15-1011_Schedule_of_Material_Submittals.xlsx
XLSX spreadsheet 51 KB Posted
- Attached to
- Install Generator & ATS, Bldg #1301 Federal contract opportunity
- Solicitation number
- FA5575-16-B-0007
About this file
Submittal Schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA5575-16-B-0007-0001_Amend.pdf | ||
| QUUG_15-1011_Especificaciones_Espaol_(de_PROJECTS_tal_cual).pdf | ||
| 15-1011.pdf | ||
| QUUG_15-1011_English_Specifications.pdf | ||
| 15-1011_AF_3052_Ktor_OH_BREAKDOWN.xlsx | XLSX spreadsheet | |
| FA5575-16-B-0007.pdf | ||
| Synopsis_16B0007.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | ||
| QUUG 15-1011 | PROJECT TITLE |
INSTALL GENERATOR & ATS, BLDG 1301
SOLICITATION / CONTRACT NO.
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
fergusog: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
fergusog: Enter any comments pertaining to the submittal
APPROVED
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECTION 01 11 00 | ||||||||||
| 1 | Construction Schedule | 3 | NTP+5 | |||||||
| 2 | Work Plan | 3 | NTP+5 | |||||||
| SECTION 01 11 01 | ||||||||||
| 3 | Warranty letter | 3 | Prior to Final Inspection (FI) | |||||||
| 4 | Base utility connection request | 3 | NTP+15 | |||||||
| 5 | Progress Schedule | 3 | NTP+10 | |||||||
| 6 | Mobility Plan | 3 | NTP+15 | |||||||
| 7 | Project sign | 3 | NTP+15 | |||||||
| 8 | Quality Control Plan | 3 | NTP+15 | |||||||
| 9 | Environmental protection plan | 3 | NTP+15 | |||||||
| 10 | Waste & construction debris management certificate | 3 | Prior to FI | |||||||
| 11 | As-Built drawings | 3 | Prior to FI | |||||||
| 12 | Spatial Data | 3 | Prior to FI | |||||||
| 13 | Key Personnel | 3 | NTP+15 | |||||||
| 14 | Personel listing | 3 | NTP+15 | |||||||
| 15 | Health and safety program | 3 | NTP+15 | |||||||
| 16 | O&M Manuals | 3 | Prior to FI | |||||||
| SECTION 26 20 00 | ||||||||||
| 17 | RMC Conduit and fittings, 1 x type | 3 | ||||||||
| 18 | EMT Conduit and fittings, 1 x type | 3 | ||||||||
| 19 | FMC Conduit and fittings, 1 x type | 3 | ||||||||
| 20 | Surface Metal Raceway | 3 | ||||||||
| 21 | Weatherproof Metal Raceway | 3 | ||||||||
| 22 | Junction and pull boxes | 3 | ||||||||
| 23 | Wires and cables | 3 | ||||||||
| 24 | Circuit breakers | 3 | ||||||||
| 25 | Panelboards | 3 | ||||||||
| 26 | Surge Protective Device | 3 | ||||||||
| 27 | Device Plates | 3 | ||||||||
| 28 | Receptacles | 3 | ||||||||
| 29 | Toggle Switches | 3 | ||||||||
| 30 | Labels | 3 | ||||||||
| 31 | Panelboards | 3 | ||||||||
| 32 | One-line Diagram | 3 | ||||||||
| 33 | Devices subject to manual operation | 3 | Facility Acceptance -5 | |||||||
| 34 | 1000-Volt wiring test | 3 | Facility Acceptance -5 | |||||||
| 35 | Panelboards | 3 | ||||||||
| 36 | Single line diagram of the "as-built" | 3 | ||||||||
| 37 | Schematic diagram | 3 | ||||||||
| 38 | Active electrical equipment O&M Manuals | 3 | ||||||||
| SECTION 26 32 13.00 20 | ||||||||||
| 39 | Engine-generator set and auxiliary equipment | 3 | ||||||||
| 40 | Auxiliary systems | 3 | ||||||||
| 41 | Engine generator set data | 3 | ||||||||
| 42 | Engine generator set efficiencies | 3 | ||||||||
| 43 | Diesel engine data | 3 | ||||||||
| 44 | Generator and exciter data | 3 | ||||||||
| 45 | Auxiliary systems and equipment | 3 | ||||||||
| 46 | Capacity calculations for engine-generator set | 3 | ||||||||
| 47 | Calculations for brake mean effective pressure | 3 | ||||||||
| 48 | Torsional vibration stress analysis computations | 3 | ||||||||
| 49 | Capacity calculations for batteries | 3 | ||||||||
| 50 | Acceptance checks and tests | 3 | Before Functional Tests | |||||||
| 51 | Functional acceptance tests | 3 | Facility Acceptance -15 | |||||||
| 52 | Functional acceptance tests procedure | 3 | ||||||||
| 53 | Vibration isolation system certification | 3 | ||||||||
| 54 | Fuel system certification | 3 | ||||||||
| 55 | Start-up technician qualification resume | 3 | ||||||||
| 56 | Instructor's qualification resume | 3 | ||||||||
| 57 | Engine tests | 3 | Before shipment | |||||||
| 58 | Generator set routine tests | 3 | Before shipment | |||||||
| 59 | Generator set design tests | 3 | ||||||||
| 60 | Diesel engine-generator set | 3 | ||||||||
| 61 | Auxiliary systems and equipment | 3 | ||||||||
| 62 | Preliminary assembled O&M manuals | 3 | ||||||||
| 63 | Posted operating instructions | 3 | ||||||||
| 64 | Training plan | 3 | ||||||||
| SECTION 26 36 00.00 10 | ||||||||||
| 65 | Detail drawings | 3 | ||||||||
| 66 | Equipment | 3 | 3 | 3 | ||||||
| 67 | Installation | 3 | ||||||||
| 68 | Material | 3 | 3 | |||||||
| 69 | Testing | 3 | Facility Acceptance -7 | |||||||
| 70 | Switching equipment | 3 | ||||||||
| 71 | Switching equipment | 3 | ||||||||
| 72 | Instructions | 3 | ||||||||
| SECTION 26 51 00 | ||||||||||
| 73 | Fluorescent lighting fixtures | 3 | ||||||||
| 74 | Fluorescent lamps | 3 | ||||||||
| 75 | Fluorescent lamp electronica ballasts | 3 | ||||||||
| 76 | Emergency lighting equipment | 3 | ||||||||
| 77 | Fixture mounting hardware | 3 | ||||||||
| 78 | Operating Test | 3 | ||||||||
| 79 | Electronic ballast warranty | 3 | ||||||||
| SECTION 33 71 02.00 20 | ||||||||||
| 80 | Ground wires | 3 | ||||||||
| 81 | Grounding test/Bar wells | 3 | ||||||||
| 82 | Grounding Bars | 3 | ||||||||
| 83 | Ground rods | 3 | ||||||||
| 84 | Exothermic welding | 3 | 3 | |||||||
| 85 | Field acceptance checks and tests | 3 |
&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N
MSS Spanish
| RESUMEN MUESTRAS DE MATERIAL | NÚMERO PROYECTO: | |||
| QUUG 15-1011 | TÍTULO DE PROYECTO: | |||
| INSTALAR GRUPO ELECTRÓGENO Y CONMUTADOR AUTOMÁTICO, EDIF. 1301 | SOLICITACIÓN / CONTRATO NO. |
| (A cumplimentar por el ingeniero del proyecto) | (A cumplimentar por administrador del contrato) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LÍNEA NÚMERO | PARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓN | CERTIFICADO DE CUMPLIMIENTO | PLANOS DE TALLER | MUESTRAS | SELECCIÓN DE COLOR | RECOMENDACIONES DEL FABRICANTE | GARANTÍA DEL FABRICANTE | DATOS DE CATÁLOGO | INSTRUCCIONES DE FUNCIONAMIENTO | PROGRAMAS, LISTADOS, INFORMES, PLANES | DATOS TÉCNICOS | PRUEBAS | INFORMES DE TRABAJOS DE CAMPO | FECHA DE ENTREGA |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
FECHA RECEPCIÓN EN CONTRATACIÓN
fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
FECHA LÍMITE DE DEVOLUCIÓN
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
NÚMERO DE MUESTRA
fergusog: Enter the Submittal Number
FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA
fergusog: Enter Resubmittal Number
APROBACIÓN FINAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
OBSERVACIONES
fergusog: Enter any comments pertaining to the submittal
APROBADO
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DESAPROBADO
fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECCIÓN 01 11 00 | ||||||||||
| 1 | Cronograma de obra | 3 | NTP+5 | |||||||
| 2 | Plan de obra | 3 | NTP+5 | |||||||
| SECCIÓN 01 11 01 | ||||||||||
| 3 | Carta de garantía | 3 | Antes de Inspección final (IF) | |||||||
| 4 | Petición de conexión a servicios de la base | 3 | NTP+15 | |||||||
| 5 | Programa de avance de obras | 3 | NTP+10 | |||||||
| 6 | Plan de movilización | 3 | NTP+15 | |||||||
| 7 | Cartel de proyecto | 3 | NTP+15 | |||||||
| 8 | Plan de control de calidad | 3 | NTP+15 | |||||||
| 9 | Plan de protección medioambiental | 3 | NTP+15 | |||||||
| 10 | Certificado de gestión de residuos y escombros | 3 | Antes de Inspección final (IF) | |||||||
| 11 | Planos As-Builts | 3 | Antes de Inspección final (IF) | |||||||
| 12 | Datos espaciales | 3 | Antes de Inspección final (IF) | |||||||
| 13 | Personal clave | 3 | NTP+15 | |||||||
| 14 | Listado de personal | 3 | NTP+15 | |||||||
| 15 | Plan de salud y seguridad | 3 | NTP+15 | |||||||
| 16 | Manuales de Funcionamiento y Mantenimiento | 3 | Antes de Inspección final (IF) | |||||||
| SECCIÓN 26 20 00 | ||||||||||
| 17 | Tubo RMC y accesorios, 1 x tipo | 3 | ||||||||
| 18 | Tubo EMT y accesorios, 1 x tipo | 3 | ||||||||
| 19 | Tubo FMC y accesorios, 1 x tipo | 3 | ||||||||
| 20 | Canaleta metálica de superficie | 3 | ||||||||
| 21 | Canaleta metálica estanca | 3 | ||||||||
| 22 | Cajas de conexión y paso | 3 | ||||||||
| 23 | Conductores y cables | 3 | ||||||||
| 24 | Interruptores automáticos | 3 | ||||||||
| 25 | Cuadros | 3 | ||||||||
| 26 | Descargadores de sobretensiones | 3 | ||||||||
| 27 | Placas de mecanismos | 3 | ||||||||
| 28 | Enchufes | 3 | ||||||||
| 29 | Interruptores | 3 | ||||||||
| 30 | Etiquetas | 3 | ||||||||
| 31 | Cuadros | 3 | ||||||||
| 32 | Diagrama unifilar | 3 | ||||||||
| 33 | Dispositivos sujetos a operación manual | 3 | Aceptación Edificio -5 | |||||||
| 34 | Pruebas de cableado de 1000 voltios | 3 | Aceptación Edificio -5 | |||||||
| 35 | Cuadros | 3 | ||||||||
| 36 | Esquema unifialr del sistema eléctrico del edificio | 3 | ||||||||
| 37 | Diagrama esquemático del sistema de control eléctrico | 3 | ||||||||
| 38 | Manuales Uso y Mto de equipo eléctrico activo | 3 | ||||||||
| SECCIÓN 26 32 13.00 20 | ||||||||||
| 39 | Grupo electrógeno y equipo auxiliar | 3 | ||||||||
| 40 | Sistemas auxiliares | 3 | ||||||||
| 41 | Datos de grupo electrógeno | 3 | ||||||||
| 42 | Eficiencias de grupo electrógeno | 3 | ||||||||
| 43 | Motor diesel | 3 | ||||||||
| 44 | Grupo electrógeno y excitatriz | 3 | ||||||||
| 45 | Equipos y sistemas auxiliares | 3 | ||||||||
| 46 | Cálculos de capacidad del grupo electrógeno | 3 | ||||||||
| 47 | Cálculos de presión efectiva al freno | 3 | ||||||||
| 48 | Análisis por ordenador de fatiga por vibraciones | 3 | ||||||||
| 49 | Cálculos de capacidad de baterías | 3 | ||||||||
| 50 | Ensayos y pruebas de aceptación | 3 | Antes de ensayos funcionales | |||||||
| 51 | Ensayos funcionales de aceptación | 3 | Aceptación Edificio -15 | |||||||
| 52 | Procedimiento de ensayos funcionales de aceptación | 3 | ||||||||
| 53 | Certificado del sistema antivibracional | 3 | ||||||||
| 54 | Certificado del sistema de combustible | 3 | ||||||||
| 55 | Cualificación del técnico de puesta en marcha | 3 | ||||||||
| 56 | Cualificación del formador | 3 | ||||||||
| 57 | Pruebas del motor | 3 | Antes de embarque | |||||||
| 58 | Pruebas rutinarias del grupo electrógeno | 3 | Antes de embarque | |||||||
| 59 | Pruebas de diseño del grupo electrógeno | 3 | ||||||||
| 60 | Grupo electrógeno | 3 | ||||||||
| 61 | Equipos y sistemas auxiliares | 3 | ||||||||
| 62 | Manuales preliminares de operación y mantenimiento | 3 | ||||||||
| 63 | Instrucciones de funcionamiento expuestas | 3 | ||||||||
| 64 | Plan de formación | 3 | ||||||||
| SECCIÓN 26 36 00.00 10 | ||||||||||
| 65 | Planos de detalle | 3 | ||||||||
| 66 | Equipo | 3 | 3 | 3 | ||||||
| 67 | Instalación | 3 | ||||||||
| 68 | Materiales | 3 | 3 | |||||||
| 69 | Ensayos | 3 | Aceptación Edificio -7 | |||||||
| 70 | Equipo de conmutación | 3 | ||||||||
| 71 | Equipo de conmutación | 3 | ||||||||
| 72 | Instrucciones | 3 | ||||||||
| SECCIÓN 26 51 00 | ||||||||||
| 73 | Aparatos de alumbrado fluorescente | 3 | ||||||||
| 74 | Lámparas fluorescentes | 3 | ||||||||
| 75 | Reactancias fluorescentes electrónicas | 3 | ||||||||
| 76 | Alumbrado de emergencia | 3 | ||||||||
| 77 | Material montaje de luminarias | 3 | ||||||||
| 78 | Ensayos de funcionamiento | 3 | ||||||||
| 79 | Garantía de las reactancias electrónicas | 3 | ||||||||
| SECCIÓN 33 71 02.00 20 | ||||||||||
| 80 | Conductores de tierra | 3 | ||||||||
| 81 | Arquetas para lecturas de tierra | 3 | ||||||||
| 82 | Barras equipotenciales | 3 | ||||||||
| 83 | Picas de tierra | 3 | ||||||||
| 84 | Soldadura exotérmica | 3 | 3 | |||||||
| 85 | Ensayos y pruebas en obra | 3 |