13-1012_Construction_Cost_Estimate_Breakdown_Ktor.xlsx
XLSX spreadsheet 48 KB Posted
- Attached to
- Gym Water Seepage Federal contract opportunity
- Solicitation number
- FA5575-17-B-0004
About this file
Blank CCE
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Requirement_Clarifications.pdf | ||
| Amendment_2.pdf | ||
| Amendment_1.pdf | ||
| QUUG_13-1012_SCHEDULE_OF_MATERIAL_SUBMITTALS_SP-EN.xlsx | XLSX spreadsheet | |
| QUUG_13-1012_SPECIFICATIONS_100_(es).pdf | ||
| QUUG_13-1012_DRAWINGS_100_.pdf | ||
| FA5575-17-B-0004.pdf | ||
| QUUG_13-1012_SPECIFICATIONS_100_(en).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Basic Gorv
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| REPAIR GYM WATER SEEPAGE THROUGH EXTERIOR (Bldg 312) | BASIC BID | |||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 13-1012 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| 1. ARQUITECTURA | ||||||||||
| 1. ARCHITECTURE | ||||||||||
| 1.01 Demolición | ||||||||||
| 1.01 Demolition | ||||||||||
| 1 | Demoler cerramientos norte y sur, incluyendo sistema de apuntalamiento como se requiera para la estructura existente y reparación de la cimentación y demolición | |||||||||
| Demolish south and north exterior walls, including temporary underpinning system as required by existing structure and foundations repair and demolition | m2 | |||||||||
| 2 | Desmontar puertas exist. cerramientos para ser reut. | |||||||||
| Dismount existing exterior doors to be reused | Ea | |||||||||
| 3 | Demoler ventanas | |||||||||
| Demolish windows | m2 | |||||||||
| 1.02 Nueva instalación | ||||||||||
| 1.02 New facility | ||||||||||
| 4 | Excavación y movimiento de tierras | |||||||||
| Excavation and digging | m3 | |||||||||
| 5 | Insertar rellleno para compactar | |||||||||
| Insert fill to be compacted | m3 | |||||||||
| 6 | Hormigón de nivelación | |||||||||
| Leveling concrete | m3 | |||||||||
| 7 | Pared de fábrica de ladrillo | |||||||||
| Brick masonry wall | m2 | |||||||||
| 8 | Nueva cimentación para cerramientos | |||||||||
| New wall foundation | m2 | |||||||||
| 9 | Pilares de ladrillo | |||||||||
| Brick pillars | m3 | |||||||||
| 10 | Encofrado perdido | |||||||||
| Permanent formwork | Ea | |||||||||
| 11 | Junta expansión entre nuevo zuncho y existente. 50mm | |||||||||
| Expan. joint between new & existing founda. 50mm | m2 |
| 12 | Junta elastomérica | |
| Elastomeric joint | Lm | |
| 13 | Paneles prefabricados de hormigon reforzado. 150mm | |
| Reinforced prefabricated concrete panel. 150 mm. | m2 | |
| 14 | Juntas metálicas para conectar los paneles prefabricados y la estructura metálica. | |
| Metal joints connecting the prefaricated concrete panels and metal structure. | Lm | |
| 15 | Estructura secundaria y estructura ausiliar (S275JR) | |
| Secondary structure and auxiliary structure (S275JR) | kg | |
| 16 | Panel sandwich. Espesor: 50mm | |
| Sandwich panel. Thickness: 50 mm. | m2 | |
| 17 | Juntas del panel sandwcih | |
| Sandwich metal panel joints | Lm | |
| 18 | Aislamiento térmico | |
| Thermal insulation | m2 | |
| 19 | Paneles fenolicos y est. auxiliar para panales fenolicos | |
| Laminated fenolic panels & aux. struc. fenolic sheets | m2 | |
| 20 | Ventanas motorizadas | |
| Motorized operable windows | m2 | |
| 21 | Malla protect. PRFV ventanas, incluyendo acce. fijación | |
| PRFV protection mesh for windows, including fittings | m2 | |
| 22 | Limpiar, pintar y reinstalar puertas exteriores | |
| Clean, paint and reinstall exterior doors | Ea | |
| 23 | Sist impermeabi. entre cubierta sala de pesas y gimna | |
| Waterproofing syst between weight room's roof & gym | Ea | |
| 24 | Reparar grietas, aplicar mortero reparación, quitar pintura y revestimiento cerramientos que permanezcan | |
| Repair cracks, apply repair mortar and remove paint and finish pargeting from the enclosure to remain | m2 | |
| 25 | Canalón | |
| Spout | Lm | |
| 26 | Pintura para paredes verticales | |
| Vertical wall faces paint | m2 | |
| Total Arquitectura | ||
| Architecture Total | ||
| 2. TRATAMIENTOS DE LA ESTRUCTURA | ||
| 2. STRUCTURE TREATMENT | ||
| 27 | Tratamiento a toda la superficie de la estructura existente (pilares, vigas, correas y cerchas) | |
| Structure surface treatmet for existing structure (pillars, beams, purlins and roof trusses) | m2 | |
| 28 | Pintura dos componentes estructura principal existente | |
| Two component paint for main existing structure | m2 | |
| 29 | Pintura dos componentes estruc. secundaria y auxiliar | |
| 2 component paint secondary & auxiliary structure | m2 | |
| Total Estructura | ||
| Structure Total | ||
| 3. PROTECCIÓN CONTRA INCENDIOS | ||
| 3. FIRE PROTECTION | ||
| 3.01 Demolición | ||
| 3.01 Demolition | ||
| 30 | Demolicion del sistema existente | |
| Demolition of existing system | Job | |
| 3.02 Nuevo sistema | ||
| 3.02 New systems | ||
| 31 | Pintura intumescente R90, incluso imprimación, estructura existente, secundaria y auxiliar | |
| Intumescent paint R90, including primer, for existing, secondary and auxiliary structure | m2 | |
| 32 | Canalización acero 25mm, incl. cajas y accesorios | |
| 25mm steel galvanized conduit, incl.g boxes & acce. | Lm | |
| 33 | Cable de cobre 1x2.5 mm2 H07Z1-K 450/750V | |
| Copper cable 1x2.5 mm2 H07Z1-K 450/750V | Lm | |
| 34 | Modulo sincronismo alarma CI incl. cajas, sop. y acce. | |
| Synchronizing module incl. boxes, supp. & acce. | Ea | |
| 35 | Pulsadores manuales, incl. cajas, soportes y accesorios | |
| Manual station including boxes, supports & accessories | Ea |
| 36 | Audiovisuales alarma incendios, cajas, soportes y acce. | |
| Audiovisual fire alarm incl. boxes, supports & acce. | Ea | |
| 37 | Rejillas protectoras acero pulsadores manuales | |
| Steel rod cage guard for manual station | Ea | |
| 38 | Rejillas protectoras acero elementos audiovisuales | |
| Steel rod cage guard for audiovisual fire alarm | Ea | |
| 39 | Modificación temporal sistema de alarma exist, incluyendo todos los trabajos y accesorios | |
| Temporary modification of existing fire alarm system, including jobs and accesories. | Ea | |
| 40 | Reconexión nuevos elementos al sistema de alarma existente, incluyendo todos los trabajos y accesorios | |
| Reconection of new fire alarma devices to the existing fire alarm system, including jobs and accesories | Ea | |
| Total protección contra incendios | ||
| Fire protection Total | ||
| 4. SISTEMA DE SUPRESIÓN DE INCENDIOS | ||
| 4. FIRE SUPRESSION SYSTEM | ||
| 41 | Modificación temportal de la instalación existente, incluyendo la reinstalación al estado original: Conexión Dpto. bomberos; Alarma sist.de rociadores | |
| Temporary modification of existing facilities, including reinstalation to the original condition: Fire Department Connection; Sprinkler Fire Alarm | Ea | |
| Total Sistema supresion de incendios | ||
| Fire supression system Total | ||
| 5. FONTANERÍA Y SANEAMIENTO | ||
| 5. PLUMBING AND SEWAGE SYSTEM | ||
| 5.01 Demolición | ||
| 5.01 Demolition | ||
| 42 | Demolición del sistema existente | |
| Demolition of existing system | Job |
| 5.02 Nueva Instalación | ||
| 5.02 New Facilities | ||
| 43 | Tubería de agua, incluyendo accesorios y aislamiento | |
| Water pipe, including accesories and insulation | Lm | |
| 44 | Grifo exterior | |
| Exterior faucet | Ea | |
| 45 | Tratamiento quimico del agua | |
| Chemical water treatment | Job | |
| Total fontanería y saneamiento | ||
| Plumbing and sewage Total | ||
| 6. HVAC | ||
| 6. HVAC | ||
| 6.01 Demolición | ||
| 6.01 Demolition | ||
| 46 | Demolición del sistema existente | |
| Demolition of existing system | Job | |
| 6.02 Nueva Instalación | ||
| 6.02 New Facilities | ||
| 47 | Reinstal. conductos aire y soportes, incl. pintura y acc. | |
| Reinstall air ducts & supports, including paint & acce. | Lm | |
| 48 | Limpieza inteior de los conductos | |
| Interior ductwork cleaning | Job | |
| HVAC Total | ||
| HVAC Total | ||
| 7. ELECTRICIDAD | ||
| 7. ELECTRICAL | ||
| 7.01 Demolición | ||
| 7.01 Demolition | ||
| 49 | Demolición del sistema existente | |
| Demolition of existing system | Job |
| 7.02 Nueva Instalación | ||
| 7.02 New Facilities | ||
| 50 | Canalización acero 25mm, cajas, empalmes y acce. | |
| 25mm steel galv. conduit, boxes, couplings, & acce. | Lm | |
| 51 | Cable de cobre 1x4 mm2 H07Z1-K 450/750V | |
| Copper cable 1x4 mm2 H07Z1-K 450/750V | Lm | |
| 52 | Iluminación exterior (Luminarias de pared) | |
| Exterior Ligthing (Wall Luminaires) | Ea | |
| 53 | Iluminación exterior (Luminarias de techo) | |
| Exterior Ligthing (Ceiling Luminaires) | Ea | |
| 54 | Tomas de corriente NEMA 5-20R, cajas y accesorios | |
| Receptacles NEMA 5-20R, boxes and accessories | Ea | |
| 55 | Tomas de corriente NEMA 6-20R, cajas y accesorios | |
| Receptacles NEMA 6-20R, boxes and accessories | Ea | |
| 56 | Rejilla protectora acero iluminacion emergencia | |
| Steel rod cage guard for emergency ligthing | Ea | |
| 57 | Rejilla protectora de acero para señales de salida | |
| Steel rod cage guard for exit signs | Ea | |
| 58 | Etiquetado panel eléctrico | |
| Electrical panelboards re-labelling | Ea | |
| 59 | Estación completa control ventanas motorizadas | |
| Electrical motor windows completa control station. | Ea | |
| 60 | Sistema puesta tierra: cobre desnudo 25mm2, HS07Z1-K 25mm2, dold. exotérmica, cajas, tubos de pvc, empalmes y acce | |
| Grounding system: cooper bar 25mm2, HS07Z1-K 25mm2, exotermic welding, boxes, pvc conduit, coupligs and accesories | Ea | |
| 61 | Sistema puesta a tierra: pica de cobre L=3m, Ø20mm | |
| Grounding system: cooper rod L=3m, Ø20mm | Ea | |
| Total electricidad | ||
| Electrical Total |
| 8. CCTV & SSTEMA DE CONTROL DE ACCESO | ||
| 8. CCTV & ACCESS CONTROL SYSTEM | ||
| 8.01 Demolición | ||
| 8.01 Demolition | ||
| 62 | Demolición del sistema existente | |
| Demolition of existing system | Job | |
| 8.01 Instalación Temporal | ||
| 8.01 Temporary installation | ||
| 63 | Modificación temporal de la instalación del sistema de seguridad, incluyendo cables y todos los elementos necesarios para un correcto funcionamiento del sistema | |
| Temporary modifications of security system installation, including cables and all necessary elements for the proper operationg of the system | Ea | |
| 8.02 Nueva Instalación | ||
| 8.02 New Facilities | ||
| 64 | Canalizacion de acero 25mm, incluyendo cajas, empalmes, soportes y accesorios | |
| 25mm steel galvanized conduit, including boxes, couplings, supports p.p & accessories | Lm | |
| 65 | Reinstalación de las cámaras, conexión y puesta en marcha del sistema CCTV, incluyendo accesorios y elementos necesarios | |
| Re-installation of cameras, connection and System start-up of CCTV system, including accesories and all necesaries elements | Job | |
| 66 | Reinstalación de los interruptores de las puertas, conexión y puesta en marcha del sistema, incluyendo accesorios y elementos necesarios | |
| Re-installation of doors detectors, connection and System start-up of access system, including accesories and all necesaries elements | Job | |
| Total CCTV& Sistema de control de acceso | ||
| CCTV & Access control system Total | ||
| 9. PAISAJISMO | ||
| 9. LANDSCAPING | ||
| 9.02 Demolición | ||
| 9.01 Demolition | ||
| 67 | Limpieza de la vegetación | |
| Clearance of vegetation | Job |
| 9.02 Nueva Instalación | ||
| 9.02 New Facilities | ||
| 68 | Excavación y movimiento de tierras | |
| Excavation and digging | m3 | |
| 69 | Nuevo pavimento exterior de hormigón | |
| New outdoor concrete pavement | m2 | |
| 70 | Reparar/reconstruir pavimento exterior hormigón exist. | |
| Repair/rebuild existing outdoor concrete pavement | m2 | |
| 71 | Mejora del terreno | |
| Soil improvement | m3 | |
| 72 | Sistema de riego | |
| Irrigation system | Lm | |
| 73 | Reubicar las plantas existentes | |
| Relocate existing plants | Job | |
| 74 | Siembra de césped en las zonas afectadas por la obra | |
| Grass seeding in affected areas for the construction | m2 | |
| Total Paisajismo | ||
| Landscaping Total | ||
| 10. RESIDUOS | ||
| 10. WASTE | ||
| 75 | Material inerte | |
| Inert material | Ea | |
| 76 | Reciclable | |
| Recyclable | Ea | |
| 77 | Materiales mezclados | |
| Mixed materials | Ea | |
| 78 | Residuos peligrosos | |
| Hazardous waste | Ea | |
| 79 | Materiales variados | |
| Various materials | Ea | |
| Total residuos | ||
| Waste Total |
| 11. VARIOS | ||
| 11. MISCELANEOUS | ||
| 80 | Protección PDF para suelo existente | |
| MDF protection for existing floor | m2 | |
| 81 | Protección de polietileno para suelo existente | |
| Protection of polyethylene for existing floor | m2 | |
| 82 | Traslado y manipulación del equipamiento y mobiliario | |
| Removal and handling equipment and furniture | Ea | |
| 83 | Protección auxiliar para elementos | |
| Auxiliary protection elements | Ea | |
| 84 | Limpieza Final | |
| Final Clearance | Job | |
| Total varios | ||
| Miscelaneous Total | ||
| RESUMEN | ||
| SUMMARY | ||
| 1. ARQUITECTURA | ||
| 1. ARCHITECTURE | ||
| 2. TRATAMIENTO DE LA ESTRUCTURA | ||
| 2. STRUCTURE TREATMENT | ||
| 3. PROTECCIÓN CONTRA INCENDIOS | ||
| 3. FIRE PROTECTION | ||
| 4. SISTEMA DE SUPRESIÓN DE INCENDIOS | ||
| 4. FIRE SUPRESSION | ||
| 5. FONTANERÍA Y SANEAMIENTO | ||
| 5. PLUMBING AND SEWAGE SYSTEM | ||
| 6. HVAC | ||
| 6. HVAC | ||
| 7. ELECTRICIDAD | ||
| 7.ELECTRICITY | ||
| 8. CCTV & SISTEMA DE CONTROL DE ACCESO | ||
| 8. CCTV & ACCESS CONTROL SYSTEM |
| 9. PAISAJISMO |
| 9. LANDSCAPING |
| 10. RESIDUOS |
| 10. WASTE |
| 11. VARIOS |
| 11. MISCELANEOUS |
| GRAND TOTAL |
| GRAN TOTAL |
TOTAL MATERIAL COSTS
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD
SUBTOTAL
PROFIT
TOTAL PROJECT EUROS
DATE: FIRM NAME:
TITLE: BY:
&"Times New Roman,Normal"Page &P of &N
Option#1
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| REPAIR GYM WATER SEEPAGE THROUGH EXTERIOR (Bldg 312) | OPTION#1 | |||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 13-1012 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| ARCHITECTURE | ||||||||||
| ARQUITECTURA | ||||||||||
| Estructura | ||||||||||
| Structure | ||||||||||
| 1 | Refuerzo y reemplazamiento de estructura: pilares, placas de anclaje, uniones y otros elementos. Incluso refuerzos temporales y cálculos de nuevos elementos. | |||||||||
| Structure reinforce and replaicement: pillars, anchorage plates, joints and ohter elements. Inluding temporary & auxiliary resources and calculations for new elements. | Ea | |||||||||
| Total esructura | ||||||||||
| Structure Total |
| ARCHITECTURE SUMMARY |
| RESUMEN TRABAJOS DE ARQUITECTURA |
| Estructura |
| Structure |
| TOTAL ARCHITECTURAL WORK |
| TOTAL TRABAJOS DE ARQUITECTURA |
| SUMMARY |
| RESUMEN |
| TOTAL ARCHITECTURAL WORK |
| TOTAL TRABAJOS DE ARQUITECTURA |
| GRAND TOTAL |
| GRAN TOTAL |
TOTAL MATERIAL COSTS
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD
SUBTOTAL
PROFIT
TOTAL PROJECT EUROS
DATE: FIRM NAME:
TITLE: BY:
Summary
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| REPAIR GYM WATER SEEPAGE THROUGH EXTERIOR (Bldg 312) | SUMMARY | |||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 13-1012 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| SUMMARY |
| RESUMEN |
| TOTAL BASIC BID |
| TOTAL OFERTA BASICA |
| TOTAL OPTION#1 |
| TOTAL OPCION No1 |
| GRAND TOTAL |
| GRAN TOTAL |
| ` | |
| TOTAL MATERIAL COSTS |
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD
SUBTOTAL
PROFIT
TOTAL PROJECT EUROS
DATE: FIRM NAME:
TITLE: BY: