SCHEDULE OF MATERIAL SUBMITTALS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_2.pdf | ||
| Requirement_Clarifications.pdf | ||
| Amendment_1.pdf | ||
| QUUG_13-1012_SPECIFICATIONS_100_(es).pdf | ||
| QUUG_13-1012_DRAWINGS_100_.pdf | ||
| FA5575-17-B-0004.pdf | ||
| QUUG_13-1012_SPECIFICATIONS_100_(en).pdf | ||
| 13-1012_Construction_Cost_Estimate_Breakdown_Ktor.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedul
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | ||
| QUUG 13-1012 | PROJECT TITLE |
REPAIR GYM WATER SEEPAGE THROUGH EXTERIOR
SOLICITATION / CONTRACT NO.
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
fergusog: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
fergusog: Enter any comments pertaining to the submittal
APPROVED
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECTION 01 11 00 | |||||||||||||
| 1 | Construction Schedule | 1 | NTP+5 | ||||||||||
| 2 | Work Plan | 1 | NTP+5 | ||||||||||
| 3 | Shut-off Schedule Plan | 1 | Each Phase Start - 15 | ||||||||||
| SECTION 01 11 01 | |||||||||||||
| 4 | Progress Schedule | 1 | NTP+5 | ||||||||||
| 5 | Mobility Plan | 1 | NTP+5 | ||||||||||
| 6 | Quality Control Plan | 1 | NTP+10 | ||||||||||
| 7 | Waste & construction debris management | 1 | Prior to FI | ||||||||||
| 8 | As-Built drawings | 1 | Prior to FI | ||||||||||
| 9 | Project Sign | 1 | NTP+15 | ||||||||||
| 10 | Spatial Data | 1 | Prior to FI | ||||||||||
| 11 | Key Personnel | 1 | NTP+15 | ||||||||||
| 12 | Safety Program | 1 | Before any work execution | ||||||||||
| 13 | Warranty letter | 1 | Prior to FI | ||||||||||
| 14 | O&M Manuals | 1 | Prior to FI | ||||||||||
| SECTION 02 41 10 | |||||||||||||
| 15 | Program and schedule of the works | 1 | |||||||||||
| 16 | Demolition plan | 1 | |||||||||||
| 17 | Management and disposal plan of the waste | 1 | |||||||||||
| 18 | Manager of waste from demolition and construction | 1 | |||||||||||
| 19 | Authorized dump or treatment and recovery plant | 1 | |||||||||||
| 20 | Delivery and disposal certicate of waste | 1 | |||||||||||
| SECTION 03 45 00 | |||||||||||||
| 21 | Precast concrete elements | 1 | 1 | ||||||||||
| 22 | Cast-In Embedded Items And Connectors | 1 | 1 | ||||||||||
| 23 | Connection Devices | 1 | |||||||||||
| 24 | Gasket | 1 | |||||||||||
| 25 | Concrete Wall Panel Surface Finish | 1 | |||||||||||
| 26 | Design Calculations | 1 | |||||||||||
| 27 | Concrete Mix Design | 1 | |||||||||||
| 28 | Concrete Mix Design for Repair of Surface Defects | 1 | |||||||||||
| 29 | Strength Tests | 1 | |||||||||||
| 30 | Slump | 1 | |||||||||||
| 31 | Air content | 1 | |||||||||||
| 32 | Test for concrete materials | 1 | |||||||||||
| 33 | Water | 1 | |||||||||||
| 34 | Testing precast units for strength | 1 | |||||||||||
| 35 | Manufacturer Quality Certifications | 1 | |||||||||||
| 36 | Installation | 1 | |||||||||||
| 37 | Cleaning | 1 | |||||||||||
| SECTION 04 20 00 | |||||||||||||
| 38 | Hollow brick, brick, clayblock | 1 | 1 | ||||||||||
| 39 | SECTION 05 12 00 | ||||||||||||
| 40 | Erection Plan | 1 | |||||||||||
| 41 | Welding procedures and qualifications | 1 | |||||||||||
| 42 | Certified welding process | 1 | |||||||||||
| 43 | Quality Control and Testing Plan | 1 | |||||||||||
| 44 | Results of tests | 1 | |||||||||||
| 45 | Design and calculations | 1 | 1 | ||||||||||
| SECTION 06 20 00 | |||||||||||||
| 46 | Phenolic panels | 1 | 1 | 1 | 1 | 1 | |||||||
| SECTION 07 13 53 | |||||||||||||
| 47 | Elastomeric sheet waterproofing | 1 | 1 | 1 | 1 | ||||||||
| 48 | Primers, Adhesives, and Mastics | 1 | |||||||||||
| SECTION 07 42 13 | |||||||||||||
| 49 | Qualification of Manufacturer. | 1 | |||||||||||
| 50 | Qualification of Installation Contractor | 1 | |||||||||||
| 51 | Qualification of Welders | 1 | |||||||||||
| 52 | Metal sandwich panel | 1 | 1 | 1 | 1 | 1 | 1 | 1 | |||||
| 54 | Shop drawings | 1 | |||||||||||
| SECTION 07 92 00 | |||||||||||||
| 55 | Sealants, primers and bond breakers | 1 | |||||||||||
| SECTION 08 81 00 | |||||||||||||
| 56 | Glazing | 1 | 1 | 1 | 1 | 1 | |||||||
| 57 | Setings and sealing materials | 1 | |||||||||||
| SECTION 08 51 13 | |||||||||||||
| 58 | Complete Windows | 1 | 1 | 1 | 1 | 1 | |||||||
| 59 | Hardware, Fasteners, Windows performance, Thermal-Barrier, Mullions, Window Cleaners' Bolts, Screens, Accesories. | 1 | 1 | ||||||||||
| 60 | Adhesives | 1 | |||||||||||
| 61 | Thermal performance | 1 | |||||||||||
| 62 | Design analysis and calculations | 1 | |||||||||||
| 63 | Windows electrical motors | 1 | |||||||||||
| 64 | Transformers for electrical motors | 1 | |||||||||||
| SECTION 09 90 00 | |||||||||||||
| 65 | Coating and/or product furnished | 1 | |||||||||||
| 66 | R90 intumescent coating thickness test | ||||||||||||
| SECTION 21 13 13 | |||||||||||||
| 67 | Piping and accessories | 1 | 1 | ||||||||||
| 68 | Pipe hangers and supports | 1 | |||||||||||
| 69 | Qualification of installer | 1 | |||||||||||
| 70 | Inspection | 1 | |||||||||||
| 71 | Hydraulic calculation of the temporary modification and final condition | 1 | |||||||||||
| 72 | Drawings of temporary modification of Fire Department connection and Sprinkler alarm. | 1 | |||||||||||
| 73 | Drawings of final condition, once the modified elements return to the original position. | 1 | |||||||||||
| 74 | As-Built drawings | 1 | |||||||||||
| SECTION 22 00 00 | |||||||||||||
| 75 | Copper piping and accesories | 1 | 1 | ||||||||||
| 76 | Polyethylene piping and accesories | 1 | 1 | ||||||||||
| 77 | Valves | 1 | |||||||||||
| 78 | Hose bibb and hose connection vacuum breaker | 1 | |||||||||||
| 79 | Transition fitting for polyethylene/ cooper | 1 | |||||||||||
| 80 | Irrigation system materials | 1 | |||||||||||
| SECTION 23 00 00 | |||||||||||||
| 81 | Air distribution system cleaning/ disinfection company | 1 | |||||||||||
| 82 | Cleaning report | 1 | |||||||||||
| 83 | Testing of air conditioning systems duct | 1 | |||||||||||
| SECTION 26 20 00 | |||||||||||||
| 84 | RMC Conduit and fittings (1 of each size) | 1 | |||||||||||
| 85 | EMT Conduit and fittings (1 of each size) | 1 | |||||||||||
| 86 | FMC Conduit and fittings (1 of each size) | 1 | |||||||||||
| 87 | Rigid polycarbonate conduit | 1 | |||||||||||
| 88 | Surface Metal Raceway and fittings (all sizes) | 1 | |||||||||||
| 89 | Flexible Non-Metallic Conduit and fittings (1 of each size) | 1 | |||||||||||
| 90 | Junction and pull boxes | 1 | |||||||||||
| 91 | Outlet boxes and covers | 1 | |||||||||||
| 92 | Wires and cables | 1 | |||||||||||
| 93 | Splices and Termination Components | 1 | |||||||||||
| 94 | Circuit breakers | 1 | |||||||||||
| 95 | Device Plates | 1 | |||||||||||
| 96 | Receptacles (one of each type) | 1 | |||||||||||
| 97 | Switches and Key Switches (one of each type) | 1 | |||||||||||
| 98 | Labels | 1 | |||||||||||
| 99 | Existing Drawings | 1 | |||||||||||
| 100 | As-built Drawings | 1 | |||||||||||
| 101 | Devices Subject to Manual Operation | 1 | Prior to FI | ||||||||||
| 102 | Wiring test | 1 | Prior to FI | ||||||||||
| 103 | Resistance ground test | 1 | Prior to FI | ||||||||||
| 104 | Single line diagram of the “as-built” building electrical system | 1 | FI-15 | ||||||||||
| 105 | Active electrical equipment | 1 | FI-15 | ||||||||||
| 106 | Grounding bar and supports | 1 | |||||||||||
| SECTION 26 53 00.00 40 | |||||||||||||
| 107 | Exit Lighting Fixtures | 1 | |||||||||||
| 108 | Steel rod guards | 1 | 1 | ||||||||||
| 109 | Operational test | 1 | |||||||||||
| 110 | Energy efficiencies | 1 | |||||||||||
| 111 | O&M Manuals | 1 | 1 | ||||||||||
| SECTION 26 56 00 | |||||||||||||
| 112 | LED Luminaires | 1 | |||||||||||
| 113 | Photocell | 1 | |||||||||||
| 114 | Operational test | 1 | |||||||||||
| 115 | Luminaire Useful Life Certificate | 1 | |||||||||||
| 116 | O&M Manuals | 1 | 1 | ||||||||||
| SECTION 28 10 05 | |||||||||||||
| 117 | Cable | 1 | |||||||||||
| 118 | Installer Qualifications | 1 | |||||||||||
| 119 | Shop drawings of temporary installation for cameras installed in shelter | 1 | |||||||||||
| 120 | If required, new additional material | 1 | |||||||||||
| SECTION 28 31 74.00 20 | |||||||||||||
| 121 | Existing Drawings | 1 | |||||||||||
| 122 | Point-to-Point Wiring Diagrams | 1 | |||||||||||
| 123 | Wiring | 1 | |||||||||||
| 124 | Conduits, junction and pull boxes, outlet boxes and covers | 1 | |||||||||||
| 125 | Manual pull stations | ||||||||||||
| 126 | Visible appliances | ||||||||||||
| 127 | Steel rod guards | 1 | 1 | ||||||||||
| 128 | Qualifications of Installer | 1 | |||||||||||
| 129 | Record of Completion | 1 | |||||||||||
| 130 | Preliminary testing | 1 | |||||||||||
| 131 | Final acceptance testing | 1 | |||||||||||
| 132 | As-Built Drawings of Fire Alarm System | 1 | Prior to FI | ||||||||||
| SECTION 31 23 00 00 20 | |||||||||||||
| 133 | Backfill | 1 | 1 | ||||||||||
| 134 | Cleaning concrete | 1 | 1 | ||||||||||
| SECTION 31 23 00 00 20 | |||||||||||||
| 135 | Concrete | 1 | 1 | ||||||||||
| 136 | Electrowelded mesh | 1 | 1 |
&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N
MSS Spanish
| RESUMEN MUESTRAS DE MATERIAL | NÚMERO PROYECTO: | |||
| QUUG 13-1012 | TÍTULO DE PROYECTO: | |||
| REPARAR FILTRACIONES DE AGUA DESDE EL EXTERIOR EN EL GIMNASIO | SOLICITACIÓN / CONTRATO NO. |
| (A cumplimentar por el ingeniero del proyecto) | (A cumplimentar por administrador del contrato) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LÍNEA NÚMERO | PARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓN | CERTIFICADO DE CUMPLIMIENTO | PLANOS DE TALLER | MUESTRAS | SELECCIÓN DE COLOR | RECOMENDACIONES DEL FABRICANTE | GARANTÍA DEL FABRICANTE | DATOS DE CATÁLOGO | INSTRUCCIONES DE FUNCIONAMIENTO | PROGRAMAS, LISTADOS, INFORMES, PLANES | DATOS TÉCNICOS | PRUEBAS | INFORMES DE TRABAJOS DE CAMPO | FECHA DE ENTREGA |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
FECHA RECEPCIÓN EN CONTRATACIÓN
fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
FECHA LÍMITE DE DEVOLUCIÓN
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
NÚMERO DE MUESTRA
fergusog: Enter the Submittal Number
FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA
fergusog: Enter Resubmittal Number
APROBACIÓN FINAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
OBSERVACIONES
fergusog: Enter any comments pertaining to the submittal
APROBADO
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DESAPROBADO
fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECCIÓN 01 11 00 | |||||||||||||
| 1 | Programa de obra | 1 | NTP+5 | ||||||||||
| 2 | Plan de obra | 1 | NTP+5 | ||||||||||
| 3 | Plan de Cortes de Suministro | 1 | Comienzo de cada fase - 15 | ||||||||||
| SECCIÓN 01 11 01 | |||||||||||||
| 4 | Programa de avance de obras | 1 | NTP+5 | ||||||||||
| 5 | Plan de movilización | 1 | NTP+5 | ||||||||||
| 6 | Plan de control de calidad | 1 | NTP+10 | ||||||||||
| 7 | Gestión de residuos y escombros | 1 | Antes de la Inspección final | ||||||||||
| 8 | Planos As-Builts | 1 | Antes de la Inspección final | ||||||||||
| 9 | Cartel de Obra | 1 | NTP+15 | ||||||||||
| 10 | Datos espaciales | 1 | Antes de la Inspección final | ||||||||||
| 11 | Personal clave | 1 | NTP+15 | ||||||||||
| 12 | Plan de seguridad | 1 | Antes de cualquier trabajo | ||||||||||
| 13 | Carta de garantía | 1 | Antes de la Inspección final | ||||||||||
| 14 | Manuales de Operación y Mantenimiento | 1 | Antes de la Inspección final | ||||||||||
| SECCIÓN 02 41 10 | |||||||||||||
| 15 | Programa y plan de las obras | 1 | |||||||||||
| 16 | Plan de demolición | 1 | |||||||||||
| 17 | Plan de gestión y eliminación de residuos | 1 | |||||||||||
| 18 | Gestor de residuos | 1 | |||||||||||
| 19 | Vertedero autorizado o planta de tratamiento y valorización de residuos | 1 | |||||||||||
| 20 | Depósitos de residuos | 1 | |||||||||||
| SECTION 03 45 00 | |||||||||||||
| 21 | Elementos de hormigón prefabricado | 1 | 1 | ||||||||||
| 22 | Elementos de fundición embebidos y conectores | 1 | 1 | ||||||||||
| 23 | Elementos de unión | 1 | |||||||||||
| 24 | Juntas | 1 | |||||||||||
| 25 | Acabado superficial de panel prefabricado empleado en muros | 1 | |||||||||||
| 26 | Cálculos de diseño | 1 | |||||||||||
| 27 | Diseño de mezcla de hormigón | 1 | |||||||||||
| 28 | Diseño de la mezcla de hormigón de reparación o para defectos superficiales | 1 | |||||||||||
| 29 | Ensayo de resistencia | 1 | |||||||||||
| 30 | Retracción | 1 | |||||||||||
| 31 | Contenido en aire | 1 | |||||||||||
| 32 | Componentes del Hormigón | 1 | |||||||||||
| 33 | Agua | 1 | |||||||||||
| 34 | Ensayo de resistencia de unidades prefabricadas | 1 | |||||||||||
| 35 | Certificados de calidad del fabricante | 1 | |||||||||||
| 36 | Instalación | 1 | |||||||||||
| 37 | Limpieza | 1 | |||||||||||
| SECCIÓN 04 20 00 | |||||||||||||
| 38 | Ladrillos huecos, ladrillos para fábrica y bloques cerámicos | 1 | 1 | ||||||||||
| 39 | SECCIÓN 05 12 00 | ||||||||||||
| 40 | Plano de montaje | 1 | |||||||||||
| 41 | Procedimiento y culaificaciones para soldadura | 1 | |||||||||||
| 42 | Certificado proceso de soldadura | ||||||||||||
| 43 | Plan de control de calidad y y ensayo | ||||||||||||
| 44 | Resultados de los ensayos | ||||||||||||
| 45 | Diseños y cálculos | ||||||||||||
| SECCIÓN 06 20 00 | |||||||||||||
| 46 | Paneles fenólicos | 1 | 1 | 1 | 1 | 1 | |||||||
| SECTION 07 13 53 | |||||||||||||
| 47 | Lámina elastomérica impermeabilizante | 1 | 1 | 1 | 1 | ||||||||
| 48 | Imprimaciones adhesivos y resinas | 1 | 1 | 1 | |||||||||
| SECTION 07 42 13 | |||||||||||||
| 49 | Cualificación del fabricante | 1 | |||||||||||
| 50 | Cualificación del instalador | 1 | |||||||||||
| 51 | Cualificación de soldadores | 1 | |||||||||||
| 52 | Panel sandwich metálico. | 1 | 1 | 1 | 1 | 1 | 1 | 1 | |||||
| 54 | Planos de taller | 1 | |||||||||||
| SECCIÓN 07 92 00 | |||||||||||||
| 55 | Sellantes, imprimación y desencofrantes | 1 | |||||||||||
| SECTION 08 81 00 | |||||||||||||
| 56 | Vidrios | 1 | 1 | 1 | 1 | 1 | |||||||
| 57 | Materiales de colocación y sellado | 1 | |||||||||||
| SECTION 08 51 13 | |||||||||||||
| 58 | Ventanas completas | 1 | 1 | 1 | 1 | 1 | |||||||
| 59 | Elementos, fijaciones, rendimiento, aislamiento térmico, parteluces, pernos limpiacristales, pantallas, accesorios. | 1 | 1 | ||||||||||
| 60 | Adhesivos | 1 | |||||||||||
| 61 | Rendimiento térmico | 1 | |||||||||||
| 62 | Análisis de diseño y cálculos | 1 | |||||||||||
| 63 | Motores eléctricos de ventanas | 1 | |||||||||||
| 64 | Transformadires para motores eléctricos de ventanas | 1 | |||||||||||
| SECCIÓN 09 90 00 | |||||||||||||
| 65 | Recubrimiento y/o producto suministrado | 1 | |||||||||||
| 66 | Medición de espesor de revestimiento intumescente R90 | ||||||||||||
| SECCIÓN 21 13 13 | |||||||||||||
| 67 | Tuberías y accesorios | 1 | 1 | ||||||||||
| 68 | Soporte y colgadores de tubería | 1 | |||||||||||
| 69 | Cualificaciones del instalador | 1 | |||||||||||
| 70 | Inspección | 1 | |||||||||||
| 71 | Cálculo hidráulico de las modificaciones temporales y condición final | 1 | |||||||||||
| 72 | Planos de modificación temporal de conexión del Departamento de Bomberos y Alarma de rociadores | 1 | |||||||||||
| 73 | Planos de condición final, una vez los elementos modificados vuelvan a su posición original | 1 | |||||||||||
| 74 | Planos As-Built | 1 | |||||||||||
| SECCIÓN 22 00 00 | |||||||||||||
| 75 | Tubos de cobre y accesorios | 1 | 1 | ||||||||||
| 76 | Tubos de polietileno y accesorios | 1 | 1 | ||||||||||
| 77 | Válvulas | 1 | |||||||||||
| 78 | Grifo para manguera y rompedor de vacío | 1 | |||||||||||
| 79 | Manguito de transición cobre/polietileno | 1 | |||||||||||
| 80 | Materiales para el sistema de riego | 1 | |||||||||||
| SECCIÓN 23 00 00 | |||||||||||||
| 81 | Empresa de limpieza/desinfección del sistema de distribución de aire | 1 | |||||||||||
| 82 | Informe de limpieza | 1 | |||||||||||
| 83 | Ensayo de conductos del sistema de aire acondicionado | 1 | |||||||||||
| SECCIÓN 26 20 00 | |||||||||||||
| 84 | Tubo RMC y accesorios (1 x cada diámetro) | 1 | |||||||||||
| 85 | Tubo EMT y accesorios (1 x cada diámetro) | 1 | |||||||||||
| 86 | Tubo FMC y accesorios (1 x cada diámetro) | 1 | |||||||||||
| 87 | Tubo rígido de policarbonato | ||||||||||||
| 88 | Canaleta Metálica de Superficie y acc. (todos tamaños) | 1 | |||||||||||
| 89 | Tubo flexible no metálico y accesorios (1 x cada diámetro) | 1 | |||||||||||
| 90 | Cajas de conexión y paso | 1 | |||||||||||
| 91 | Cajas para mecanismos y tapas | 1 | |||||||||||
| 92 | Conductores y cables | 1 | |||||||||||
| 93 | Empalmes y terminales | 1 | |||||||||||
| 94 | Interruptores magnetotérmicos | 1 | |||||||||||
| 95 | Placas de mecanismos | 1 | |||||||||||
| 96 | Enchufes (uno de cada tipo) | 1 | |||||||||||
| 97 | Interruptores e interruptores de llave (uno de cada tipo) | 1 | |||||||||||
| 98 | Etiquetas | 1 | |||||||||||
| 99 | Planos Existentes | 1 | |||||||||||
| 100 | Planos As-Built | 1 | |||||||||||
| 101 | Dispositivos sujetos a operación manual | 1 | Antes de la Inspección final | ||||||||||
| 102 | Pruebas de resistencia de aislamiento de la instalación | 1 | Antes de la Inspección final | ||||||||||
| 103 | Pruebas de resistencia puesta a tierra | 1 | Antes de la Inspección final | ||||||||||
| 104 | Esquema unifilar del sistema eléctrico del edificio tal como se ha instalado en obra | 1 | IF-15 | ||||||||||
| 105 | Equipo eléctrico activo | 1 | IF-15 | ||||||||||
| 106 | Barra de puesta a tierra y soportes | 1 | 1 | ||||||||||
| SECTION 26 53 00.00 40 | |||||||||||||
| 107 | Luminarias de salida | 1 | |||||||||||
| 108 | Rejillas de protección de acero | 1 | 1 | ||||||||||
| 109 | Ensayo de operación | 1 | |||||||||||
| 110 | Eficiencia energética | 1 | |||||||||||
| 111 | O&M Manuales | 1 | 1 | ||||||||||
| SECTION 26 56 00 | |||||||||||||
| 112 | Luminarias LED | 1 | |||||||||||
| 113 | Fotocélula | 1 | |||||||||||
| 114 | Ensayo operacional | 1 | |||||||||||
| 115 | Certificado de vida útil de la luminaria | 1 | |||||||||||
| 116 | O&M Manuales | 1 | 1 | ||||||||||
| SECTION 28 10 05 | |||||||||||||
| 117 | Cable | 1 | |||||||||||
| 118 | Cualificación del instalador | 1 | |||||||||||
| 119 | Planos de instalación provisional para cámaras de carpa | 1 | |||||||||||
| 120 | Si es necesario, nuevo material adicional | 1 | |||||||||||
| SECCIÓN 28 31 74.00 20 | |||||||||||||
| 121 | Planos Existentes | 1 | Antes de realizar ninguna modificación | ||||||||||
| 122 | Esquema de Cableado Punto a Punto | 1 | |||||||||||
| 123 | Cableado | 1 | |||||||||||
| 124 | Conductos, cjas de emplame y tendido, cajas para elementos y tapas | 1 | |||||||||||
| 125 | Pulsadores manuales | ||||||||||||
| 126 | Dispositivos visibles | ||||||||||||
| 127 | Rejillas de protección de acero | ||||||||||||
| 128 | Cualificaciones del Instalador | 1 | |||||||||||
| 129 | Boletín de Instalación | 1 | |||||||||||
| 130 | Ensayo preliminar | 1 | |||||||||||
| 131 | Ensayo final de aceptación | 1 | |||||||||||
| 132 | Planos As-Built del Sistema de Alarma Contra-incendios | 1 | Antes de la Inspección final | ||||||||||
| SECTION 31 23 00 00 20 | |||||||||||||
| 133 | Material de relleno | 1 | 1 | ||||||||||
| 134 | Hormigón de limpieza | 1 | 1 | ||||||||||
| SECTION 31 23 00 00 20 | |||||||||||||
| 135 | Hormigón | 1 | 1 | ||||||||||
| 136 | Malla electrosoldada | 1 | 1 |