13-1012_Construction_Cost_Estimate_Breakdown_Ktor.xlsx

XLSX spreadsheet 48 KB Posted

Attached to
Gym Water Seepage Federal contract opportunity
Solicitation number
FA5575-17-B-0004
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

Blank CCE

View the file

Other files for this federal contract opportunity

Other files attached to Gym Water Seepage, newest first.
File Type Posted
Requirement_Clarifications.pdf PDF
Amendment_2.pdf PDF
Amendment_1.pdf PDF
QUUG_13-1012_SCHEDULE_OF_MATERIAL_SUBMITTALS_SP-EN.xlsx XLSX spreadsheet
QUUG_13-1012_SPECIFICATIONS_100_(es).pdf PDF
QUUG_13-1012_DRAWINGS_100_.pdf PDF
FA5575-17-B-0004.pdf PDF
QUUG_13-1012_SPECIFICATIONS_100_(en).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Basic Gorv

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
REPAIR GYM WATER SEEPAGE THROUGH EXTERIOR (Bldg 312)BASIC BID
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 13-1012MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
1. ARQUITECTURA
1. ARCHITECTURE
1.01 Demolición
1.01 Demolition
1Demoler cerramientos norte y sur, incluyendo sistema de apuntalamiento como se requiera para la estructura existente y reparación de la cimentación y demolición
Demolish south and north exterior walls, including temporary underpinning system as required by existing structure and foundations repair and demolitionm2
2Desmontar puertas exist. cerramientos para ser reut.
Dismount existing exterior doors to be reusedEa
3Demoler ventanas
Demolish windowsm2
1.02 Nueva instalación
1.02 New facility
4Excavación y movimiento de tierras
Excavation and diggingm3
5Insertar rellleno para compactar
Insert fill to be compactedm3
6Hormigón de nivelación
Leveling concretem3
7Pared de fábrica de ladrillo
Brick masonry wallm2
8Nueva cimentación para cerramientos
New wall foundationm2
9Pilares de ladrillo
Brick pillarsm3
10Encofrado perdido
Permanent formworkEa
11Junta expansión entre nuevo zuncho y existente. 50mm
Expan. joint between new & existing founda. 50mmm2
12Junta elastomérica
Elastomeric jointLm
13Paneles prefabricados de hormigon reforzado. 150mm
Reinforced prefabricated concrete panel. 150 mm.m2
14Juntas metálicas para conectar los paneles prefabricados y la estructura metálica.
Metal joints connecting the prefaricated concrete panels and metal structure.Lm
15Estructura secundaria y estructura ausiliar (S275JR)
Secondary structure and auxiliary structure (S275JR)kg
16Panel sandwich. Espesor: 50mm
Sandwich panel. Thickness: 50 mm.m2
17Juntas del panel sandwcih
Sandwich metal panel jointsLm
18Aislamiento térmico
Thermal insulationm2
19Paneles fenolicos y est. auxiliar para panales fenolicos
Laminated fenolic panels & aux. struc. fenolic sheetsm2
20Ventanas motorizadas
Motorized operable windowsm2
21Malla protect. PRFV ventanas, incluyendo acce. fijación
PRFV protection mesh for windows, including fittingsm2
22Limpiar, pintar y reinstalar puertas exteriores
Clean, paint and reinstall exterior doorsEa
23Sist impermeabi. entre cubierta sala de pesas y gimna
Waterproofing syst between weight room's roof & gymEa
24Reparar grietas, aplicar mortero reparación, quitar pintura y revestimiento cerramientos que permanezcan
Repair cracks, apply repair mortar and remove paint and finish pargeting from the enclosure to remainm2
25Canalón
SpoutLm
26Pintura para paredes verticales
Vertical wall faces paintm2
Total Arquitectura
Architecture Total
2. TRATAMIENTOS DE LA ESTRUCTURA
2. STRUCTURE TREATMENT
27Tratamiento a toda la superficie de la estructura existente (pilares, vigas, correas y cerchas)
Structure surface treatmet for existing structure (pillars, beams, purlins and roof trusses)m2
28Pintura dos componentes estructura principal existente
Two component paint for main existing structurem2
29Pintura dos componentes estruc. secundaria y auxiliar
2 component paint secondary & auxiliary structurem2
Total Estructura
Structure Total
3. PROTECCIÓN CONTRA INCENDIOS
3. FIRE PROTECTION
3.01 Demolición
3.01 Demolition
30Demolicion del sistema existente
Demolition of existing systemJob
3.02 Nuevo sistema
3.02 New systems
31Pintura intumescente R90, incluso imprimación, estructura existente, secundaria y auxiliar
Intumescent paint R90, including primer, for existing, secondary and auxiliary structurem2
32Canalización acero 25mm, incl. cajas y accesorios
25mm steel galvanized conduit, incl.g boxes & acce.Lm
33Cable de cobre 1x2.5 mm2 H07Z1-K 450/750V
Copper cable 1x2.5 mm2 H07Z1-K 450/750VLm
34Modulo sincronismo alarma CI incl. cajas, sop. y acce.
Synchronizing module incl. boxes, supp. & acce.Ea
35Pulsadores manuales, incl. cajas, soportes y accesorios
Manual station including boxes, supports & accessoriesEa
36Audiovisuales alarma incendios, cajas, soportes y acce.
Audiovisual fire alarm incl. boxes, supports & acce.Ea
37Rejillas protectoras acero pulsadores manuales
Steel rod cage guard for manual stationEa
38Rejillas protectoras acero elementos audiovisuales
Steel rod cage guard for audiovisual fire alarmEa
39Modificación temporal sistema de alarma exist, incluyendo todos los trabajos y accesorios
Temporary modification of existing fire alarm system, including jobs and accesories.Ea
40Reconexión nuevos elementos al sistema de alarma existente, incluyendo todos los trabajos y accesorios
Reconection of new fire alarma devices to the existing fire alarm system, including jobs and accesoriesEa
Total protección contra incendios
Fire protection Total
4. SISTEMA DE SUPRESIÓN DE INCENDIOS
4. FIRE SUPRESSION SYSTEM
41Modificación temportal de la instalación existente, incluyendo la reinstalación al estado original: Conexión Dpto. bomberos; Alarma sist.de rociadores
Temporary modification of existing facilities, including reinstalation to the original condition: Fire Department Connection; Sprinkler Fire AlarmEa
Total Sistema supresion de incendios
Fire supression system Total
5. FONTANERÍA Y SANEAMIENTO
5. PLUMBING AND SEWAGE SYSTEM
5.01 Demolición
5.01 Demolition
42Demolición del sistema existente
Demolition of existing systemJob
5.02 Nueva Instalación
5.02 New Facilities
43Tubería de agua, incluyendo accesorios y aislamiento
Water pipe, including accesories and insulationLm
44Grifo exterior
Exterior faucetEa
45Tratamiento quimico del agua
Chemical water treatmentJob
Total fontanería y saneamiento
Plumbing and sewage Total
6. HVAC
6. HVAC
6.01 Demolición
6.01 Demolition
46Demolición del sistema existente
Demolition of existing systemJob
6.02 Nueva Instalación
6.02 New Facilities
47Reinstal. conductos aire y soportes, incl. pintura y acc.
Reinstall air ducts & supports, including paint & acce.Lm
48Limpieza inteior de los conductos
Interior ductwork cleaningJob
HVAC Total
HVAC Total
7. ELECTRICIDAD
7. ELECTRICAL
7.01 Demolición
7.01 Demolition
49Demolición del sistema existente
Demolition of existing systemJob
7.02 Nueva Instalación
7.02 New Facilities
50Canalización acero 25mm, cajas, empalmes y acce.
25mm steel galv. conduit, boxes, couplings, & acce.Lm
51Cable de cobre 1x4 mm2 H07Z1-K 450/750V
Copper cable 1x4 mm2 H07Z1-K 450/750VLm
52Iluminación exterior (Luminarias de pared)
Exterior Ligthing (Wall Luminaires)Ea
53Iluminación exterior (Luminarias de techo)
Exterior Ligthing (Ceiling Luminaires)Ea
54Tomas de corriente NEMA 5-20R, cajas y accesorios
Receptacles NEMA 5-20R, boxes and accessoriesEa
55Tomas de corriente NEMA 6-20R, cajas y accesorios
Receptacles NEMA 6-20R, boxes and accessoriesEa
56Rejilla protectora acero iluminacion emergencia
Steel rod cage guard for emergency ligthingEa
57Rejilla protectora de acero para señales de salida
Steel rod cage guard for exit signsEa
58Etiquetado panel eléctrico
Electrical panelboards re-labellingEa
59Estación completa control ventanas motorizadas
Electrical motor windows completa control station.Ea
60Sistema puesta tierra: cobre desnudo 25mm2, HS07Z1-K 25mm2, dold. exotérmica, cajas, tubos de pvc, empalmes y acce
Grounding system: cooper bar 25mm2, HS07Z1-K 25mm2, exotermic welding, boxes, pvc conduit, coupligs and accesoriesEa
61Sistema puesta a tierra: pica de cobre L=3m, Ø20mm
Grounding system: cooper rod L=3m, Ø20mmEa
Total electricidad
Electrical Total
8. CCTV & SSTEMA DE CONTROL DE ACCESO
8. CCTV & ACCESS CONTROL SYSTEM
8.01 Demolición
8.01 Demolition
62Demolición del sistema existente
Demolition of existing systemJob
8.01 Instalación Temporal
8.01 Temporary installation
63Modificación temporal de la instalación del sistema de seguridad, incluyendo cables y todos los elementos necesarios para un correcto funcionamiento del sistema
Temporary modifications of security system installation, including cables and all necessary elements for the proper operationg of the systemEa
8.02 Nueva Instalación
8.02 New Facilities
64Canalizacion de acero 25mm, incluyendo cajas, empalmes, soportes y accesorios
25mm steel galvanized conduit, including boxes, couplings, supports p.p & accessoriesLm
65Reinstalación de las cámaras, conexión y puesta en marcha del sistema CCTV, incluyendo accesorios y elementos necesarios
Re-installation of cameras, connection and System start-up of CCTV system, including accesories and all necesaries elementsJob
66Reinstalación de los interruptores de las puertas, conexión y puesta en marcha del sistema, incluyendo accesorios y elementos necesarios
Re-installation of doors detectors, connection and System start-up of access system, including accesories and all necesaries elementsJob
Total CCTV& Sistema de control de acceso
CCTV & Access control system Total
9. PAISAJISMO
9. LANDSCAPING
9.02 Demolición
9.01 Demolition
67Limpieza de la vegetación
Clearance of vegetationJob
9.02 Nueva Instalación
9.02 New Facilities
68Excavación y movimiento de tierras
Excavation and diggingm3
69Nuevo pavimento exterior de hormigón
New outdoor concrete pavementm2
70Reparar/reconstruir pavimento exterior hormigón exist.
Repair/rebuild existing outdoor concrete pavementm2
71Mejora del terreno
Soil improvementm3
72Sistema de riego
Irrigation systemLm
73Reubicar las plantas existentes
Relocate existing plantsJob
74Siembra de césped en las zonas afectadas por la obra
Grass seeding in affected areas for the constructionm2
Total Paisajismo
Landscaping Total
10. RESIDUOS
10. WASTE
75Material inerte
Inert materialEa
76Reciclable
RecyclableEa
77Materiales mezclados
Mixed materialsEa
78Residuos peligrosos
Hazardous wasteEa
79Materiales variados
Various materialsEa
Total residuos
Waste Total
11. VARIOS
11. MISCELANEOUS
80Protección PDF para suelo existente
MDF protection for existing floorm2
81Protección de polietileno para suelo existente
Protection of polyethylene for existing floorm2
82Traslado y manipulación del equipamiento y mobiliario
Removal and handling equipment and furnitureEa
83Protección auxiliar para elementos
Auxiliary protection elementsEa
84Limpieza Final
Final ClearanceJob
Total varios
Miscelaneous Total
RESUMEN
SUMMARY
1. ARQUITECTURA
1. ARCHITECTURE
2. TRATAMIENTO DE LA ESTRUCTURA
2. STRUCTURE TREATMENT
3. PROTECCIÓN CONTRA INCENDIOS
3. FIRE PROTECTION
4. SISTEMA DE SUPRESIÓN DE INCENDIOS
4. FIRE SUPRESSION
5. FONTANERÍA Y SANEAMIENTO
5. PLUMBING AND SEWAGE SYSTEM
6. HVAC
6. HVAC
7. ELECTRICIDAD
7.ELECTRICITY
8. CCTV & SISTEMA DE CONTROL DE ACCESO
8. CCTV & ACCESS CONTROL SYSTEM
9. PAISAJISMO
9. LANDSCAPING
10. RESIDUOS
10. WASTE
11. VARIOS
11. MISCELANEOUS
GRAND TOTAL
GRAN TOTAL

TOTAL MATERIAL COSTS

TOTAL LABOR COSTS

TOTAL OTHER DIRECT COSTS

TOTAL DIRECT COSTS

OVERHEAD

SUBTOTAL

PROFIT

TOTAL PROJECT EUROS

DATE: FIRM NAME:

TITLE: BY:

&"Times New Roman,Normal"Page &P of &N

Option#1

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
REPAIR GYM WATER SEEPAGE THROUGH EXTERIOR (Bldg 312)OPTION#1
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 13-1012MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
ARCHITECTURE
ARQUITECTURA
Estructura
Structure
1Refuerzo y reemplazamiento de estructura: pilares, placas de anclaje, uniones y otros elementos. Incluso refuerzos temporales y cálculos de nuevos elementos.
Structure reinforce and replaicement: pillars, anchorage plates, joints and ohter elements. Inluding temporary & auxiliary resources and calculations for new elements.Ea
Total esructura
Structure Total
ARCHITECTURE SUMMARY
RESUMEN TRABAJOS DE ARQUITECTURA
Estructura
Structure
TOTAL ARCHITECTURAL WORK
TOTAL TRABAJOS DE ARQUITECTURA
SUMMARY
RESUMEN
TOTAL ARCHITECTURAL WORK
TOTAL TRABAJOS DE ARQUITECTURA
GRAND TOTAL
GRAN TOTAL

TOTAL MATERIAL COSTS

TOTAL LABOR COSTS

TOTAL OTHER DIRECT COSTS

TOTAL DIRECT COSTS

OVERHEAD

SUBTOTAL

PROFIT

TOTAL PROJECT EUROS

DATE: FIRM NAME:

TITLE: BY:

Summary

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
REPAIR GYM WATER SEEPAGE THROUGH EXTERIOR (Bldg 312)SUMMARY
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 13-1012MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
SUMMARY
RESUMEN
TOTAL BASIC BID
TOTAL OFERTA BASICA
TOTAL OPTION#1
TOTAL OPCION No1
GRAND TOTAL
GRAN TOTAL
`
TOTAL MATERIAL COSTS

TOTAL LABOR COSTS

TOTAL OTHER DIRECT COSTS

TOTAL DIRECT COSTS

OVERHEAD

SUBTOTAL

PROFIT

TOTAL PROJECT EUROS

DATE: FIRM NAME:

TITLE: BY: