Contractor_questions_-_Final.pdf

PDF 105 KB Posted

Attached to
RENOVATE MSA IGLOOS Federal contract opportunity
Solicitation number
FA5575-19-R-A003
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

View the file

Other files for this federal contract opportunity

Other files attached to RENOVATE MSA IGLOOS, newest first.
File Type Posted
Solicitation_Amendment_FA557519RA0030002_SF_30_Released.pdf PDF
Solicitation_Amendment_FA557519RA0030001_SF_30.pdf PDF
HVAC_Chiller_Justification_and_Approval_-_Signed.pdf PDF
18-1002,_Part_6.2,_Record_Drawings_Part5.pdf PDF
18-1002,_Part_6.2,_Record_Drawings_Part1.pdf PDF
18-1002,_Part_6.2,_Record_Drawings_Part6.pdf PDF
18-1002,_Part_6.2,_Record_Drawings_Part7.pdf PDF
18-1002_Attch_A_-_Integrated_Natural_Resources_Management_Plan_for_Morón_Air_Base_Part1.pdf PDF
18-1002_Attch_A_-_Integrated_Natural_Resources_Management_Plan_for_Morón_Air_Base_Part5.pdf PDF
18-1002_Attch_A_-_Integrated_Natural_Resources_Management_Plan_for_Morón_Air_Base_Part4.pdf PDF
18-1002,_Part_6.2,_Record_Drawings_Part2.pdf PDF
18-1002,_Part_6.2,_Record_Drawings_Part4.pdf PDF
18-1002_Attch_A_-_Integrated_Natural_Resources_Management_Plan_for_Morón_Air_Base_Part3.pdf PDF
18-1002_Part_8_-_Schedule_of_Material_Submittals.xlsx XLSX spreadsheet
18-1002_Attch_A_-_Integrated_Natural_Resources_Management_Plan_for_Morón_Air_Base_Part2.pdf PDF
18-1002,_Part_6.2,_Record_Drawings_Part3.pdf PDF
18-1002_Attch_A_-_Integrated_Natural_Resources_Management_Plan_for_Morón_Air_Base_Part6.pdf PDF
18-1002_Attch_B_-_Final_Governing_Standards_for_Spain,_May_2014.pdf PDF
18-1002_SOW,_revised.pdf PDF
Solicitation_-_FA557519RA003.pdf PDF
18-1002,_Part_6.1,_Concept_Drawings.pdf PDF
18-1002_Statement_of_Work,_English_SC.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA5575-19-R-A003

RPR MSA Igloos

Questions and Answers

1) According to the Solicitation document, Sub Factor – Past Experience, the offeror has to include with the proposal the following documents:

-3 to 5 example projects demonstrating design-build Project experience.

-3 to 5 example projects demonstrating the experience and capability of the A/E firm.

-3 to 5 example projects demonstrating the experience and capability of the Construction firm .

If a Project meets those three (3) requirements above, we would like to clarify if this project can be included to cover each of sections above (design-build, A/E firm experience, and Construction experience). I mean, the same Project would be included three (3) times once for each experience requirements.

Government response: The Contractor shall submit in total three to six example projects but, as a minimum, one of each type, as to say, one design-build, one A&E design and one construction project. These three projects shall belong to different contracts. Sections L and M of the solicitation have been amended to reflect this requirement.