About this file

Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to Air Conditioning Unit, newest first.
File Type Posted
16-Q-0032_HVAC_Solicitation.pdf PDF
Diagram_5.pdf PDF
16-Q-0032_HVAC_Solicitation.pdf PDF
SITE_VISIT_QUESTIONS.pdf PDF
16-Q-0032_HVAC_Solicitation.pdf PDF
Diagram_2.pdf PDF
16-Q-0032_HVAC_Combo.pdf PDF
Diagram_4.pdf PDF
Diagram_1.pdf PDF
Diagram_3.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

CDC West Variable Refrigerant Volume (VRV) System Replacement

Prepared by

48 CES/CEOIH

RAF Lakenheath

APO AE 09464

8 Jul 2016

STATEMENT OF WORK

1. SCOPE

This statement of work (SOW) is for a contractor to replace the VRV system at Building 439 CDC West.

2. APPLICABLE DOCUMENTS N/A

3. GENERAL DESCRIPTION

The contractor shall provide all design, labor, and materials to install infrastructure/equipment to remove old carrier VRV system, which includes one condenser and four indoor units, and replace with a new unit. The old system is currently running R407C refrigerant.

The following is a summary of work:

3.1 Install equipment:

a) Indoor and outdoor units to include remote controls and outlet grill in each room.

b) Reclaim and remove the existing system

c) Supply and install 4 ducted fan coils

d) To supply and install transformation ductwork

e) To supply and install 1 branch connection box

f) Supply and install 4 of wall mounted controllers in rooms indicated in section

4.1.3

g) Supply and install 1 driven remote condensing unit

h) Reuse all existing ductwork and diffuser grilles

i) Reuse all interconnecting pipe work in refrigeration grade copper tubing, and

j) Insulation of pipe work in Class ‘O’ insulation and all pipe bracket clips and sundries.

k) Supply and install all interconnecting cables in flexible armored cable and pvc cable, and all brackets and sundries

l) Supply and install condensate removal pumps

m) Fully commission complete system

4 INSTALLATION

The contractor shall provide all equipment and supplies necessary to support this requirement.

The Contractor shall provide a list of all components installed per this project, as well as a list of the components removed if any.

4.1 Testing and Acceptance

4.1.1 Testing

The contractor will ensure installation is operational and meets all the cooling requirements.

4.1.2 Acceptance

The expansion shall operate with minimal failure after acceptance testing and activation of service. The contractor shall provide all support necessary during this period to resolve any issues that may arise.

4.1.3 Location

The exterior unit is located in front east side of the building, the indoor units are located in rooms: Toddler 8, pre-toddler 7, toddler 6, 5

4.1.4 Unit specifications

a) 380-480 volts

b) 3 Phase

c) VRF unit(variable refrigerant flow)

d) Amps: 20 or less

e) Refrigerant: R410a or R407C

f) Cooling capacity: 28 kw of nominal cooling

g) Each fan coil unit to be 7kw nominal each

h) Dimensions(H x W x D): no larger than 1675 x 1080 x 480

i) Warranty: 3 years or more

5 PLACE OF PERFORMANCE

The location of installation is on RAF Lakenheath UK. The contractor is expected to work normal business hours, 0730 to 1630, with sufficient time to allow for entrance and exit of base security points before during and after the normal work hours.

6 HOURS OF WORK

The contractor shall perform all work during normal duty hours, 0730 to 1630, Monday through Friday; excluding UK holidays.

7 POINTS OF CONTACT (POC):

Point of Contacts will be provided at time of award of the contract.

8 CUSTOMER SUPPORT:

Other than next-business-day fixes, customer support shall be available equivalent to that of standard commercial practices.

9 ADDITIONAL REQUIREMENT:

All work area shall be kept as clean as possible during working hours. Debris will not be allowed to accumulate on work site. All debris will be deposited in an authorized container supplied by the contractor.