C/W FITTINGS, 1-1/4" | LM | 0.00 | ||||||||
| 5 | PROVIDE AND INSTALL PPRC DOMESTIC COLD WATER PIPE C/W FITTINGS, 1-1/2" | LM | 0.00 | ||||||||
| 6 | PROVIDE AND INSTALL PPRC DOMESTIC HOT WATER PIPE C/W FITTINGS, 1/2" | LM | 0.00 | ||||||||
| 7 | PROVIDE AND INSTALL PPRC DOMESTIC HOT WATER PIPE C/W FITTINGS, 3/4" | LM | 0.00 | ||||||||
| 8 | PROVIDE AND INSTALL PPRC DOMESTIC HOT WATER PIPE C/W FITTINGS, 1" | LM | 0.00 | ||||||||
| 9 | PROVIDE AND INSTALL PPRC DOMESTIC HOT WATER PIPE C/W FITTINGS, 1-1/4" | LM | 0.00 | ||||||||
| 10 | PROVIDE AND INSTALL ELASTOMERIC RUBBER INSULATION FOR PIPES, 1/2" | LM | 0.00 | ||||||||
| 11 | PROVIDE AND INSTALL ELASTOMERIC RUBBER INSULATION FOR PIPES, 3/4" | LM | 0.00 | ||||||||
| 12 | PROVIDE AND INSTALL ELASTOMERIC RUBBER INSULATION FOR PIPES, 1" | LM | 0.00 | ||||||||
| 13 | PROVIDE AND INSTALL ELASTOMERIC RUBBER INSULATION FOR PIPES, 1-1/4" | LM | 0.00 | ||||||||
| 14 | PROVIDE AND INSTALL ELASTOMERIC RUBBER INSULATION FOR PIPES, 1-1/2" | LM | 0.00 | ||||||||
| 15 | PROVIDE AND INSTALL 50 MM PVC WASTE WATER AND VENT PIPE C/W FITTINGS | LM | 0.00 | ||||||||
| 16 | PROVIDE AND INSTALL 70 MM PVC WASTE WATER AND VENT PIPE C/W FITTINGS | LM | 0.00 | ||||||||
| AF Form 3052, AUG 85 | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| ENGINEER'S FINAL | |||||||||||
| 10.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 10 | OF | 20 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS EOD FACILITY | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| 0.00 | LJYC 10-6001 | 39th SUPPORT GROUP, INCIRLIK, ADANA, TURKEY | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| 17 | PROVIDE AND INSTALL 100 MM PVC WASTE WATER AND VENT PIPE C/W FITTINGS | LM | 0.00 | ||||||||
| 18 | PROVIDE AND INSTALL WATER CLOSET C/W FLUSH TANK | EA | 0.00 | ||||||||
| 19 | PROVIDE AND INSTALL SHOWER C/W FIXTURE, VALVES & TRAP | EA | 0.00 | ||||||||
| 20 | PROVIDE AND INSTALL URINAL WITH AUTOMATIC FLUSH SYSTEM | EA | 0.00 | ||||||||
| 21 | PROVIDE AND INSTALL WATER HAMMER ARRESTOR | EA | 0.00 | ||||||||
| 22 | PROVIDE AND INSTALL LAVATORY C/W FAUCET, VALVES AND TRAP | EA | 0.00 | ||||||||
| 23 | PROVIDE AND INSTALL SINK C/W FIXTURES, VALVES AND TRAP | EA | 0.00 | ||||||||
| 24 | PROVIDE AND INSTALL UPRIGHT SPRINKLERS | EA | 0.00 | ||||||||
| 25 | PROVIDE AND INSTALL PENDANT SPRINKLERS | LS | 0.00 | ||||||||
| 26 | PROVIDE AND INSTALL SPRINKLER SYSTEM C/W PIPING, FITTINGS, VALVES, INSPECTOR'S TEST VALVE, WET ALARM VALVE | LS | 0.00 | ||||||||
| 27 | PROVIDE AND INSTALL FIRE PUMP AND JOCKEY PUMP, C/W PANELS, ELECTRICAL CONTROLS AND ACCESSORIES | EA | 0.00 | ||||||||
| 28 | PROVIDE AND INSTALL DOUBLE CHECK TYPE BACKFLOW PREVENTER, 6'' | EA | 0.00 | ||||||||
| 29 | PROVIDE AND INSTALL POST INDICATOR VALVE, 6'' | EA | 0.00 | ||||||||
| 30 | PROVIDE AND INSTALL HEAT RECOVERY TYPE VRF OUTDOOR UNIT (45 kW Cooling) C/W ALL ACCESSORIES | EA | 0.00 | ||||||||
| 31 | PROVIDE AND INSTALL PRECISION A/C UNIT WITH REMOTE CONDENSER | EA | 0.00 | ||||||||
| 32 | PROVIDE AND INSTALL VRF INTERNAL UNITS C/W ALL ACCESSORIES | EA | 0.00 | ||||||||
| 33 | PROVIDE AND INSTALL OUTDOOR AIR PROCESSING UNITS C/W ALL ACCESSORIES | EA | 0.00 | ||||||||
| 34 | PROVIDE AND INSTALL COPPER PIPING FOR VRF SYSTEM C/W INSULATION, FITTINGS, HANGERS, SYSTEM CONTROLLER…ETC. | LS | 0.00 | ||||||||
| AF Form 3052, AUG 85 | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| ENGINEER'S FINAL | |||||||||||
| 11.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 11 | OF | 20 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS EOD FACILITY | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| 0.00 | LJYC 10-6001 | 39th SUPPORT GROUP, INCIRLIK, ADANA, TURKEY | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| 35 | PROVIDE AND INSTALL HEAT RECOVERY TYPE VRF OUTDOOR UNIT (45 kW Cooling) C/W ALL ACCESSORIES | EA | 0.00 | ||||||||
| 36 | PROVIDE AND INSTALL PACKAGE ROOFTOP HEAT PUMP UNIT 23.5 kW COOLING | EA | 0.00 | ||||||||
| 37 | PROVIDE AND INSTALL VRF INTERNAL UNITS C/W ALL ACCESSORIES | EA | 0.00 | ||||||||
| 38 | PROVIDE AND INSTALL OUTDOOR AIR PROCESSING UNITS C/W ALL ACCESSORIES | EA | 0.00 | ||||||||
| 39 | PROVIDE AND INSTALL COPPER PIPING FOR VRF SYSTEM C/W INSULATION, FITTINGS, HANGERS, SYSTEM CONTROLLER…ETC. | LS | 0.00 | ||||||||
| 41 | PROVIDE AND INSTALL SOLAR PANELS C/W ACCESSORIES | EA | 0.00 | ||||||||
| 42 | PROVIDE AND INSTALL SOLAR WATER STORAGE TANK (1000 LT) C/W ACCESSORIES | EA | 0.00 | ||||||||
| 43 | PROVIDE AND INSTALL EXPENSION TANK 100 lt, C/W ACCESSORIES | EA | 0.00 | ||||||||
| 45 | PROVIDE AND INSTAL SOLAR TWIN CIRCULATION PUMP C/W ACCESSORIES | EA | 0.00 | ||||||||
| 46 | PROVIDE AND INSTALL FRESH AIR DUCTS C/W INSULATION, HANGERS, DAMPERS,…ETC. | SM | 0.00 | ||||||||
| 47 | PROVIDE AND INSTALL SUPPLY DIFFUSERS AND RETURN GRILLES | EA | 0.00 | ||||||||
| 48 | PROVIDE AND INSTALL WALL TYPE AXIAL EXHAUST FANS (20 - 75 l/s) | EA | 0.00 | ||||||||
| 49 | PROVIDE AND INSTALL CENTRIFUGAL TYPE INLINE EXHAUST FANS (165 L/s) | EA | 0.00 | ||||||||
| 50 | PROVIDE AND INSTALL BC CONTROLLER UNITS (VRV SYSTEM) | EA | 0.00 | ||||||||
| 51 | PROVIDE AND INSTALL ROOF TYPE EXHAUST FANS (1000 l/s) | EA | 0.00 | ||||||||
| 50 | PROVIDE AND INSTALL PPRC PIPE C/W FITTINGS, 3/4" | LM | 0.00 | ||||||||
| 51 | PROVIDE AND INSTALL GATE VALVES, CHECK VALVES, STRAINERS, TEMPERATURE AND PRESSURE GAUGES FOR VRF AND SOLAR CIRCULATION SYSTEMS | LS | 0.00 | ||||||||
| T O T A L | |||||||||||
| AF Form 3052, AUG 85 | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| ENGINEER'S FINAL | |||||||||||
| 12.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 12 | OF | 20 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS EOD FACILITY | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| 0.00 | LJYC 10-6001 | 39th SUPPORT GROUP, INCIRLIK, ADANA, TURKEY | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| 52 | PROVIDE AND INSTALL LOW LEAKAGE TYPE MOTORIZED DAMPERS | EA | 0.00 | ||||||||
| 53 | PROVIDE AND INSTALL MOTORIZED DAMPERS | EA | 0.00 | ||||||||
| 54 | PROVIDE AND INSTALL SOUND INSULATED FLEXIBLE DUCT | LM | 0.00 | ||||||||
| 55 | PROVIDE AND INSTALL DIFFUSERS WITH SOUND INSULATED PLENUM | EA | 0.00 | ||||||||
| 56 | PROVIDE AND INSTALL EMERGENCY EYE WASH SHOWER | EA | 0.00 | ||||||||
| 57 | PROVIDE AND INSTALL THERMOSTATIC VALVE FOR DOMESTIC HOT WATER | EA | 0.00 | ||||||||
| 58 | PROVIDE AND INSTALL FLOOR DRAIN (P11) | EA | 0.00 | ||||||||
| 59 | PROVIDE AND INSTALL FLOOR DRAIN (P12-P13) | EA | 0.00 | ||||||||
| 60 | PROVIDE AND INSTALL SIDEWALL SPRINKLERS | EA | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||||
| AF Form 3052, AUG 85 | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| ENGINEER'S FINAL | |||||||||||
| 13.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 13 | OF | 20 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS EOD FACILITY | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| 0.00 | LJYC 10-6001 | 39th SUPPORT GROUP, INCIRLIK, ADANA, TURKEY | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| ELECTRICAL | 0.00 | 0.00 | 0.00 | ||||||||
| 1 | PROVIDE AND INSTALL CIRCUIT BREAKER FOR MAIN PANEL 3x315A, 36 kA IN TR93 TRANSFORMER SUBSTATION | EA | 0.00 | ||||||||
| 2 | PROVIDE AND INSTALL CIRCUIT BREAKER FOR FIRE PUMP 3x250A, 36 kA IN TR93 TRANSFORMER SUBSTATION | EA | 0.00 | ||||||||
| 3 | PROVIDE AND INSTALL MAIN FEEDER CABLE, 1x150 mm2 2XY | LM | 0.00 | ||||||||
| 4 | PROVIDE AND INSTALL FIRE PUMP FEEDER CABLE, 1x35 mm2 2XY | LM | 0.00 | ||||||||
| 5 | PROVIDE AND INSTALL MAIN DISTRIBUTION PANEL, PANEL MDP, 380/220 V | EA | 0.00 | ||||||||
| 6 | PROVIDE AND INSTALL MAIN DISTRIBUTION PANEL, PANEL MDP1, 208/120 V | EA | 0.00 | ||||||||
| 7 | PROVIDE AND INSTALL FIRE PUMP SPLICE BOX, PANEL FPSB | EA | 0.00 | ||||||||
| 8 | PROVIDE AND INSTALL LIGHTING PANEL, PANEL LP1 | EA | 0.00 | ||||||||
| 9 | PROVIDE AND INSTALL LIGHTING PANEL, PANEL LP2 | EA | 0.00 | ||||||||
| 10 | PROVIDE AND INSTALL LIGHTING PANEL, PANEL PP1 | EA | 0.00 | ||||||||
| 11 | PROVIDE AND INSTALL POWER PANEL, PANEL PP2 | EA | 0.00 | ||||||||
| 12 | PROVIDE AND INSTALL POWER PANEL, PANEL PP3 | EA | 0.00 | ||||||||
| 13 | PROVIDE AND INSTALL POWER PANEL, PANEL PP4 | EA | 0.00 | ||||||||
| 14 | PROVIDE AND INSTALL POWER PANEL, PANEL PP5 | EA | 0.00 | ||||||||
| 15 | PROVIDE AND INSTALL POWER PANEL, PANEL PP6 | EA | 0.00 | ||||||||
| 16 | PROVIDE AND INSTALL POWER PANEL, PANEL MCC+DDC | EA | 0.00 | ||||||||
| 17 | PROVIDE AND INSTALL SURFACE-MOUNTED WEATHERPROOF 1x36 W FLUORESCENT LIGHTING FIXTURE WITH PRISMATIC POLYCARBONATE COVER | EA | 0.00 | ||||||||
| AF Form 3052, AUG 85 | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| ENGINEER'S FINAL | |||||||||||
| 14.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 14 | OF | 20 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS EOD FACILITY | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| 0.00 | LJYC 10-6001 | 39th SUPPORT GROUP, INCIRLIK, ADANA, TURKEY | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| 18 | PROVIDE AND INSTALL SURFACE-MOUNTED WEATHERPROOF 2x36 W FLUORESCENT LIGHTING FIXTURE WITH PRISMATIC POLYCARBONATE COVER | EA | 0.00 | ||||||||
| 19 | PROVIDE AND INSTALL RECESSED 2x14 W FLUORESCENT LIGHTING FIXTURE | EA | 0.00 | ||||||||
| 20 | PROVIDE AND INSTALL RECESSED 3x14 W FLUORESCENT LIGHTING FIXTURE | EA | 0.00 | ||||||||
| 21 | PROVIDE AND INSTALL RECESSED 4x14 W FLUORESCENT LIGHTING FIXTURE | EA | 0.00 | ||||||||
| 22 | PROVIDE AND INSTALL SURFACE MOUNTED 4x14 W FLUORESCENT LIGHTING FIXTURE | EA | 0.00 | ||||||||
| 23 | PROVIDE AND INSTALL EXIT LIGHT C/W BATERIES CHARGER UNIT AND LAMP | EA | 0.00 | ||||||||
| 24 | PROVIDE AND INSTALL BATTEN FLUORESCENT LIGHT FIXTURE, TL5 1x14 W | EA | 0.00 | ||||||||
| 25 | PROVIDE AND INSTALL HIGH-BAY LIGHTING FIXTURE WITH 150 W INDCUTION LAMP | EA | 0.00 | ||||||||
| 26 | PROVIDE AND INSTALL DUAL TYPE OCCUPANCY SENSORS AND ROOM CONTROL UNITS C/W ACCESSORIES | LS | 0.00 | ||||||||
| 27 | PROVIDE AND INSTALL EMERGENCY POWER PACK FOR FLUORESCENT LIGHT FIXTURE | EA | 0.00 | ||||||||
| 28 | PROVIDE AND INSTALL EXTERIOR LIGHTING LED FIXTURE, WALL MOUNTED, 40 W | EA | 0.00 | ||||||||
| 29 | PROVIDE AND INSTALL SURFACE-MOUNTED LED LIGHTING FIXTURE, 24 W | EA | 0.00 | ||||||||
| 30 | PROVIDE AND INSTALL LIGHT SWITCH | EA | 0.00 | ||||||||
| 31 | PROVIDE AND INSTALL THREE WAY LIGHT SWITCH | EA | 0.00 | ||||||||
| 32 | PROVIDE AND INSTALL LIGHT SWITCH, WEATHERPROOF | EA | 0.00 | ||||||||
| 33 | PROVIDE AND INSTALL SWITCH FOR FANS | EA | 0.00 | ||||||||
| 34 | PROVIDE AND INSTALL DOUBLE POLE, DOUBLE THROW LIGHT SWITCH | EA | 0.00 | ||||||||
| 35 | PROVIDE AND INSTALL PHOTOCELL EYE | EA | 0.00 | ||||||||
| AF Form 3052, AUG 85 | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| ENGINEER'S FINAL | |||||||||||
| 15.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 15 | OF | 20 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS EOD FACILITY | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| 0.00 | LJYC 10-6001 | 39th SUPPORT GROUP, INCIRLIK, ADANA, TURKEY | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| 36 | PROVIDE AND INSTALL DUPLEX RECEPTACLE, 16 A, 220 VAC | EA | 0.00 | ||||||||
| 37 | PROVIDE AND INSTALL SINGLE RECEPTACLE, 16 A, 220 VAC | EA | 0.00 | ||||||||
| 38 | PROVIDE AND INSTALL NEMA TYPE DUPLEX RECEPTACLE, 120 VAC, 20 A | EA | 0.00 | ||||||||
| 39 | PROVIDE AND INSTALL MULTI RECEPTACLE, 16 A, 220 VAC | EA | 0.00 | ||||||||
| 40 | PROVIDE AND INSTALL WEATHERPROOF SINGLE RECEPTACLE, 16 A, 220 VAC | EA | 0.00 | ||||||||
| 41 | PROVIDE AND INSTALL WEATHERPROOF THREE PHASE RECEPTACLE, 380 VAC | EA | 0.00 | ||||||||
| 42 | PROVIDE AND INSTALL WEATHERPROOF DISCONNECT SWITCH, 3P, 32A | EA | 0.00 | ||||||||
| 43 | PROVIDE AND INSTALL WEATHERPROOF DISCONNECT SWITCH, 3P, 25A | EA | 0.00 | ||||||||
| 44 | PROVIDE AND INSTALL WEATHERPROOF DISCONNECT SWITCH, 1P, 10A | EA | 0.00 | ||||||||
| 45 | PROVIDE AND INSTALL DISCONNECT SWITCH, 1P, 10A | EA | 0.00 | ||||||||
| 46 | PROVIDE AND INSTALL DISCONNECT SWITCH, 1P, 4A | EA | 0.00 | ||||||||
| 47 | PROVIDE AND INSTALL JUNCTION BOX | EA | 0.00 | ||||||||
| 48 | PROVIDE AND INSTALL CONTROL SWITCH, UP/STOP/DOWN | EA | 0.00 | ||||||||
| 49 | PROVIDE AND INSTALL HVAC EMERGENCY SHUT-OFF BUTTON | EA | 0.00 | ||||||||
| 50 | PROVIDE AND INSTALL ADDRESSABLE FIRE ALARM CONTROL PANEL WITH MNS AND PANEL COMPONENTS | EA | 0.00 | ||||||||
| 51 | PROVIDE AND INSTALL RADIO TRANSCEIVER AND ANTENNA | EA | 0.00 | ||||||||
| 52 | PROVIDE AND INSTALL DOCUMENT BOX | EA | 0.00 | ||||||||
| 53 | PROVIDE AND INSTALL REMOTE LCD DISPLAY UNIT | EA | 0.00 | ||||||||
| AF Form 3052, AUG 85 | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| ENGINEER'S FINAL | |||||||||||
| 16.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 16 | OF | 20 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS EOD FACILITY | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| 0.00 | LJYC 10-6001 | 39th SUPPORT GROUP, INCIRLIK, ADANA, TURKEY | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| 54 | PROVIDE AND INSTALL LOCAL OPERATION CONTROL (LOC) | EA | 0.00 | ||||||||
| 55 | PROVIDE AND INSTALL COMBINED DEVICE, STROBE LIGHT (AMBER AND WHITE) WITH SPEAKER FOR FIRE ALARM AND MNS | EA | 0.00 | ||||||||
| 56 | PROVIDE AND INSTALL REMOTE LED / TEST SWITCH FOR DUCT SMOKE DETECTOR | EA | 0.00 | ||||||||
| 57 | PROVIDE AND INSTALL PHOTO ELECTRIC DUCT SMOKE DETECTOR | EA | 0.00 | ||||||||
| 58 | PROVIDE AND INSTALL SMOKE DETECTOR | EA | 0.00 | ||||||||
| 59 | PROVIDE AND INSTALL SPEAKER, WALL TYPE, 2W | EA | 0.00 | ||||||||
| 60 | PROVIDE AND INSTALL SPEAKER, WALL TYPE, WEATHERPROOF, 2W | EA | 0.00 | ||||||||
| 61 | PROVIDE AND INSTALL ADDRESSABLE MANUAL PULL STATION | EA | 0.00 | ||||||||
| 62 | PROVIDE AND INSTALL KNOX BOX | EA | 0.00 | ||||||||
| 63 | PROVIDE AND INSTALL MONITOR MODULE | EA | 0.00 | ||||||||
| 64 | PROVIDE AND INSTALL CONTROL MODULE | EA | 0.00 | ||||||||
| 65 | PROVIDE AND INSTALL MICROPHONE | EA | 0.00 | ||||||||
| 66 | COMMISSIONING AND SUPERVISION | LS | 0.00 | ||||||||
| 67 | PROVIDE AND INSTALL 14 AWG FIRE ALARM UL LIST FPL CABLE | LM | 0.00 | ||||||||
| 68 | PROVIDE AND INSTALL 16 AWG FIRE ALARM UL LIST FPL CABLE | LM | 0.00 | ||||||||
| 69 | PROVIDE AND INSTALL 19" RACK CABINET WITH COMPLETE | EA | 0.00 | ||||||||
| 70 | PROVIDE AND INSTALL SINGLE TELEPHONE OUTLET, RJ 45 | EA | 0.00 | ||||||||
| 71 | PROVIDE AND INSTALL DUPLEX OUTLET, (TELEPHONE AND DATA OUTLET), RJ45 | EA | 0.00 | ||||||||
| AF Form 3052, AUG 85 | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| ENGINEER'S FINAL | |||||||||||
| 17.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 17 | OF | 20 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS EOD FACILITY | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| 0.00 | LJYC 10-6001 | 39th SUPPORT GROUP, INCIRLIK, ADANA, TURKEY | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| 72 | PROVIDE AND INSTALL TV OUTLET | EA | 0.00 | ||||||||
| 73 | PROVIDE AND INSTALL SIPLETTER | EA | 0.00 | ||||||||
| 74 | PROVIDE AND INSTALL TV ENTRANCE PANEL | EA | 0.00 | ||||||||
| 75 | PROVIDE AND INSTALL 25 PAIR 22 AWG RODENT RESISTANT BFCAY TYPE COMMUNICATION CABLE | LM | 0.00 | ||||||||
| 76 | PROVIDE AND INSTALL SM 12 STRAND FIBER OPTIC CABLE | LM | 0.00 | ||||||||
| 77 | PROVIDE AND INSTALL 66-TYPE GAS TUBE PROTECTION TERMINAL BLOCK, WITH METAL HOUSING | EA | 0.00 | ||||||||
| 78 | PROVIDE AND INSTALL ALUMINIUM PULL BOX, 40x50x20 CM (HxWxD) | EA | 0.00 | ||||||||
| 79 | PROVIDE AND INSTALL PLYWOOD BACKBOARD, 120x150x2 CM (HxWxD) | EA | 0.00 | ||||||||
| 80 | PROVIDE AND INSTALL 24 PAIR TERMINAL | EA | 0.00 | ||||||||
| 81 | PROVIDE AND INSTALL CAT 6 UTP, 4x2x24 AWG, TELEPHONE CABLE | LM | 0.00 | ||||||||
| 82 | PROVIDE AND INSTALL PE 500 COAXIAL CABLE | LM | 0.00 | ||||||||
| 83 | PROVIDE AND INSTALL RG 11/U-4 TRISHIELD COAXIAL CABLE | LM | 0.00 | ||||||||
| 84 | PROVIDE AND INSTALL 1/2" LIQUIDTIGHT FLEXIBLE CONDUIT | LM | 0.00 | ||||||||
| 85 | PROVIDE AND INSTALL 2.5 MM2 NYA CABLE | LM | 0.00 | ||||||||
| 86 | PROVIDE AND INSTALL 4 MM2 NYA CABLE | LM | 0.00 | ||||||||
| 87 | PROVIDE AND INSTALL 6 MM2 NYA CABLE | LM | 0.00 | ||||||||
| 88 | PROVIDE AND INSTALL 10 MM2 NYA CABLE | LM | 0.00 | ||||||||
| 89 | PROVIDE AND INSTALL 16 MM2 NYA CABLE | LM | 0.00 | ||||||||
| AF Form 3052, AUG 85 | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| ENGINEER'S FINAL | |||||||||||
| 18.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 18 | OF | 20 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS EOD FACILITY | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| 0.00 | LJYC 10-6001 | 39th SUPPORT GROUP, INCIRLIK, ADANA, TURKEY | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| 90 | PROVIDE AND INSTALL 25 MM2 NYA CABLE | LM | 0.00 | ||||||||
| 91 | PROVIDE AND INSTALL 5x4 MM2 NYY CABLE | LM | 0.00 | ||||||||
| 92 | PROVIDE AND INSTALL 2x1.5 MM2 N2XH CABLE | LM | 0.00 | ||||||||
| 93 | PROVIDE AND INSTALL 3x2.5 MM2 N2XH CABLE | LM | 0.00 | ||||||||
| 94 | PROVIDE AND INSTALL 3x4 MM2 N2XH CABLE | LM | 0.00 | ||||||||
| 95 | PROVIDE AND INSTALL 3x10 MM2 N2XH CABLE | LM | 0.00 | ||||||||
| 96 | PROVIDE AND INSTALL 5x4 MM2 N2XH CABLE | LM | 0.00 | ||||||||
| 97 | PROVIDE AND INSTALL 5x6 MM2 N2XH CABLE | LM | 0.00 | ||||||||
| 98 | PROVIDE AND INSTALL 1/2" ELECTRICAL METALLING TUBING (EMT) | LM | 0.00 | ||||||||
| 99 | PROVIDE AND INSTALL 3/4" ELECTRICAL METALLING TUBING (EMT) | LM | 0.00 | ||||||||
| 100 | PROVIDE AND INSTALL 1" ELECTRICAL METALLING TUBING (EMT) | LM | 0.00 | ||||||||
| 101 | PROVIDE AND INSTALL 1-1/4" ELECTRICAL METALLING TUBING (EMT) | LM | 0.00 | ||||||||
| 102 | PROVIDE AND INSTALL 1-1/2" ELECTRICAL METALLING TUBING (EMT) | LM | 0.00 | ||||||||
| 103 | PROVIDE AND INSTALL 1" GALVANIZED RIGID STEEL PIPE WITH FITTINGS | LM | 0.00 | ||||||||
| 104 | PROVIDE AND INSTALL 2" GALVANIZED RIGID STEEL PIPE WITH FITTINGS | LM | 0.00 | ||||||||
| 105 | PROVIDE AND INSTALL 4" GALVANIZED RIGID STEEL PIPE WITH FITTINGS | LM | 0.00 | ||||||||
| 106 | GROUNDING INSPECTION PIT | EA | 0.00 | ||||||||
| 107 | PROVIDE AND INSTALL GROUND ROD, SOLID COPPER, 3.30 M, 20 MM DIA | EA | 0.00 | ||||||||
| AF Form 3052, AUG 85 | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| ENGINEER'S FINAL | |||||||||||
| 19.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 19 | OF | 20 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS EOD FACILITY | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| 0.00 | LJYC 10-6001 | 39th SUPPORT GROUP, INCIRLIK, ADANA, TURKEY | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| 108 | CONSTRUCT MANHOLE (160 x 160 CM) | EA | 0.00 | ||||||||
| 109 | PROVIDE AND INSTALL NON-METALIC CABLE RACK FOR MANHOLE (EIGHT SET FOR EACH MANHOLE) | EA | 0.00 | ||||||||
| 110 | PROVIDE AND INSTALL METALIC CABLE RACK FOR MANHOLE (EIGHT SET FOR EACH MANHOLE) | EA | 0.00 | ||||||||
| 111 | CONSTRUCT CONCRETE CABLE DUCT C/W 1 PIPES HEAVY WALLED 4" PVC AND WARNING TYPE | LM | 0.00 | ||||||||
| 112 | CONSTRUCT CONCRETE CABLE DUCT C/W 2 PIPES HEAVY WALLED 4" PVC AND WARNING TYPE | LM | 0.00 | ||||||||
| 113 | CONSTRUCT CONCRETE CABLE DUCT C/W 4 PIPES HEAVY WALLED 4" PVC AND WARNING TYPE | LM | 0.00 | ||||||||
| 114 | PROVIDE AND INSTALL 1/4" PULL ROPE | CM | 0.00 | ||||||||
| 115 | EXCAVATION BACKFILLING FOR UNDERGROUND ELECTRICAL LINES | CM | 0.00 | ||||||||
| 116 | PROVIDE AND INSTALL CABLE TRAY, 20x5 CM | LM | 0.00 | ||||||||
| 117 | PROVIDE AND INSTALL CABLE TRAY, 30x5 CM | LM | 0.00 | ||||||||
| 118 | PROVIDE AND INSTALL CABLE TRAY, 40x5 CM | LM | 0.00 | ||||||||
| 119 | PROVIDE AND INSTALL AIR TERMINAL | EA | 0.00 | ||||||||
| 120 | PROVIDE AND INSTALLSTRANDED COPPER WIRE, 50 MM2 | LM | 0.00 | ||||||||
| 121 | PROVIDE AND INSTALL BONDING WIRE, 35 MM2 | LM | 0.00 | ||||||||
| 122 | PROVIDE AND INSTALL EXOTHERMIC WELD FOR DIFFERENT CONDUCTORS | EA | 0.00 | ||||||||
| 123 | PROVIDE AND INSTALL COUNTERPOISE CONDUCTORS STRANDED COPPER, 50 MM2, INCLUDING TRENCHING | LM | 0.00 | ||||||||
| 124 | PROVIDE AND INSTALL LIGHTNING PROTECTION ACCESSORIES | LS | 0.00 | ||||||||
| 125 | PROVIDE AND INSTALL 16 MM2 Cu FOR ANTENNA GROUNDING CABLE | LM | |||||||||
| AF Form 3052, AUG 85 | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| ENGINEER'S FINAL | |||||||||||
| 20.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 20 | OF | 20 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS EOD FACILITY | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| 0.00 | LJYC 10-6001 | 39th SUPPORT GROUP, INCIRLIK, ADANA, TURKEY | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| 126 | PROVIDE AND INSTALL 1x16 MM2 NYY FOR COMMUNICATION GROUNDING CABLE | LM | 0.00 | ||||||||
| 127 | PROVIDE AND INSTALL 70 MM2 CU, MAIN GROUNDING CABLE | LM | 0.00 | ||||||||
| 128 | PROVIDE AND INSTALL CONDUIT SPACER | EA | 0.00 | ||||||||
| 129 | ROAD CROSSING WITH HORIZONTAL BORING | EA | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| T O T A L | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| AF Form 3052, AUG 85 | |||||||||||
| FOR OFFICIAL USE ONLY |
AF3052back
| INSTRUCTIONS FOR COMPLETING AF FORM 3052 | ||||||||
| Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to | ||||||||
| permit itemizing of all direct costs. | ||||||||
| Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples : square yards - SY, cubic yards - CY, square | ||||||||
| feet - SF, linear feet - LF, board feet - BF, each - EA, pound -LB). | ||||||||
| Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be | ||||||||
| funished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract | ||||||||
| will be issued. Otherwise, the contractor is responsible for determining quantity estimates. | ||||||||
| Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1. | ||||||||
| Col 6, 7 and 8 Labor Costs. Enter in Col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. | ||||||||
| Enter in Col 7 the average rate per manhour (manday) and in Col 8 the total labor cost. | ||||||||
| Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract | ||||||||
| and of significant dollar value. | ||||||||
| Col 10 Line Total. Self-explanatory. | ||||||||
| NOTE: In addition to the other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last | ||||||||
| page as follows. | ||||||||
| TOTAL MATERIAL COSTS | $ | 0.00 | ||||||
| ------------------------------- | ||||||||
| TOTAL LABOR COSTS | $ | 0.00 | ||||||
| ------------------------------- | ||||||||
| TOTAL OTHER DIRECT COSTS | $ | 0.00 | ||||||
| ------------------------------- | ||||||||
| TOTAL COSTS | $ | 0.00 | ||||||
| ------------------------------- | ||||||||
| OVERHEAD | % | $ | 0.00 | |||||
| ------------------------------- | ||||||||
| SUBTOTAL | $ | 0.00 | ||||||
| ------------------------------- | ||||||||
| PROFIT | % | $ | 0.00 | |||||
| ------------------------------- | ||||||||
| SUBTOTAL PRICE | $ | 0.00 | TOTAL PRICE | |||||
| ------------------------------- | ||||||||
| V.A.T. TAX : | 0.00 | % | $ | 0.00 | $ | 0.00 | ||
| ------------------------------- | ---------------------------- | |||||||
| DATE : | FIRM NAME | |||||||
| ----------------------------------------------------------------- | ||||||||
| TITLE: | BY | |||||||
| ---------------------------------------------------------- | ----------------------------------------------------------------- | |||||||
| INSTRUCTIONS TO OFFERORS | ||||||||
| 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and | ||||||||
| estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from | ||||||||
| this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data | ||||||||
| (see ASPR 3-807.3(e) and 3-807.4). | ||||||||
| 2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this | ||||||||
| form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and | ||||||||
| analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of | ||||||||
| a. The existing, verifiable data. | ||||||||
| b. The judgmental factors applied in projecting from known data to the estimate, and | ||||||||
| c. The contingencies used by the offeror in his proposed price. | ||||||||
| In short, the offeror's estimating process itself needs to be disclosed. | ||||||||
| 3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), | ||||||||
| and made available to the contracting officer or his authorized representative upon request. | ||||||||
| 4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the | ||||||||
| purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate | ||||||||
| evaluation of such cost or pricing data, along with the computations and projections used herein. This right may be exercised in connection | ||||||||
| with any negotiations prior to contract award. | ||||||||
| (Reverse of AF Form 3052., AUG 85) |
File details come from the government source that posted it. Updated .