Submittals
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ENGLISH_SPEC_15-1008.pdf | ||
| DRAWINS_15-1008.pdf | ||
| SPANISH_SPEC_15-1008.pdf | ||
| 15-1008_CONSTRUCTION_COST_ESTIMATE_BREAKDOWN_KTOR.xlsx | XLSX spreadsheet | |
| 15-1008_CONSTRUCTION_COST_ESTIMATE_BREAKDOWN_KTOR.xlsx | XLSX spreadsheet | |
| 04_Drawings_17-1012.pdf | ||
| 03_Specs_17-1012_en.pdf | ||
| 03_Specs_17-1012_sp.pdf | ||
| 15-1008_Schedule_of_Material_Submittals.xlsx | XLSX spreadsheet | |
| FA5575-18-B-0003,_Hazmat_Cover.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | |||
| QUUG 15-1008 | PROJECT TITLE | |||
| RPL HWAP FLTY 210 | SOLICITATION / CONTRACT NO. |
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DISAPPROVED | ||||||||||||||||||||||
| SECTION 01 11 00 | |||||||||||||||||||||||
| 1 | Construction Schedule | NTP+5 | |||||||||||||||||||||
| 2 | Work Plan | NTP+5 | |||||||||||||||||||||
| SECTION 01 11 01 | |||||||||||||||||||||||
| 3 | Progress Schedule | 1 | NTP+5 | ||||||||||||||||||||
| 4 | Mobility Plan | 1 | NTP+5 | ||||||||||||||||||||
| 5 | Project sign | 1 | Site fencing+1 | ||||||||||||||||||||
| 6 | Quality Control Plan | 1 | NTP+5 | ||||||||||||||||||||
| 7 | Waste & construction debris management | 1 | Final Inspection | ||||||||||||||||||||
| 8 | As-Built drawings | 1 | FI+15 | ||||||||||||||||||||
| 9 | Spatial Data | 1 | FI+15 | ||||||||||||||||||||
| 10 | Key Personnel | 1 | NTP+5 | ||||||||||||||||||||
| 11 | Personel listing | 1 | NTP+5 | ||||||||||||||||||||
| 12 | Safety Program | 1 | NTP+5 | ||||||||||||||||||||
| 13 | Warranty letter | 1 | FI+30 | ||||||||||||||||||||
| SECTION 02 41 10 | |||||||||||||||||||||||
| 14 | Program and schedule of the works | 1 | |||||||||||||||||||||
| 15 | Demolition plan | 1 | |||||||||||||||||||||
| 16 | Management and disposal plan of the waste | 1 | |||||||||||||||||||||
| 17 | Manager of waste from demolition and construction | 1 | |||||||||||||||||||||
| 18 | Authorized dump or treatment and recovery plant | 1 | |||||||||||||||||||||
| 19 | Delivery and disposal certicate of waste | 1 | |||||||||||||||||||||
| SECTION 02 82 16.0021 | |||||||||||||||||||||||
| 20 | Respiratory protection equipment | 1 | Antes de cualquier trabajo | ||||||||||||||||||||
| 21 | Individual protective equipment | 1 | Antes de cualquier trabajo | ||||||||||||||||||||
| 22 | Landfill approval | 1 | Antes de cualquier trabajo | ||||||||||||||||||||
| 23 | Risk prevention personnel training | 1 | Antes de cualquier trabajo | ||||||||||||||||||||
| 24 | Certificate of register in the RERA | 1 | Antes de cualquier trabajo | ||||||||||||||||||||
| 25 | Asbestos hazard abatement plan | 1 | Antes de cualquier trabajo | ||||||||||||||||||||
| 26 | Notification of commencement of works | 1 | Antes de cualquier trabajo | ||||||||||||||||||||
| 27 | Waste disposal | 1 | Después de los trabajos | ||||||||||||||||||||
| SECTION 03 30 00.00 20 | |||||||||||||||||||||||
| 28 | Concrete batch plant | 1 | |||||||||||||||||||||
| 29 | Concrete Control Test Program | 1 | |||||||||||||||||||||
| 30 | Results of the Concrete Control Tests | 1 | |||||||||||||||||||||
| 31 | Assembly of ironworks | 1 | |||||||||||||||||||||
| 32 | Polypropylene fiber | 1 | |||||||||||||||||||||
| 33 | Pool deck drain slope shop drawing | ||||||||||||||||||||||
| SECTION 05 12 00 | |||||||||||||||||||||||
| 34 | Erection Plan | 4 | |||||||||||||||||||||
| 48 | Welding procedures and qualifications | 4 | |||||||||||||||||||||
| 49 | Steel manufacturer certification | 1 | |||||||||||||||||||||
| 50 | Electrowelded galvanized wire mesh | 1 | |||||||||||||||||||||
| 51 | Bolt, nuts and washers | 1 | |||||||||||||||||||||
| 52 | Door hinges | 1 | |||||||||||||||||||||
| SECTION 07 40 00.00 41 | |||||||||||||||||||||||
| 53 | Roofing panels | 1 | Antes de cualquier trabajo | ||||||||||||||||||||
| 54 | Siding panels | 1 | Antes de cualquier trabajo | ||||||||||||||||||||
| 55 | Accessories | 1 | Antes de cualquier trabajo | ||||||||||||||||||||
| 56 | Fasteners | 1 | Antes de cualquier trabajo | ||||||||||||||||||||
| 57 | Panels, supports and flashing installation | 1 | Antes de cualquier trabajo | ||||||||||||||||||||
| 58 | Door installations | 1 | Antes de cualquier trabajo | ||||||||||||||||||||
| 59 | Roof and siddin pannels | 1 | Antes de cualquier trabajo | ||||||||||||||||||||
| SECTION 07 92 00 | |||||||||||||||||||||||
| 60 | Sealants, primers and bond breakers | 1 | |||||||||||||||||||||
| SECTION 09 90 00 | |||||||||||||||||||||||
| 61 | Each type of paint or coating | 1 | 1 | 1 | 1 | Antes de cualquier trabajo | |||||||||||||||||
| 62 | Delivery Note | 1 | Antes de cualquier trabajo | ||||||||||||||||||||
| SECTION 16640 | |||||||||||||||||||||||
| 63 | Wire, grounding rod, handhole, Cadweld weld | 1 | 1 | 1 | 1 | 1 | 1 | Antes de cualquier trabajo | |||||||||||||||
| SECTION 32 31 13.53 | |||||||||||||||||||||||
| 64 | Post, chain link fence and barbed wire | 1 | Antes de cualquier trabajo |
&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N
MSS Spanish
| RESUMEN MUESTRAS DE MATERIAL | NÚMERO PROYECTO: | |||
| 15-1008 | TÍTULO DE PROYECTO: | |||
| REEMPLAZAR CUBIERTA DEL PUNTO DE ACUMULACION DE RESIDUOS, EDIF. 210 | SOLICITACIÓN / CONTRATO NO. |
| (A cumplimentar por el ingeniero del proyecto) | (A cumplimentar por administrador del contrato) | ||||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||||||||||
| LÍNEA NÚMERO | PARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓN | CERTIFICADO DE CUMPLIMIENTO | PLANOS DE TALLER | MUESTRAS | SELECCIÓN DE COLOR | RECOMENDACIONES DEL FABRICANTE | GARANTÍA DEL FABRICANTE | DATOS DE CATÁLOGO | INSTRUCCIONES DE FUNCIONAMIENTO | PROGRAMAS, LISTADOS, INFORMES, PLANES | DATOS TÉCNICOS | PRUEBAS | INFORMES DE TRABAJOS DE CAMPO | FECHA DE ENTREGA | FECHA RECEPCIÓN EN CONTRATACIÓN | FECHA EN INGENIERíA CIVIL | FECHA LÍMITE DE DEVOLUCIÓN | NÚMERO DE MUESTRA | FECHA NOTIFICACIÓN A CONTRATISTA | SEGUNDA PRESENTACIÓN DEL CONTRATISTA | APROBACIÓN FINAL | OBSERVACIONES | |
| APROBADO | DESAPROBADO | ||||||||||||||||||||||
| SECCIÓN 01 11 00 | |||||||||||||||||||||||
| 1 | Plan de construcción | 1 | NTP+5 | ||||||||||||||||||||
| 2 | Plan de obra | 1 | NTP+5 | ||||||||||||||||||||
| SECCIÓN 01 11 01 | |||||||||||||||||||||||
| 3 | Programa de avance de obras | 1 | NTP+5 | ||||||||||||||||||||
| 4 | Plan de movilización | 1 | NTP+5 | ||||||||||||||||||||
| 5 | Cartel de obra | 1 | Vallado+1 | ||||||||||||||||||||
| 6 | Plan de control de calidad | 1 | NTP+10 | ||||||||||||||||||||
| 7 | Gestión de residuos y escombros | 1 | Inspección final | ||||||||||||||||||||
| 8 | Planos As-Builts | 1 | IF+15 | ||||||||||||||||||||
| 9 | Datos espaciales | 1 | Aprobación As-Builts+15 | ||||||||||||||||||||
| 10 | Personal clave | 1 | NTP+15 | ||||||||||||||||||||
| 11 | Listado de personal | 1 | NTP+15 | ||||||||||||||||||||
| 12 | Plan de seguridad | 1 | Antes de cualquier trabajo | ||||||||||||||||||||
| 13 | Carta de garantía | 1 | IF+30 | ||||||||||||||||||||
| SECCIÓN 02 41 01 | |||||||||||||||||||||||
| 14 | Programa y plan de las obras | 1 | |||||||||||||||||||||
| 15 | Plan de demolición | 1 | Antes de cualquier trabajo | ||||||||||||||||||||
| 16 | Plan de gestión y eliminación de residuos | 1 | Antes de cualquier trabajo | ||||||||||||||||||||
| 17 | Gestor de residuos | 1 | Antes de cualquier trabajo | ||||||||||||||||||||
| 18 | Vertedero autorizado o planta de tratamiento y valorización de residuos | 1 | Antes de cualquier trabajo | ||||||||||||||||||||
| 19 | Depósitos de residuos | 1 | |||||||||||||||||||||
| SECCIÓN 02 82 16.0021 | |||||||||||||||||||||||
| 20 | Equipo de protección respiratoria | 1 | Antes de cualquier trabajo | ||||||||||||||||||||
| 21 | Equipos de protección individual | 1 | Antes de cualquier trabajo | ||||||||||||||||||||
| 22 | Aproación del vertedero | 1 | Antes de cualquier trabajo | ||||||||||||||||||||
| 23 | Formación de los trabajadores | 1 | Antes de cualquier trabajo | ||||||||||||||||||||
| 24 | Inscripción de la empresa en el RERA | 1 | Antes de cualquier trabajo | ||||||||||||||||||||
| 25 | Plan de retirada y eliminación de amianto | 1 | Antes de cualquier trabajo | ||||||||||||||||||||
| 26 | Notificación de comienzo de los trabajos | 1 | Antes de cualquier trabajo | ||||||||||||||||||||
| 27 | Depósitos de residuos | 1 | Antes de cualquier trabajo | ||||||||||||||||||||
| SECCIÓN 03 30 00.00 20 | |||||||||||||||||||||||
| 28 | Inspección de la central de fabricación del hormigón | 1 | |||||||||||||||||||||
| 29 | Programa ensayos control del hormigón | 1 | |||||||||||||||||||||
| 30 | Resultado de los ensayos de control del hormigón | 1 | |||||||||||||||||||||
| 31 | Plano de montaje de ferralla | 1 | |||||||||||||||||||||
| 32 | Fibra de polipropileno | 1 | |||||||||||||||||||||
| 33 | Plano de pendientes de plataforma | 1 | 1 | ||||||||||||||||||||
| SECCIÓN 05 12 00 | |||||||||||||||||||||||
| 34 | Plano de montaje | 1 | |||||||||||||||||||||
| 48 | Procedimiento y culaificaciones para soldadura | 1 | |||||||||||||||||||||
| 49 | Certificado del fabricante de acero | 1 | |||||||||||||||||||||
| 50 | Malla electosoldada galvanizada | 1 | |||||||||||||||||||||
| 51 | Tornillos, tuercas y arandelas | 1 | |||||||||||||||||||||
| 52 | Bisagras de las puertas | 1 | |||||||||||||||||||||
| SECCIÓN 07 40 00.00 41 | |||||||||||||||||||||||
| 53 | Paneles de cubierta | 1 | Antes de cualquier trabajo | ||||||||||||||||||||
| 54 | Paneles de fachada | 1 | Antes de cualquier trabajo | ||||||||||||||||||||
| 55 | Accesorios | 1 | Antes de cualquier trabajo | ||||||||||||||||||||
| 56 | Tornilleria | 1 | Antes de cualquier trabajo | ||||||||||||||||||||
| 57 | Colocación de paneles. Remates y apoyos | 1 | Antes de cualquier trabajo | ||||||||||||||||||||
| 58 | Instalación de puertas | 1 | Antes de cualquier trabajo | ||||||||||||||||||||
| 59 | Paneles de cubierta y fachada | 1 | Antes de cualquier trabajo | ||||||||||||||||||||
| SECCIÓN 07 92 00 | |||||||||||||||||||||||
| 60 | Sellantes, imprimación y desencofrantes | 1 | 1 | ||||||||||||||||||||
| SECCIÓN 09 90 00 | |||||||||||||||||||||||
| 61 | Cada tipo de recubrimiento | 1 | 1 | 1 | 1 | ||||||||||||||||||
| 62 | Albaranes de suministro | 1 | |||||||||||||||||||||
| SECCIÓN 16640 | |||||||||||||||||||||||
| 63 | Cable, pica, arqueta y soldadura Cadweld | 1 | 1 | 1 | 1 | 1 | 1 | ||||||||||||||||
| SECCIÓN 32 31 13.53 | |||||||||||||||||||||||
| 64 | Postes, malla y alambre de espino | 1 |