ASHJ_15_1062_SOW_ADD_1_r.pdf
PDF 10 KB Posted
- Solicitation number
- FA5682-15-T-0011
About this file
ADDENDUM 1 TO THE TECHNICAL SPECIFICATIONS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA5682-15-T-0011-0001.pdf | ||
| ASHJ_15_1062_CNS_Cost_Est_blank.xls | XLS spreadsheet | |
| ASHJ_15_1062_SOW_REV1.pdf | ||
| FA5682-15-T-0011.pdf | ||
| ASHJ_15-1062_SUBMITTALS_R.pdf | ||
| ADDITIONAL_REQUIREMENTS_(under_150K).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project # ASHJ 15-1062 Technical Specifications R1
DATE: SEPT 2015 ADDENDUM#1
31CES/CENM
PROJECT ASHJ 15-1062
SUSTAIN HVAC SYSTEM BLDG 600
AREA E, AVIANO AIR BASE, ITALY
ADDENDUM#1______________________________________________________________________
Part 14. MECHANICAL WORKS.
Sub- item 14.b includes also:
- The secondary piping connection between existing fancoil steel pipe and new plastic pipes must have a stainless steel elastic pipe 40 cm long ( 2ea per fancoil, as used for solar panels) to absorb main plastic line movements .