15-1008_CONSTRUCTION_COST_ESTIMATE_BREAKDOWN_KTOR.xlsx
XLSX spreadsheet 26 KB Posted
- Solicitation number
- FA5575-18-B-0003
About this file
Price Breakdown
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ENGLISH_SPEC_15-1008.pdf | ||
| 15-1008_Schedule_of_Material_Submittals.xlsx | XLSX spreadsheet | |
| DRAWINS_15-1008.pdf | ||
| SPANISH_SPEC_15-1008.pdf | ||
| 15-1008_CONSTRUCTION_COST_ESTIMATE_BREAKDOWN_KTOR.xlsx | XLSX spreadsheet | |
| 04_Drawings_17-1012.pdf | ||
| 03_Specs_17-1012_en.pdf | ||
| 03_Specs_17-1012_sp.pdf | ||
| 15-1008_Schedule_of_Material_Submittals.xlsx | XLSX spreadsheet | |
| FA5575-18-B-0003,_Hazmat_Cover.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KTOR
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORÓN AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPL COVER HAZMAT WASTE STORAGE ACUMULATION POINT, 210 | 0.00 € | |||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 15-1008 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| ARCHITECTURAL WORKS | ||||||||||
| TRABAJOS DE ARQUITECTURA |
| Eliminación y envío a vertedero de amianto | ||
| Removal and disposal of asbestos materials | ||
| 1 | Asbestos Hazard Abatement and Disposal Plan | |
| Elaboración del plan de gestión y eliminacion de amianto | JOB | |
| 2 | Remove asbestos cement roof panels | |
| Desmointar placas de cemento-amianto | JOB | |
| 3 | Packaging and labeling of asbestos cement panels | |
| Empaquetar y etiquetar placas de fribrocemento. | JOB | |
| 4 | Transport and disposal waste to authorized dump | |
| Transportar y depositar materiales en vertedero autoriz. | JOB | |
| Total eliminación y envío a vertedero de amianto | ||
| Total Removal and disposal of asbestos materials |
| Demolition Work | ||
| Trabajos de Demolición | ||
| 5 | Utilities disconnection | |
| Desconexión de sistemas | JOB | |
| 6 | Disassembly on grounding system for reinstalation | |
| Desmontaje de sistema de tierra para reinstalarlo | JOB | |
| 7 | Remove galvanize pipe structure and wire fabric | |
| Eliminar estructura de tubos galvan. y mallas | m² | |
| 8 | Demolish small brick wall box | |
| Demoler cerrado de murete de ladrillo | JOB | |
| 9 | Demolish concrete slab, base course & embeded elements | |
| Demoler losa de hormigón, subbase y elemen. Embebidos | m² | |
| 10 | Demolish aggregate layer, geotextil and folden elements | |
| Demoler capa de grava, geotextil y elementos extraños | m² | |
| 11 | Separate, load and transport the waste to authorized dump | |
| Separar, cargar y transportar residuos a vertedero autor | JOB | |
| Total Demoliton Work | ||
| Total Trabajos de Demolición |
| Earth Movements | ||
| Movimientos de tierras | ||
| 12 | Excavate, level and compact the new slab subgrade | |
| Excavar, nivelar y compactar fondo de caja de solera | m² | |
| 13 | Provide material and install geotextil | |
| Proveer material y extender geotextil | m² | |
| 14 | Provide crash aggregate and compact the subgrade | |
| Proveer zahorra de machaqueo y compactar | m² | |
| 15 | Provide selected aggregate and install drainage layer | |
| Proveer arido seleccionado y extender capa drenante | m² | |
| Total Earth Movement | ||
| Total movimientos de tierras |
| Concrete Works | ||
| Trabajos de Hormigón | ||
| 16 | Provide material and pour concrete for floor slab | |
| Proveer material y verter hormigón para solera | m² | |
| 17 | Provide material and install grounding system handholes | |
| Proveer material e instalar arquetas de sistema d tierra | EA | |
| 18 | Provide material and seal construction/expansion joints | |
| Proveer material y sellar juntas de construc/retracción | JOB | |
| Total Concrete Works | ||
| Total Trabajos de Hormigón |
| Metal Works | ||
| Metalistería | ||
| 19 | Provide material and install structure metal frames | |
| Proveer material e installar marcos de estruct. Metálica | kg | |
| 20 | Provide material and install sandwich panel partitions | |
| Proveer maerial e instalar particiones de panel aislante | EA | |
| 21 | Provide material and install metal/mesh doors & accessor. | |
| Proveer material e instalar puertas metal/malla y acces. | EA | |
| Total Metal Works | ||
| Total Metalistería |
| Thermal and Moisture Protection | ||
| Protección térmica e impermeabilización | ||
| 22 | Provide material and install roof panel and accessories | |
| Proveer material e instalar panel de cubierta y accesor. | m² | |
| 23 | Provide material and install siding panel & accessories | |
| Proveer material e instalar panel de cerramiento y acces. | m² | |
| 24 | Provide material and install flashings and seal joints | |
| Proveer material e instalar remates y sellar juntas | Lm | |
| Total Thermal and Moisture Protection | ||
| Total Protección térmica e impermeabilización |
| Finishes Works | ||
| Trabajos de Acabados | ||
| 25 | Clean metal surface, apply primer and finish coating | |
| Limpiar superf metalica, aplicar imprimación y acabado | m² | |
| Total Finishes | ||
| Total Trabajos de Acabados |
| Miscellaneous | ||
| Trabajos Varios | ||
| 26 | Reinstall grounding bars and accessories | |
| Reinstalar barra de toma de tierra y accesorios | JOB | |
| 27 | Install new grounding system rod | |
| Instalar nuevas picas de toma de tierra | EA | |
| 28 | Provide copper cable and conect by weld grounding bars | |
| Proveer cable de cobre y conectar picas por soldad exot. | EA | |
| Provide grounding test | ||
| Realizar test de conexión a tierra | EA | |
| Total Miscellaneous | ||
| Total Trabajos Varios |
| ARCHITECTURAL WORK |
| RESUMEN TRABAJOS DE ARQUITECTURA |
| Eliminación y envío a vertedero de amianto |
| Removal and disposal of asbestos materials |
| Demolition Works |
| Trabajos de Demolición |
| Earth Movements |
| Movimientos de tierra |
| Concrete Works |
| Trabajos de Hormigón |
| Metal Works |
| Metalistería |
| Thermal and Moisture Protection |
| Protección térmica e impermeabiización |
| Finishes Works |
| Trabajos de Acabados |
| Miscellaneous Works |
| Trabajos varios |
| TOTAL ARCHITECTURAL |
| TOTAL TRABAJOS DE ARQUITECTURA |
| SUMMARY |
| RESUMEN |
| TOTAL ARCHITECTURAL WORK |
| TOTAL TRABAJOS ARQUITECTURA |
| GRAND TOTAL |
| GRAN TOTAL |
| ` | |
| TOTAL MATERIAL COSTS |
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD
SUBTOTAL
PROFIT
TOTAL PROJECT EUROS
DATE: FIRM NAME:
&"Times New Roman,Regular"CONSTRUCTION COST ESTIMATE BREAKDOWN &"Times New Roman,Regular"Page &P of &N