Attachment_2_-_PWS_Joint_Apron_Markings_-_English.pdf
PDF 2 MB Posted
- Attached to
- Joint Apron Markings Federal contract opportunity
- Solicitation number
- FA557519QMD04
About this file
Attachment 2 - PWS Joint Apron Markings - English
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_5_â_Questions_and_Answers.pdf | ||
| 19QMD04_Joint_Apron_Markings_-_Amendment_1.pdf | ||
| Attachment_3_-_PWS_Joint_Apron_Markings_-_Spanish.pdf | ||
| FA557519QMD04_Joint_Apron_Markings.pdf | ||
| Attachment_1_-_Price_Schedule.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
(PWS)
FOR
JOINT APRON MARKINGS
WORK ORDER #18208
CIVIL ENGINEERING
496 ABS/CENDC
(29 MAY 2019)
WO #18208
PERFORMANCE WORK STATEMENT (PWS)
TABLE OF CONTENTS
SECTION PAGE
1. DESCRIPTION OF SERVICES 5
2. SERVICES SUMMARY 13
3. GOVERNMENT FURNISHED PROPERTY AND SERVICES 14
4. GENERAL INFORMATION 14
5. APPENDICES
A. Section 32 07 05 Rubber and Paint Removal from Airfield Pavements 18
B. Section 32 07 06 Airfield Pavement Markings 25 C. Colorless Lacquer Primer 43 D. Yellow Paint 45 E. White Paint 47 F. Black Paint 49 G. Red Paint 51 H. Retro-Reflective Beads 53 I. Environmental Final Governing Standards for Spain, May 2014 57 J. Drawings 309
1. DESCRIPTION OF SERVICES
The contractor shall provide all the management, tools, supplies, equipment and labor needed to remove and paint apron markings. The contract shall be made inside the boundary of Moron Air Base.
1.1. Description of Work
The work shall consist in:
a. Remove the indicated apron markings without damaging the markings to remain, pavement, slab joints, sealants, aircraft static grounding tiedowns, fuel hydrants and fuel grounds. The authorized removal methods, ordered from the first to the last method to be used, are waterblasting, sandblasting, grinding or scarifying and chemical. The shotblasting is prohibited. If the marking removal is not possible without causing damage with a method, remove them with the following method. If the marking removal is not possible by any of the 4 methods without causing damage, apply black paint without retro-reflective beads on the markings. During the removal of the markings by any of the 4 methods, the apron and taxiways shall be free of foreign object debris (FOD) (see Appendices, I and J)
b. Apply colorless lacquer to prime the concrete pavement surface to be painted (see Appendixes B, C and J)
c. Paint apron and taxiways markings (see Appendixes B, D, E, F, G, I and J)
d. Apply retro-reflective beads on the required painted markings (see Appendixes B, H, I and J)
1.1.1. Markings to remove and/or to paint
The markings to remove or to paint on taxiways and apron are the following:
a. "Bravo" taxiway
1. Remove the aircraft stand taxilane centerline marking located at the south of "Echo" row”
b. "Parallel" Taxiway
1. Remove the directional marking to aircraft stands of "Echo" row (2 markings)
2. Remove the aircraft stand taxilane centerline marking located at the north of "Charlie" row
3. Remove the aircraft stand taxilane centerline marking located at the south of "Delta" row
4. Remove the aircraft stand taxilane centerline marking located a tthe south of "Echo" row
5. Paint the directional markings to "Alpha" row aircraft stands (4
6. Paint the directional markings to "Bravo" row aircraft stands (4
7. Paint the directional markings to "Charlie" row aircraft stands (2
8. Paint the directional markings to "Delta" row aircraft stands (2
9. Paint the directional markings to "Echo" row aircraft stands (2
10. Paint the aircraft stand taxilane centerline markings of "Bravo" row located at the north of said row
11. Paint the aircraft stand taxilane centerline markings of "Charlie" row located at the south of said row
12. Paint the aircraft stand taxilane centerline markings of "Delta" row
13. Paint the aircraft stand taxilane centerline markings of "Echo" row
14. Paint the aircraft stand taxilane centerline markings of "Foxtrot" row
15. Paint the aircraft stand taxilane centerline markings of "Juliett" row
16. Paint the aircraft stand taxilane centerline markings of "Kilo" row
c. Aircraft stand taxilane located at the south of "Alpha" row of aircraft stands
1. Remove the restricted area marking
2. Remove the intermediate holding position marking
3. Paint the intermediate holding position marking
d. "Alpha" row of aircraft stands
1. Remove the restricted area marking
2. Remove the wing tip clearance line marking (west section)
3. Paint the wing tip clearance line marking
e. Aircraft stand taxilane located at the north of "Alpha" row of aircraft stands
1. Remove the restricted area marking
2. Remove the intermediate holding position marking
3. Paint the intermediate holding position marking
f. Aircraft stand taxilane located at the south of "Bravo" row of aircraft stands
1. Remove the restricted area marking
2. Remove the intermediate holding position marking
3. Paint the intermediate holding position marking
g. "Bravo" row of aircraft stands
1. Remove the restricted area marking
2. Remove the wing tip clearance line marking (west section)
3. Paint the wing tip clearance line marking
h. Aircraft stand taxilane located between "Bravo" and the existing "Charlie" rows of aircraft stands
1. Remove the restricted area marking
2. Remove the intermediate holding position marking
3. Remove the lead-out line markings
4. Remove the apron taxiway centerline markings located at the east extremity (see drawing)
i. New aircraft stand taxilane located at the north of "Bravo" row of aircraft stands
1. Paint the aircraft stand taxilane centerline marking
2. Paint the apron taxiway centerline marking located at the east (see drawing)
3. Paint the intermediate holding position marking
j. Existing "Charlie" row of aircraft stands
2. Remove the wing tip clearance line marking (west section)
3. Remove the nose wheel bar markings (8 markings)
4. Remove the coordinate markings of the aircraft stands (8 markings)
5. Remove the lead-in line markings
6. Remove the apron taxiway centerline markings located at the east
k. Aircraft stand taxilane located at the north of the existing "Charlie" row of aircraft stands
3. Remove the aircraft stand taxilane centerline marking
l. New "Charlie" row of aircraft stands
1. Paint the wing tip clearance line marking
2. Paint the nose wheel bar markings (10 markings)
3. Paint the aircraft static grounding tiedown markings
4. Paint the apron taxiway centerline marking located at the east (see
5. Paint the aircraft stand designation markings on the lead-out line markings (10 markings)
m. Aircraft stand taxilane located at the south of the new "Charlie" row of aircraft stands
1. Paint the intermediate holding position marking
2. Paint the aircraft stand taxilane centerline marking
3. Paint the apron taxiway centerline marking located at the east (see
4. Paint the lead-in line markings
5. Paint the aircraft stand identification markings on the lead-in line markings (10 markings)
n. Aircraft stand taxilane located between the new "Charlie" and "Delta" rows of
2. Paint the aircraft stand taxilane centerline marking
3. Paint the apron taxiway centerline marking located at the east (see
4. Paint the lead-out line markings
5. Paint the restricted area marking
6. Paint the entry control point markings (5 markings)
o. Aircraft stand taxilane located at the south of the existing "Delta" row of
4. Remove the lead-out line markings
5. Remove the apron taxiway centerline markings located at the east
p. Aircraft stand taxilane located between the existing "Delta" and "Echo" rows of
1. Remove the restricted area marking (3 sections: south, east and west)
4. Remove the lead-in line markings
5. Remove the lead-out line markings
6. Remove the restricted area warning marking (1 marking)
7. Remove the apron taxiway centerline markings located at the east
q. Existing "Delta" row of aircraft stands
2. Remove the wing tip clearance line marking (west section)
3. Remove the nose wheel bar markings (6 markings)
r. New "Delta" row of aircraft stands
2. Paint the restricted area marking
3. Paint the nose wheel bar markings (12 markings)
4. Paint the aircraft stand designation markings on the lead-out line markings (12 markings)
5. Paint the lead-out line markings
6. Paint the aircraft static grounding tiedown markings
s. Aircraft stand taxilane located between the new "Delta" and "Echo" rows of
2. Paint the restricted area markings
3. Paint the aircraft stand taxilane centerline marking
4. Paint the lead-in line markings
5. Paint the aircraft stand identification markings on the lead-in line markings (12 markings)
6. Paint the entry control point markings (10 markings)
t. Aircraft stand taxilane located between the existing "Echo" and "Foxtrot" rows of aircraft stands
1. Remove the restricted area marking (east and west sections)
3. Remove the lead-in line markings
4. Remove the aircraft stand identification markings located on the lead-in line markings (4 markings)
5. Remove the restricted area warning markings (3 markings)
6. Paint the aircraft stand taxilane centerline marking
7. Paint the intermediate holding position marking
8. Paint the restricted area markings
9. Paint the entry control point markings (6 markings)
u. Existing "Echo" row of aircraft stands
1. Remove the wing tip clearance line marking (south and west sections)
2. Remove the restricted area marking (2 sections: east and west)
3. Remove the nose wheel bar markings (15 markings)
4. Remove the aircraft type designation markings located near the nose wheel bar markings:
a) F 16 (11 markings)
b) C 130 (4 markings)
5. Remove the aircraft stand designation markings located on the lead-out line markings (4 markings)
6. Remove the restricted area warning marking (1 marking)
v. New "Echo" row of aircraft stands
2. Paint the restricted area marking
3. Paint the nose wheel bar markings (27 markings)
4. Paint the aircraft type designation markings located near the nose wheel bar markings:
a) C 17 (4 markings)
b) KC 135 (4 markings)
c) KC 10 (4 markings)
d) A 400M (4 markings)
e) C 130 (4 markings)
f) B 52 (4 markings)
g) A 310 (3 markings)
h) A 330 (3 markings)
5. Paint the aircraft stand designation markings on the lead-out line markings (7 markings)
6. Paint the lead-out line markings
7. Paint the lead-in line markings
8. Paint the aircraft stand identification markings on the lead-in line markings (7 markings)
9. Paint the aircraft static grounding tiedown markings
1.1.2. Retro- Reflective Markings
All markings shall be retro-reflective.
1.1.3. Construction Phases
The works shall be executed in one phase only.
1.2. Brand Names
The names indicated for materials are for the sole purpose of establishing a standard selection only.
Materials from other manufacturers are acceptable provided they meet all the specified requirements.
The names indicated for the quality of model, give the quality standard to be achieved. The materials from other manufacturers are acceptable if they are equal to the quality and function of the suggested model. All selected material is subject to the approval of the Contracting Officer.
1.3. Final Cleaning
The contractor shall perform a final cleaning of facilities and areas affected by the work to be executed under this contract.
1.4. Period of Performance
The period of performance for this contract is hundred and twenty (150) calendar days. The contractor shall provide its deadline with its proposal.
The aforementioned items and the list of main tasks in no way limit the responsibility of the contractor to perform all the work required by the contract to provide a complete and operational facility.
2. SERVICES SUMMARY
Performance Objective Description of Work Performance Threshold Activities Paragraph 1.1 100%
3. GOVERNMENT FURNISHED PROPERTY AND SERVICES
3.1. Use of Base Utilities
The Base utilities are available to the Contactor at no additional expense to the Contractor. The following utilities shall be available from the existing Base utility connections in reasonable quantities:
a. Electricity 120/208 volts, 60 Hz
b. Water
All equipment, materials and labor needed to fulfill the aforementioned items shall be provided by the contractor as part of this contract.
4. GENERAL INFORMATION
4.1. Base Access
The contractor shall request Base access through 496 ABS/CE.
4.2. Protection of the Facilities
The contractor shall be responsible for safeguarding all Government assets provided for contractor's use. At the close of each work period, Government facilities, their properties and materials shall be secured.
4.3. Working Hours
4.3.1. Normal Working Hours
The contractor shall perform the services required under this contract from Monday to Friday, from 08:00 to 17:00. The contractor may work, with the prior approval of the Contracting Officer, in extended hours to ensure the completion of work in a timely manner at no additional cost to the Government.
4.3.2. Recognized Holidays
The contractor is not required to perform the services on the following days: New Year’s Day, Martin Luther King Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Days, Thanksgiving Day and Christmas Day. If the holiday falls on Saturday, it is observed on the previous Friday. If the holiday falls on a Sunday, it is observed on the following Monday.
4.4. Conservation of Utilities
The contractor shall instruct his employees in good practices of conservation of the utilities. The contractor shall be responsible for its use with the condition of preventing the waste of the utilities:
a. Water faucets or valves shall be turned off after the required use has ended.
4.5. Records
The contractor shall be responsible for the creation, maintenance and use of only those records required by the Government that are specifically cited in this PWS.
4.6. Environmental Controls
4.6.1. Compliance with Laws and Regulations
The contractor shall be knowledgeable of and comply with all applicable interstate, federal, state, and local laws, regulations and requirements regarding environmental protection. In the event environmental laws/regulations change during the term of this contract, the contractor is required to comply as such laws/regulations come into effect. If there is an increase or decrease in cost because of the change, the contractor shall inform the Contracting Officer pursuant to notice requirements and negotiate a modification to the contract.
4.6.2. Notification of Environmental Spills
If the contractor spills or releases any substance referred to in Code of Federal Regulations (CFR) Title 40, Part 302, Section 302.4, 40 CFR 302.4, to the environment, the contractor or its agent shall immediately report the incident to the Fire Department of Moron Air Base dialing 117. The liability for the spill or release of such substances rests solely with the contractor and its agent.
4.6.3. Material Storage and Use
The contractor shall follow manufacturer’s guidelines and professional recommendations for control of humidity, temperature, cleanliness and materials handling. This includes hazardous materials.
4.7. Government Observations
Government personnel, other than Contracting Officers (COs) and quality assurance personnel (QAPs), may from time-to-time, with CO coordination, observe contractor operations. However, these personnel may not interfere with contractor performance or make any changes to the contract.
4.8. Safety Requirements
In the performance of the works required in this contract, the contractor:
a. Shall conform to the safety requirements indicated in the contract for all activities related to the accomplishment of the work.
b. Shall adopt immediately the additional measures that the Contracting Officer may reasonably require to increase the safety and to prevent accidents.
c. Shall develop and provide at the start of the orientation period or the start of the first operational performance period (if there is no orientation period) a safety plan for the protection of Government facilities and property and to provide a safe work environment for contractor personnel.
d. Shall provide protection to Government property to prevent damage during the period of time the property is under the control or in possession of the contractor.
e. Shall include a clause in all subcontracts to require subcontractors to comply with the safety provisions of this contract as applicable.
f. Shall record and report promptly (within one hour) to the Contracting Officer or designated Government representative (GR) all available facts relating to each instance of damage to Government property or injury to either contractor or Government personnel.
g. In the event of an accident/mishap, shall take reasonable and prudent action to establish control of the accident/mishap scene, shall prevent further damage to persons or property and shall preserve evidence until authorized by the accident/mishap investigative authority through the Contracting Officer.
h. If the Government elects to conduct an investigation of the accident/mishap, the contractor shall cooperate fully and assist Government personnel in the conduct of investigation until the investigation is completed.
i. Shall include a clause in each applicable subcontract requiring the subcontractor's cooperation and assistance in the accident/mishap reporting and investigation.
4.9. Special Qualifications
The contractor shall submit commercial certifications and references of previous executed works similar to those required by this contract to verify the experience in this field of work.
4.9.1. Classification Certificate of the Contractor
Contractor must hold an updated Certificate of Classification issued by the Spanish “Registro Oficial de Licitadores y Empresas Clasificadas del Estado” of the "Ministerio de Hacienda y Administraciones Públicas" covering the following groups, subgroups, and categories. The certificate holder must execute the activities related to the certificate.
Group Subgroup Category O 2 1 or higher
Certificate of Classification O21 corresponds to work activities related to the up keeping and maintenance of airfield, which annual average cost is less than 150,000 euros.
4.9.2. Quality Certificate of the Contractor and/or Subcontractor
The Contractor and/or subcontractor must hold an updated Certificate of Quality Management System UNE-EN ISO 9001 issued by an official certification body for the following activities:
1. Surface treatment and Airfield markings at Airports and public roads
4.9.3. Environment Certificate of the Contractor and/or Subcontractor
The Contractor and/or subcontractor must hold an updated Certificate of Environment Management System UNE-EN ISO 14001 issued by an official certification body for the following activities:
1. Surface treatment and Airfield markings at Airports and public roads
4.10. Contract Restriction
In accordance with the Agreement of Defense Cooperation between the Kingdom of Spain and the United States of America, any contract resulting from this notice/solicitation can only be entered into with companies authorized to carry out these activities in Spain under Spanish law. Companies must meet the requirements established by Spanish legislation for execution of Government works.
In addition, in accordance with the Agreement of Defense Cooperation, Annex 6, Article 1, Section 5, Spanish material, labor, and equipment shall be used whenever feasible and consistent with the requirements of the United States, which are in accordance with the specifications of the contract contained in the invitations to bid issued by the United States authorities.
APPENDIX A
SECTION 32 07 05
RUBBER AND PAINT REMOVAL FROM AIRFIELD PAVEMENTS
PART 1 - GENERAL
1.1. OBJECT
The works covered by this section of the specifications consist in performing all operations, furnishing all labor, shop work, materials, facilities, transportation, equipment, tools, appliances, materials, supplies and services to remove rubber deposits and paint from asphalt concrete or Portland cement.
1.2. REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
UNIFIED FACILITIES GUIDE SPECIFICATIONS
32 01 11.51 Rubber and Paint Removal From Airfield Pavements (May
2016), including Change 2 (August 2017)
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910 Occupational Safety and Health Standards
1.3. ADMINISTRATIVE REQUIREMENTS
Submit a schedule of work. Describe the work to be accomplished; noting the location of work, distances from the ends of runways, taxiways, buildings and other structures; and indicating dates and hours during which the work will be accomplished. Schedule the work to conform to aircraft operating schedules. The Government will try to schedule aircraft operations so as to permit the maximum amount of time for the Contractor's work. However, in the event of any emergency, intense operational demands, adverse wind conditions and other unforeseen difficulties, discontinue all work at locations in the aircraft operational area. Keep the approved schedule of work current and notify the Contracting Officer of any changes prior to beginning each day's work.
1.4. SUBMITTALS
Government approval is required for submittals. Submit the following:
a. Schedule of Work
b. Rubber and Paint Removal Process Plan
c. Waste Management Plan
d. Mechanical rubber and paint removal equipment
e. Chemical rubber and paint removal equipment
f. Rubber and Paint Removal Detergents or Chemicals
g. Test Section Results
1.5. MECHANICAL REMOVAL EQUIPMENT
Shotblasting is prohibited for use on airfield pavements.
Submit product data for mechanical rubber and paint removal equipment including area of coverage per pass, range of water pressures, and water tank capacity.
Mechanical removal equipment includes waterblasting, sandblasting, grinding or scarifying, or other approved non-chemical systems. Control the equipment used on asphalt or tar concrete to remove rubber and paint accumulations while minimizing disturbances to asphalt or tar mixtures.
Control the equipment used on portland cement concretes to remove rubber and paint accumulations and prevent removal of hardened paste from the concrete. Basic hand tools and the following major types of mechanical equipment are considered acceptable for this project:
a. Waterblasting Equipment
b. Grinding or Scarifying Equipment
c. Sandblasting Equipment
1.5.1. Waterblasting Equipment
Provide mobile waterblasting equipment capable of producing a pressurized stream of water that effectively removes rubber and paint from the pavement surface without significantly damaging the pavement. Provide equipment, tools, and machinery which are safe and in good working order at all times. Provide equipment interlocks to prohibit high pressure water discharge when the vehicle or cleaning head is stationary (not moving forward or side to side).
1.5.2. Sandblasting Equipment
Provide mobile sandblasting equipment capable of producing a pressurized stream of sand and air that effectively removes rubber and paint from the pavement surface without filling voids with debris in asphalt or tar pavements or removing joint sealants in portland cement concrete pavements. Include with the equipment an air compressor, hoses, and nozzles of adequate size and capacity for removing rubber and paint. Equip the compressor with traps and coalescing filters that maintain the compressed air free of oil and water.
1.5.3. Grinding or Scarifying Equipment
Provide equipment capable of removing surface contaminates, paint build-up, or extraneous markings from the pavement surface without leaving any residue. If a weed torch is used to remove paint, the surface must be cleaned by hydro blast afterwards to remove surface contaminates and ash.
1.6. CHEMICAL REMOVAL EQUIPMENT
Submit product data for chemical rubber and paint removal equipment. Use chemical equipment capable of applying and removing chemicals from the pavement surface while leaving only non-toxic biodegradable residue.
1.7. TEST SECTION
Prior to the start of work, remove rubber and paint on designated test areas not less than 15 m in length. Use procedures, water pressures, nozzle height, nozzle spacing, nozzle angle, and equipment movement rate to achieve the required degree of rubber and paint removal in accordance with paragraph RUBBER AND PAINT REMOVAL. Methods included in paragraph COMPLIANCE TESTING will be used to determine if the rubber and paint was successfully removed from the test section. The test will examine seven random locations within the test section. Submit the test section results before conducting any further removal work. Provide photos of seven random locations within the test area taken before and after the removal. Provide photos of four random locations at joint seals within the test area taken before and after removal.
1.8. DELIVERY, STORAGE, AND HANDLING
Deliver required materials in original manufacturer's containers labeled with appropriate EPA, OSHA, or other agency warnings, if applicable, and Safety Data Sheets. Protect materials from degrading until their use is required during execution of the work.
1.9. PROJECT/SITE CONDITIONS
1.9.1. Environmental Requirements
Ensure pavement surface is free of snow, ice or slush. Ensure surface temperature is at least 5 degrees C and rising at the beginning of operations except those involving sandblasting for which a lower surface temperature may be approved. Cease operation during thunder and lightning storms. Cease operation during rainfall except for waterblasting and removal of previously applied chemicals. Cease waterblasting where surface water accumulation alters the effectiveness of material removal.
1.9.2. Airfield Traffic Control
Coordinate performance of all work in the controlled zones of the airfield with the Contracting Officer and with the Flight Operations Officer, Airfield Manager or control tower. Neither equipment nor personnel can use any portion of the airfield without permission of these officers unless the runway is closed. Runway will be closed during the following times:
Day or Date Runway Closing Time Runway Opening Time Important Notes
1.9.3. Radio Communication
No personnel or equipment will be allowed in the controlled zones of the airfield until radio contact has been made with the control tower and permission is granted by the control tower. A radio for this purpose will be provided by the Government. The Contractor is responsible for the radio and must reimburse the Government for repair or replacement of the radio if it is lost, damaged, or destroyed. Maintain contact with the control tower at all times during work in vicinity of the airfield. Notify the control tower when work is completed and all personnel, equipment and materials have been removed from all aircraft operating surfaces.
1.9.4. Emergency Landing and Takeoff
Emergencies take precedence over all operations. Upon notification from the Control Tower of an emergency landing or imminent takeoff, stop all operations immediately and evacuate all personnel and equipment to an area not utilized for aircraft traffic which is at least 76 m measured perpendicular to and away from the near edge of the runway unless otherwise authorized by the Contracting Officer or the Contracting Officer's Representative. Equipment and chemicals or detergents as well as excess water must be able to clear the work area within 3 minutes.
1.9.5. Airfield Lighting
When night operations are necessary, provide all necessary lighting and equipment. Direct or shade lighting to prevent interference with aircraft, the air traffic control tower, and other base operations.
Provide lighting and related equipment capable of being removed from the runway within 15 minutes of notification of an emergency. Night work must be coordinated with the Flight Operations Officer or Airfield Manager and approved in advance by the Contracting Officer or authorized representative.
1.9.6. Water
Water to be used for high-pressure water equipment will be made available from Government hydrants or potable water treatment plant as shown on the drawings, within 2,450 m of all points of the work area, at no cost to the Contractor. Furnish equipment and labor for delivery of water from the hydrant or potable water treatment plant to the job site. Notify the Contracting Officer on location of fire hydrants or potable water treatment plant to be used and the respective times of use. The Contracting Officer will notify the Fire Department of fire hydrants to be used and designated times of use. Connections to a fire hydrant or potable water treatment plant will be subject to the Contracting Officer's inspection and approval. The Contractor must provide and use a backflow prevention device for filling water tanks. The Contractor is responsible for testing, treating, and filtering the water to ensure it will not interfere with the rubber removal or damage or clog the rubber removal equipment.
1.10. SAFETY
Comply with OSHA 29 CFR 1910.
PART 2 - PRODUCTS
2.1 RUBBER AND PAINT REMOVAL DETERGENTS OR CHEMICALS
The use of environmentally acceptable detergents or chemical agents must be considered on a case-by-case basis. Submit the Safety Data Sheet (SDS) for detergents or chemicals in the rubber and paint removal process. Use of any detergents or chemicals in the rubber and paint removal process must be approved in advance by the Contracting Officer. The Government specifically reserves the right to reject the use of any process which the Contracting Officer determines may pose unnecessary risks to human health, the environment, the pavement, aircraft or navigational aids due to corrosion or foreign object damage (FOD) potential as a result of its use, storage, or disposal.
PART 3 - EXECUTION
The Contracting Officer's Representative, the airfield manager and the pavements engineer will jointly develop guidelines and requirements for rubber and paint removal operations; and will jointly evaluate the feasibility of the Contractor's methods and project compliance with applicable regulations.
3.1 RUBBER AND PAINT REMOVAL
The following recommended rubber and paint removal percentages are based on visual estimation of pavement area required to be exposed by the removal process. The degree of removal possible without damaging the pavement surface will depend on pavement condition. Portland cement concrete pavements can withstand more water pressure impact than asphaltic concrete pavements before aggregates are exposed. It is not specified 100 percent removal, as this will result in excessive exposure of pavement aggregates.
Prior to any work being completed, submit a Rubber and Paint Removal Process Plan for approval by the Contracting Officer.
a. The pavement surface type is Portland cement concrete and asphalt mixture.
b. Remove 90 percent of all visible rubber on portland cement concrete pavements and 85 percent of all visible rubber on asphaltic concrete pavements. Remove 85 percent of paint on portland cement and asphaltic concrete pavement. Remove all paint that is loose, flaking, chalky, or not to be re-marked or does not comply with size or pattern standards.
c. Chemical methods used must be compatible with pavement materials, the environment and working personnel.
d. Exercise close control of water pressure and blasting time/duration to prevent damage to joints, existing markings that are not intended for removal, or the wearing surface. Neither hydroblasting or abrasive blasting may be used for rubber removal on porous friction courses.
e. Demonstrate the ability to remove rubber at a touchdown area of the runway selected by the Contracting Officer. Rubber removal must not damage the pavement surface. The surface texture of the cleaned demonstration area will be compared to that of non-rubber traffic areas to determine satisfactory completion of the removal operation.
f. After approval of the Contractor's operations by the Contracting Officer, the cleaned sample area will become the standard for rubber removal and final surface texture for the remainder of work.
g. Compliance testing for the amount of rubber and paint to be removed must conform to the requirements in paragraph COMPLIANCE TESTING.
3.2 RATE OF REMOVAL
Remove rubber at a minimum rate of 929 square meter per hour. Remove paint at a minimum rate of 93 square meter per hour. Do not permit high-pressure water application to remove the existing pavement surface, joint seals or crack seals.
3.3 WATER PRESSURE
The optimum water pressure to be used for rubber and paint removal will be determined by the test specified in paragraph entitled "Rubber and Paint Removal.".
Provide water pressure impact upon the indicated pavement areas sufficient to remove the designated rubber and paint to the required degree of removal without damaging the existing pavement, joint sealant, or other airfield appurtenances. The Contractor is responsible for repairing any damage caused by the removal work.
3.4 CLEANUP AND WASTE MANAGEMENT
Keep the worksite clean of by-products, debris and waste from rubber and paint removal operations. Perform cleanup operations continuously. Remove all residue from the pavement.
Obtain the approval of residue removal and management method from the Contracting Officer prior to beginning work. Submit a Waste Management Plan describing proposed actions regarding waste identification, segregation, packaging, temporary storage, valorization, disposal, collection, transport, recycling, reuse, treatment and final storage to the Contracting Officer's Representative for approval prior to the start of work. The plan will address management methods and requirements for hazardous and non-hazardous wastes.
3.5 COMPLIANCE TESTING
a. Compliance with the rubber and paint removal requirements must be determined by direct testing within the designated work area.
b. Use a 0.1 square meter section of transparent material inscribed with a grid of 100 equal squares as a tool for quantitative measure of the percent removal. Place the grid pattern on the pavement surface at random locations. Then count the squares which contain rubber and/or paint deposits. The number of squares containing rubber and/or paint deposits must not exceed the allowed percentage in each of the randomly selected locations.
c. Divide each work area designated for rubber and paint removal into at least four equal zones for the purpose of compliance testing. The layout of each zone must be approved by the Contracting Officer. Within each zone, a minimum of seven random locations must be evaluated. The amount of rubber and paint removed at each of the randomly selected test locations within each zone must meet the requirement described in paragraph RUBBER AND PAINT REMOVAL. Evaluate each zone independently. A zone not meeting the required percentage must be recleaned by the Contractor at the Contractor's expense.
d. Deposits of rubber or rubber buildup and paint are defined as any surface deposit that can be removed by scratching the deposit with a flat sharp object (such as a pocket knife) without damaging the pavement surface. Stains are defined as materials in the pavement surface microtexture that cannot be removed without damaging the pavement surface.
Stain is generally embedded in the surface of the pavement below the horizontal plane of the surface texture. The Contractor is not responsible for stain removal.
*** END OF SECTION ***
APPENDIX B
SECTION 32 07 06
AIRFIELD PAVEMENT MARKINGS
PART 1 - GENERAL
1.1. SCOPE
Work covered in this section of the specifications consists of performing all operations, labor, shop, materials, installation, transportation, equipment, supplies, services and the execution of all work for painting of the airfield on both bituminous and concrete surfaces, in accordance with plans and specifications, and subject to the terms and conditions of the contract.
1.2. REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
UNIFIED FACILITIES GUIDE SPECIFICATIONS
UFGS 32 17 23, Change 4 (August 2018) Pavement Markings
AMERICAN STANDARD TEST METHOD (ASTM)
ASTM D4061 (2013) Standard Test Method for Retroreflectance of
Horizontal Coatings
ASTM E1710 (2011) Standard Test Method for Measurement of
Retroreflective Pavement Marking Materials with CEN- Prescribed Geometry Using a Portable Retroreflectometer
ASTM E2177 (2011) Standard Test Method for Measuring the Coefficient of
Retroreflected Luminance (RL) of Pavement Markings in a Standard Condition of Wetness
ASTM E2302 (2003; R 2016) Standard Test Method for Measurement of the
Luminance Coefficient Under Diffuse Illumination of Pavement Marking Materials Using a Portable Reflectometer
INTERNATIONAL CONCRETE REPAIR INSTITUTE (ICRI)
ICRI 03732 (1997) Selecting and Specifying Concrete Surface Preparation for Sealers, Coatings, and Polymer Overlays
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
FS TT-B-1325 (Rev D; Notice 1; Notice 2 2017) Beads (Glass Spheres)
Retro-Reflective (Metric)
INSTITUTO NACIONAL DE TÉCNICA AEROESPACIAL (INTA)
INTA 16 02 07 Reflectancia direccional 45°/0°
INTA 16 02 18 Viscosidad de pinturas y esmaltes grasos (Método de Krebs-
Stormer)
INTA 16 02 31 A Materia fija y volátil
INTA 16 02 43 Peso específico de pinturas, barnices y esmaltes
INTA 16 02 46 B Ensayo de plegado
INTA 16 02 62 Poder cubriente de película seca y relación de contraste
INTA 16 02 86 Resistencia a la abrasión (Método Taber)
INTA 16 02 91 Tiempo de secado a la rodadura ("no pick-up")
INTA 16 06 01 Resistencia a la inmersión
INTA 16 06 11 Ensayo de envejecimiento acelerado por exposición a ciclos alternos de luz ultravioleta y condensación
INTA 16 44 15 B Pintura acrílica de emulsión para señalización de pistas de aterrizaje
UNA NORMA ESPAÑOLA (UNE)
UNE-EN 1436 (2018) Materiales para señalización vial horizontal.
Comportamiento de las marcas viales aplicadas sobre la calzada y métodos de ensayo
UNE-EN 1871 (2000) Materiales para señalización vial horizontal.
Propiedades físicas
UNE-EN ISO 2811-1 (2016) Pinturas y barnices. Determinación de la densidad.
Parte 1: Método del picnómetro. (ISO 2811-1:2016).
UNE-EN 12802 (2012) Materiales para señalización vial horizontal. Métodos de laboratorio para la identificación
UNE 48073-2 (1994) Pinturas y Barnices. Colorimetría. Parte 2: Medida de color
UNE 48103 (2014) Pinturas y barnices. Colores normalizados
UNE 135200-2 (2002) Equipamiento para la señalización vial. Señalización horizontal. Parte 2: Materiales. Ensayos de laboratorio
UNE 135202 (2010) Equipamiento para la señalización vial. Señalización horizontal. Pinturas y plásticos en frio. Determinación del tiempo de secado "no pick-up
INTERNATIONAL CIVIL AVIATION ORGANIZATION (ICAO)
Volume I of Annex 14 (2016) International Civil Aviation Organization
1.3. SUBMITTALS
Government approval is required for submittals. Submit the following:
a. Product Data
1. Surface Preparation Equipment List
2. Application Equipment List
3. Exterior Surface Preparation
4. Safety Data Sheets
5. Reflective Media for Airfields
6. Waterborne Paint
7. Primer for Portland Cement Concrete Pavements
b. Test Reports
1. Reflective Media for Airfields
2. Waterborne Paint
3. Primer for Portland Cement Concrete Pavements
4. Test Reports
c. Certificates
1. Qualifications
2. Reflective Media for Airfields
3. Waterborne Paint
4. Primer for Portland Cement Concrete Pavements
5. Volatile Organic Compound (VOC)
d. Manufacturer's Instructions
1. Waterborne Paint
2. Primer for Portland Cement Concrete Pavements
1.4. QUALITY ASSURANCE
1.4.1. Regulatory Requirements
Submit certificate stating that the proposed pavement marking paint meets the Volatile Organic Compound, (VOC) regulations of the European Commission (Commission Staff Working Document about the EU Green Public Procurement Criteria for Paints, Varnishes and Road Markings). Submit Safety Data Sheets for each product.
1.4.2. Qualifications
Submit documentation certifying that pertinent personnel are qualified for equipment operation and handling of applicable chemicals. The documentation should include experience on five projects of similar size and scope with references for all personnel.
1.4.3. Qualifications For Airfield Marking Personnel
Submit documentation of qualifications in resume format a minimum of 14 days before pavement marking work is to be performed showing personnel who will be performing the work have experience working on airfields, operating mobile self-powered marking, cleaning, and paint removal equipment and performing these tasks. Include with resume a list of references complete with points of contact and telephone numbers.
Provide certification for pavement marking machine operator and Foreman demonstrating experience successfully completing a minimum of two airfield pavement marking projects of similar size and scope. Provide documentation demonstrating personnel have a minimum of four years of experience operating similar equipment and performing the same or similar work in similar environments, similar in size and scope of the planned project. The Contracting Officer reserves the right to require additional proof of competency or to reject proposed personnel.
1.5. DELIVERY AND STORAGE
Deliver paint materials, and reflective media in original sealed containers that plainly show the designated name, specification number, batch number, color, date of manufacture, manufacturer's directions, and name of manufacturer.
Provide storage facilities at the job site, only in areas approved by the Contracting Officer, for maintaining materials at temperatures recommended by the manufacturer. Make available paint stored at the project site or segregated at the source for sampling not less than 30 days prior to date of required approval for use to allow sufficient time for testing. Notify the Contracting Officer when paint is available for sampling.
1.6. PROJECT/SITE CONDITIONS
1.6.1. Environmental Requirements
1.6.1.1. Weather Limitations for Application
Apply pavement markings to clean, dry surfaces, and unless otherwise approved, only when the air and pavement surface temperature is at least 5 degrees C above the dew point and the air and pavement temperatures are within the limits recommended by the pavement marking paint manufacturer. The air temperature has to be between 5 and 40 degree Celsius and pavement temperature has not to be below the dew point. The wind speed has to be less than 25 km/h. Allow pavement surfaces to dry after water has been used for cleaning or rainfall has occurred prior to striping or marking. Test the pavement surface for moisture before beginning work each day and after cleaning. Do not commence marking until the pavement is sufficiently dry and the pavement condition has been approved by the Contracting Officer. Employ the "plastic wrap method" to test the pavement for moisture as specified in paragraph TESTING FOR MOISTURE.
1.6.2. Traffic Controls
Not applicable.
1.6.3. Airfield Traffic Control
Coordinate performance of all work in the controlled zones of the airfield with the Contracting Officer and with the Flight Operations Officer, Airfield Manager or control tower. Neither equipment nor personnel can use any portion of the airfield without permission of these officers unless the runway is closed. Runways will be closed during the following times:
Day or Date Runway Closing Time Runway Opening Time Important Notes
1.6.4. Airfield Radio Communication
No personnel or equipment will be allowed in the controlled zones of the airfield until radio contact has been made with the control tower and permission is granted by the control tower. A radio for this purpose will be provided by the Government. The Contractor is responsible for the radio and must reimburse the Government for repair or replacement of the radio if it is lost, damaged, or destroyed. Maintain contact with the control tower at all times during work in vicinity of the airfield. Notify the control tower when work is completed and all personnel, equipment and materials have been removed from all aircraft operating surfaces.
1.6.5. Airfield Emergency Landing and Takeoff
Emergencies take precedence over all operations. Upon notification from the control tower of an emergency landing or imminent takeoff, stop all operations immediately and evacuate all personnel and equipment to an area not utilized for aircraft traffic which is at least 76 m measured perpendicular to and away from the near edge of the runway unless otherwise authorized by the Contracting Officer. Equipment and chemicals or detergents as well as excess water must be able to be removed from the work area within 3 minutes.
1.6.6. Lighting
When night operations are necessary, provide all necessary lighting and equipment. Direct or shade lighting to prevent interference with aircraft, the air traffic control tower, and other base operations.
Provide lighting and related equipment capable of being removed from the runway within 15 minutes of notification of an emergency. Night work must be coordinated with the Flight Operations Manager or Airfield Manager and approved in advance by the Contracting Officer. The Government reserves the right to accept or reject night work on the day following night activities by the Contractor.
PART 2 - PRODUCTS
2.1. EQUIPMENT
2.1.1. Surface Preparation and Paint Removal
2.1.1.1. Surface Preparation and Paint Removal Equipment for Airfield Pavements
Prepare all airfield surfaces and remove paint from airfield surfaces in accordance with 32 07 05 Rubber and Paint Removal from Airfield Pavements.
2.1.2. Application Equipment
Submit application equipment list appropriate for the material(s) to be used. Include manufacturer's descriptive data and certification for the planned use that indicates area of coverage per pass, pressure adjustment range, tank and flow capacities, and all safety precautions required for operating and maintaining the equipment. Provide and maintain machines, tools, and equipment used in the performance of the work in satisfactory operating condition, or remove them from the work site. Provide mobile and maneuverable application equipment to the extent that straight lines can be followed and normal curves can be made in a true arc.
2.1.2.1. Paint Application Equipment
2.1.2.1.1. Hand-Operated, Push-Type Machines
Not applicable.
2.1.2.1.2. Self-Propelled or Mobile-Drawn Spraying Machines
Provide self-propelled or mobile-drawn spraying machine with suitable arrangements of atomizing nozzles and controls to obtain the specified results. Provide machine having a speed during application capable of applying the stripe widths indicated at the paint coverage rate specified herein and of even uniform thickness with clear-cut edges.
2.1.2.1.2.1. Road Marking
Not applicable.
2.1.2.1.2.2. Airfield Marking
Provide self-propelled or mobile-drawn spraying machine for applying the paint for airfield pavements with an arrangement of atomizing nozzles capable of applying the specified line width in a single pass. Provide paint applicator with paint reservoirs or tanks of sufficient capacity and suitable gages to apply paint in accordance with requirements specified. Equip tanks with suitable mechanical agitators. Equip spray mechanism with quick-action valves conveniently located, and include necessary pressure regulators and gages in full view and reach of the operator. Install paint strainers in paint supply lines to ensure freedom from residue and foreign matter that may cause malfunction of the spray guns. The paint applicator must be readily adaptable for attachment of a dispenser for the reflective media approved for use.
2.1.2.1.2.3. Hand Application
Provide spray guns for hand application of paint in areas where the mobile paint applicator cannot be used if there are obstructions or other appurtenant structures in the work area.
2.1.2.2. Thermoplastic Application Equipment
Not applicable.
2.1.2.3. Reflective Media Dispenser
Attach the dispenser for applying the reflective media to the paint/thermoplastic dispenser and designed to operate automatically and simultaneously with the applicator through the same control mechanism. The bead applicator must be capable of adjustment and designed to provide uniform flow of reflective media over the full length and width of the stripe at the rate of coverage specified in paragraph APPLICATION.
If obstructions and other appurtenant structures are included in the work area, the same general requirements apply, but manual bead dispensers may be required.
2.1.2.4. Preformed Tape Application Equipment
Not applicable.
2.2. MATERIALS
Use waterborne paint for airfield markings. The maximum allowable VOC content of pavement markings is 100 grams per liter. Color of markings is indicated on the drawings and must conform to ICAO Annex 14, Volume I for airfields. Provide materials conforming to the requirements specified herein.
2.2.1. Waterborne Paint
The paint shall be acrylic waterborne.
2.2.1.1. White Paint
The white color paint must comply with INTA 16 44 15 B and UNE-EN 1871. The white color paint applied with reflective media must comply with UNE-EN 1436. The characteristics of the white paint have to be:
1. Krebs -Stormer Viscosity: 84 ± 10 UK in accordance with INTA 16 02 18
2. Solid Content: 78.9 ± 2.5 % in accordance with INTA 16 02 31 A
3. Cold/heat Cycle Stability (Δη): Viscosity variation ≤5 UK without orange peel, lumps and deposits in accordance with INTA 16 44 15 B
4. Specific Gravity P: 1.68 ± 0.02 g/cm3 in accordance with INTA 16 02 43
5. Heat Stability (Δη): Viscosity variation ≤5 UK without orange peel, lumps and deposits in accordance with INTA 16 44 15 B
6. Dry Time No-Pick-Up: ≤20 minutes in accordance with INTA 16 02 91
7. Contrast Ratio, B (Rc): ≥ 0.92 (class HP4) in accordance with INTA 16 02
8. Luminance Factor, B (ß): ≥0.88 (class LF7) in accordance with INTA 16
02 07
9. Water Resistance: Without surface defects in accordance with INTA 16 06
10. Folding test: Without cracks and adhered (not come unstuck) in accordance with INTA 16 02 46 B
11. Bleeding Resistance (Δβ): ≥0.95 in accordance with INTA 16 44 15 B
12. Accelerated Aging QUV-B (Δβ): ≤0.05 without defects (class UV1) in accordance with INTA 16 06 11
13. Alkali Resistance: Surface without damage in accordance with INTA 16
44 15 B
14. Scrub Resistance (Δm): ≤75 mg/500 cycles in accordance with INTA 16 02 86
15. Wet Abrasion Resistance (Δm): ≤175 mg/100 cycles in accordance with
INTA 16 02 86
2.2.1.2. Yellow Paint
The yellow color paint must comply with INTA 16 44 15 B and UNE-EN 1871. The yellow color paint applied with reflective media must comply with UNE-EN 1436. The characteristics of the yellow paint have to be: