SCHEDULE OF MATERIAL SUBMITTALS

View the file

Other files for this federal contract opportunity

Other files attached to Gym Water Seepage, newest first.
File Type Posted
Amendment_2.pdf PDF
Requirement_Clarifications.pdf PDF
Amendment_1.pdf PDF
QUUG_13-1012_SPECIFICATIONS_100_(es).pdf PDF
QUUG_13-1012_DRAWINGS_100_.pdf PDF
FA5575-17-B-0004.pdf PDF
QUUG_13-1012_SPECIFICATIONS_100_(en).pdf PDF
13-1012_Construction_Cost_Estimate_Breakdown_Ktor.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedul

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 13-1012PROJECT TITLE

REPAIR GYM WATER SEEPAGE THROUGH EXTERIOR

SOLICITATION / CONTRACT NO.

(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATE

fergusog: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

fergusog: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

fergusog: Enter any comments pertaining to the submittal

APPROVED

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DISAPPROVED

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECTION 01 11 00
1Construction Schedule1NTP+5
2Work Plan1NTP+5
3Shut-off Schedule Plan1Each Phase Start - 15
SECTION 01 11 01
4Progress Schedule1NTP+5
5Mobility Plan1NTP+5
6Quality Control Plan1NTP+10
7Waste & construction debris management1Prior to FI
8As-Built drawings1Prior to FI
9Project Sign1NTP+15
10Spatial Data1Prior to FI
11Key Personnel1NTP+15
12Safety Program1Before any work execution
13Warranty letter1Prior to FI
14O&M Manuals1Prior to FI
SECTION 02 41 10
15Program and schedule of the works1
16Demolition plan1
17Management and disposal plan of the waste1
18Manager of waste from demolition and construction1
19Authorized dump or treatment and recovery plant1
20Delivery and disposal certicate of waste1
SECTION 03 45 00
21Precast concrete elements11
22Cast-In Embedded Items And Connectors11
23Connection Devices1
24Gasket1
25Concrete Wall Panel Surface Finish1
26Design Calculations1
27Concrete Mix Design1
28Concrete Mix Design for Repair of Surface Defects1
29Strength Tests1
30Slump1
31Air content1
32Test for concrete materials1
33Water1
34Testing precast units for strength1
35Manufacturer Quality Certifications1
36Installation1
37Cleaning1
SECTION 04 20 00
38Hollow brick, brick, clayblock11
39SECTION 05 12 00
40Erection Plan1
41Welding procedures and qualifications1
42Certified welding process1
43Quality Control and Testing Plan1
44Results of tests1
45Design and calculations11
SECTION 06 20 00
46Phenolic panels11111
SECTION 07 13 53
47Elastomeric sheet waterproofing1111
48Primers, Adhesives, and Mastics1
SECTION 07 42 13
49Qualification of Manufacturer.1
50Qualification of Installation Contractor1
51Qualification of Welders1
52Metal sandwich panel1111111
54Shop drawings1
SECTION 07 92 00
55Sealants, primers and bond breakers1
SECTION 08 81 00
56Glazing11111
57Setings and sealing materials1
SECTION 08 51 13
58Complete Windows11111
59Hardware, Fasteners, Windows performance, Thermal-Barrier, Mullions, Window Cleaners' Bolts, Screens, Accesories.11
60Adhesives1
61Thermal performance1
62Design analysis and calculations1
63Windows electrical motors1
64Transformers for electrical motors1
SECTION 09 90 00
65Coating and/or product furnished1
66R90 intumescent coating thickness test
SECTION 21 13 13
67Piping and accessories11
68Pipe hangers and supports1
69Qualification of installer1
70Inspection1
71Hydraulic calculation of the temporary modification and final condition1
72Drawings of temporary modification of Fire Department connection and Sprinkler alarm.1
73Drawings of final condition, once the modified elements return to the original position.1
74As-Built drawings1
SECTION 22 00 00
75Copper piping and accesories11
76Polyethylene piping and accesories11
77Valves1
78Hose bibb and hose connection vacuum breaker1
79Transition fitting for polyethylene/ cooper1
80Irrigation system materials1
SECTION 23 00 00
81Air distribution system cleaning/ disinfection company1
82Cleaning report1
83Testing of air conditioning systems duct1
SECTION 26 20 00
84RMC Conduit and fittings (1 of each size)1
85EMT Conduit and fittings (1 of each size)1
86FMC Conduit and fittings (1 of each size)1
87Rigid polycarbonate conduit1
88Surface Metal Raceway and fittings (all sizes)1
89Flexible Non-Metallic Conduit and fittings (1 of each size)1
90Junction and pull boxes1
91Outlet boxes and covers1
92Wires and cables1
93Splices and Termination Components1
94Circuit breakers1
95Device Plates1
96Receptacles (one of each type)1
97Switches and Key Switches (one of each type)1
98Labels1
99Existing Drawings1
100As-built Drawings1
101Devices Subject to Manual Operation1Prior to FI
102Wiring test1Prior to FI
103Resistance ground test1Prior to FI
104Single line diagram of the “as-built” building electrical system1FI-15
105Active electrical equipment1FI-15
106Grounding bar and supports1
SECTION 26 53 00.00 40
107Exit Lighting Fixtures1
108Steel rod guards11
109Operational test1
110Energy efficiencies1
111O&M Manuals11
SECTION 26 56 00
112LED Luminaires1
113Photocell1
114Operational test1
115Luminaire Useful Life Certificate1
116O&M Manuals11
SECTION 28 10 05
117Cable1
118Installer Qualifications1
119Shop drawings of temporary installation for cameras installed in shelter1
120If required, new additional material1
SECTION 28 31 74.00 20
121Existing Drawings1
122Point-to-Point Wiring Diagrams1
123Wiring1
124Conduits, junction and pull boxes, outlet boxes and covers1
125Manual pull stations
126Visible appliances
127Steel rod guards11
128Qualifications of Installer1
129Record of Completion1
130Preliminary testing1
131Final acceptance testing1
132As-Built Drawings of Fire Alarm System1Prior to FI
SECTION 31 23 00 00 20
133Backfill11
134Cleaning concrete11
SECTION 31 23 00 00 20
135Concrete11
136Electrowelded mesh11

&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N

MSS Spanish

RESUMEN MUESTRAS DE MATERIALNÚMERO PROYECTO:
QUUG 13-1012TÍTULO DE PROYECTO:
REPARAR FILTRACIONES DE AGUA DESDE EL EXTERIOR EN EL GIMNASIOSOLICITACIÓN / CONTRATO NO.
(A cumplimentar por el ingeniero del proyecto)(A cumplimentar por administrador del contrato)
NUMBER OF COPIES REQUIRED
LÍNEA NÚMEROPARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓNCERTIFICADO DE CUMPLIMIENTOPLANOS DE TALLERMUESTRASSELECCIÓN DE COLORRECOMENDACIONES DEL FABRICANTEGARANTÍA DEL FABRICANTEDATOS DE CATÁLOGOINSTRUCCIONES DE FUNCIONAMIENTOPROGRAMAS, LISTADOS, INFORMES, PLANESDATOS TÉCNICOSPRUEBASINFORMES DE TRABAJOS DE CAMPOFECHA DE ENTREGA

fergusog: Enter the due date from the Contractor (MM/DD/YY)

FECHA RECEPCIÓN EN CONTRATACIÓN

fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

FECHA LÍMITE DE DEVOLUCIÓN

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

NÚMERO DE MUESTRA

fergusog: Enter the Submittal Number

FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA

fergusog: Enter Resubmittal Number

APROBACIÓN FINAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

OBSERVACIONES

fergusog: Enter any comments pertaining to the submittal

APROBADO

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DESAPROBADO

fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECCIÓN 01 11 00
1Programa de obra1NTP+5
2Plan de obra1NTP+5
3Plan de Cortes de Suministro1Comienzo de cada fase - 15
SECCIÓN 01 11 01
4Programa de avance de obras1NTP+5
5Plan de movilización1NTP+5
6Plan de control de calidad1NTP+10
7Gestión de residuos y escombros1Antes de la Inspección final
8Planos As-Builts1Antes de la Inspección final
9Cartel de Obra1NTP+15
10Datos espaciales1Antes de la Inspección final
11Personal clave1NTP+15
12Plan de seguridad1Antes de cualquier trabajo
13Carta de garantía1Antes de la Inspección final
14Manuales de Operación y Mantenimiento1Antes de la Inspección final
SECCIÓN 02 41 10
15Programa y plan de las obras1
16Plan de demolición1
17Plan de gestión y eliminación de residuos1
18Gestor de residuos1
19Vertedero autorizado o planta de tratamiento y valorización de residuos1
20Depósitos de residuos1
SECTION 03 45 00
21Elementos de hormigón prefabricado11
22Elementos de fundición embebidos y conectores11
23Elementos de unión1
24Juntas1
25Acabado superficial de panel prefabricado empleado en muros1
26Cálculos de diseño1
27Diseño de mezcla de hormigón1
28Diseño de la mezcla de hormigón de reparación o para defectos superficiales1
29Ensayo de resistencia1
30Retracción1
31Contenido en aire1
32Componentes del Hormigón1
33Agua1
34Ensayo de resistencia de unidades prefabricadas1
35Certificados de calidad del fabricante1
36Instalación1
37Limpieza1
SECCIÓN 04 20 00
38Ladrillos huecos, ladrillos para fábrica y bloques cerámicos11
39SECCIÓN 05 12 00
40Plano de montaje1
41Procedimiento y culaificaciones para soldadura1
42Certificado proceso de soldadura
43Plan de control de calidad y y ensayo
44Resultados de los ensayos
45Diseños y cálculos
SECCIÓN 06 20 00
46Paneles fenólicos11111
SECTION 07 13 53
47Lámina elastomérica impermeabilizante1111
48Imprimaciones adhesivos y resinas111
SECTION 07 42 13
49Cualificación del fabricante1
50Cualificación del instalador1
51Cualificación de soldadores1
52Panel sandwich metálico.1111111
54Planos de taller1
SECCIÓN 07 92 00
55Sellantes, imprimación y desencofrantes1
SECTION 08 81 00
56Vidrios11111
57Materiales de colocación y sellado1
SECTION 08 51 13
58Ventanas completas11111
59Elementos, fijaciones, rendimiento, aislamiento térmico, parteluces, pernos limpiacristales, pantallas, accesorios.11
60Adhesivos1
61Rendimiento térmico1
62Análisis de diseño y cálculos1
63Motores eléctricos de ventanas1
64Transformadires para motores eléctricos de ventanas1
SECCIÓN 09 90 00
65Recubrimiento y/o producto suministrado1
66Medición de espesor de revestimiento intumescente R90
SECCIÓN 21 13 13
67Tuberías y accesorios11
68Soporte y colgadores de tubería1
69Cualificaciones del instalador1
70Inspección1
71Cálculo hidráulico de las modificaciones temporales y condición final1
72Planos de modificación temporal de conexión del Departamento de Bomberos y Alarma de rociadores1
73Planos de condición final, una vez los elementos modificados vuelvan a su posición original1
74Planos As-Built1
SECCIÓN 22 00 00
75Tubos de cobre y accesorios11
76Tubos de polietileno y accesorios11
77Válvulas1
78Grifo para manguera y rompedor de vacío1
79Manguito de transición cobre/polietileno1
80Materiales para el sistema de riego1
SECCIÓN 23 00 00
81Empresa de limpieza/desinfección del sistema de distribución de aire1
82Informe de limpieza1
83Ensayo de conductos del sistema de aire acondicionado1
SECCIÓN 26 20 00
84Tubo RMC y accesorios (1 x cada diámetro)1
85Tubo EMT y accesorios (1 x cada diámetro)1
86Tubo FMC y accesorios (1 x cada diámetro)1
87Tubo rígido de policarbonato
88Canaleta Metálica de Superficie y acc. (todos tamaños)1
89Tubo flexible no metálico y accesorios (1 x cada diámetro)1
90Cajas de conexión y paso1
91Cajas para mecanismos y tapas1
92Conductores y cables1
93Empalmes y terminales1
94Interruptores magnetotérmicos1
95Placas de mecanismos1
96Enchufes (uno de cada tipo)1
97Interruptores e interruptores de llave (uno de cada tipo)1
98Etiquetas1
99Planos Existentes1
100Planos As-Built1
101Dispositivos sujetos a operación manual1Antes de la Inspección final
102Pruebas de resistencia de aislamiento de la instalación1Antes de la Inspección final
103Pruebas de resistencia puesta a tierra1Antes de la Inspección final
104Esquema unifilar del sistema eléctrico del edificio tal como se ha instalado en obra1IF-15
105Equipo eléctrico activo1IF-15
106Barra de puesta a tierra y soportes11
SECTION 26 53 00.00 40
107Luminarias de salida1
108Rejillas de protección de acero11
109Ensayo de operación1
110Eficiencia energética1
111O&M Manuales11
SECTION 26 56 00
112Luminarias LED1
113Fotocélula1
114Ensayo operacional1
115Certificado de vida útil de la luminaria1
116O&M Manuales11
SECTION 28 10 05
117Cable1
118Cualificación del instalador1
119Planos de instalación provisional para cámaras de carpa1
120Si es necesario, nuevo material adicional1
SECCIÓN 28 31 74.00 20
121Planos Existentes1Antes de realizar ninguna modificación
122Esquema de Cableado Punto a Punto1
123Cableado1
124Conductos, cjas de emplame y tendido, cajas para elementos y tapas1
125Pulsadores manuales
126Dispositivos visibles
127Rejillas de protección de acero
128Cualificaciones del Instalador1
129Boletín de Instalación1
130Ensayo preliminar1
131Ensayo final de aceptación1
132Planos As-Built del Sistema de Alarma Contra-incendios1Antes de la Inspección final
SECTION 31 23 00 00 20
133Material de relleno11
134Hormigón de limpieza11
SECTION 31 23 00 00 20
135Hormigón11
136Malla electrosoldada11

&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP) Página &P de &N

File details come from the government source that posted it. Updated .