Price Breakdown

View the file

Other files

File Type Posted
ENGLISH_SPEC_15-1008.pdf PDF
15-1008_Schedule_of_Material_Submittals.xlsx XLSX spreadsheet
DRAWINS_15-1008.pdf PDF
SPANISH_SPEC_15-1008.pdf PDF
15-1008_CONSTRUCTION_COST_ESTIMATE_BREAKDOWN_KTOR.xlsx XLSX spreadsheet
04_Drawings_17-1012.pdf PDF
03_Specs_17-1012_en.pdf PDF
03_Specs_17-1012_sp.pdf PDF
15-1008_Schedule_of_Material_Submittals.xlsx XLSX spreadsheet
FA5575-18-B-0003,_Hazmat_Cover.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KTOR

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
RPL COVER HAZMAT WASTE STORAGE ACUMULATION POINT, 2100.00 €
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 15-1008MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
ARCHITECTURAL WORKS
TRABAJOS DE ARQUITECTURA
Eliminación y envío a vertedero de amianto
Removal and disposal of asbestos materials
1Asbestos Hazard Abatement and Disposal Plan
Elaboración del plan de gestión y eliminacion de amiantoJOB
2Remove asbestos cement roof panels
Desmointar placas de cemento-amiantoJOB
3Packaging and labeling of asbestos cement panels
Empaquetar y etiquetar placas de fribrocemento.JOB
4Transport and disposal waste to authorized dump
Transportar y depositar materiales en vertedero autoriz.JOB
Total eliminación y envío a vertedero de amianto
Total Removal and disposal of asbestos materials
Demolition Work
Trabajos de Demolición
5Utilities disconnection
Desconexión de sistemasJOB
6Disassembly on grounding system for reinstalation
Desmontaje de sistema de tierra para reinstalarloJOB
7Remove galvanize pipe structure and wire fabric
Eliminar estructura de tubos galvan. y mallasm²
8Demolish small brick wall box
Demoler cerrado de murete de ladrilloJOB
9Demolish concrete slab, base course & embeded elements
Demoler losa de hormigón, subbase y elemen. Embebidosm²
10Demolish aggregate layer, geotextil and folden elements
Demoler capa de grava, geotextil y elementos extrañosm²
11Separate, load and transport the waste to authorized dump
Separar, cargar y transportar residuos a vertedero autorJOB
Total Demoliton Work
Total Trabajos de Demolición
Earth Movements
Movimientos de tierras
12Excavate, level and compact the new slab subgrade
Excavar, nivelar y compactar fondo de caja de soleram²
13Provide material and install geotextil
Proveer material y extender geotextilm²
14Provide crash aggregate and compact the subgrade
Proveer zahorra de machaqueo y compactarm²
15Provide selected aggregate and install drainage layer
Proveer arido seleccionado y extender capa drenantem²
Total Earth Movement
Total movimientos de tierras
Concrete Works
Trabajos de Hormigón
16Provide material and pour concrete for floor slab
Proveer material y verter hormigón para soleram²
17Provide material and install grounding system handholes
Proveer material e instalar arquetas de sistema d tierraEA
18Provide material and seal construction/expansion joints
Proveer material y sellar juntas de construc/retracciónJOB
Total Concrete Works
Total Trabajos de Hormigón
Metal Works
Metalistería
19Provide material and install structure metal frames
Proveer material e installar marcos de estruct. Metálicakg
20Provide material and install sandwich panel partitions
Proveer maerial e instalar particiones de panel aislanteEA
21Provide material and install metal/mesh doors & accessor.
Proveer material e instalar puertas metal/malla y acces.EA
Total Metal Works
Total Metalistería
Thermal and Moisture Protection
Protección térmica e impermeabilización
22Provide material and install roof panel and accessories
Proveer material e instalar panel de cubierta y accesor.m²
23Provide material and install siding panel & accessories
Proveer material e instalar panel de cerramiento y acces.m²
24Provide material and install flashings and seal joints
Proveer material e instalar remates y sellar juntasLm
Total Thermal and Moisture Protection
Total Protección térmica e impermeabilización
Finishes Works
Trabajos de Acabados
25Clean metal surface, apply primer and finish coating
Limpiar superf metalica, aplicar imprimación y acabadom²
Total Finishes
Total Trabajos de Acabados
Miscellaneous
Trabajos Varios
26Reinstall grounding bars and accessories
Reinstalar barra de toma de tierra y accesoriosJOB
27Install new grounding system rod
Instalar nuevas picas de toma de tierraEA
28Provide copper cable and conect by weld grounding bars
Proveer cable de cobre y conectar picas por soldad exot.EA
Provide grounding test
Realizar test de conexión a tierraEA
Total Miscellaneous
Total Trabajos Varios
ARCHITECTURAL WORK
RESUMEN TRABAJOS DE ARQUITECTURA
Eliminación y envío a vertedero de amianto
Removal and disposal of asbestos materials
Demolition Works
Trabajos de Demolición
Earth Movements
Movimientos de tierra
Concrete Works
Trabajos de Hormigón
Metal Works
Metalistería
Thermal and Moisture Protection
Protección térmica e impermeabiización
Finishes Works
Trabajos de Acabados
Miscellaneous Works
Trabajos varios
TOTAL ARCHITECTURAL
TOTAL TRABAJOS DE ARQUITECTURA
SUMMARY
RESUMEN
TOTAL ARCHITECTURAL WORK
TOTAL TRABAJOS ARQUITECTURA
GRAND TOTAL
GRAN TOTAL
`
TOTAL MATERIAL COSTS

TOTAL LABOR COSTS

TOTAL OTHER DIRECT COSTS

TOTAL DIRECT COSTS

OVERHEAD

SUBTOTAL

PROFIT

TOTAL PROJECT EUROS

DATE: FIRM NAME:

&"Times New Roman,Regular"CONSTRUCTION COST ESTIMATE BREAKDOWN &"Times New Roman,Regular"Page &P of &N

File details come from the government source that posted it.